Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.80 0.80 0.20
Reinforcement
12mm dia. Def. bars @ 6m std
No. 16 tie wire used
Column
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.20 0.30 2.10
Reinforcement
12mm dia. Def. bars @ 6m std Vertical bars
10mm dia. Ties 1@.05, 5@.15 rest @ .2m OC free end
No. 16 tie wire used
Wall Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.20 0.50 2.20
Reinforcement
12mm dia. Def. bars @ 6m std
No. 16 tie wire used
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 2.50 3.00
CHB Wall
6" CHB (Tooled Finish)
Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.25 3.00 3.00
Counterport
12mm dia. Vertical bars @ .25 OC 0.30 0.58 0.10
0.30 0.98 0.10
0.30 1.38 0.10
0.30 1.78 0.10
0.30 2.18 0.10
0.30 2.57 0.10
0.30 2.97 0.10
0.30 3.37 0.10
0.30 3.69 0.10
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.35 2.50 3.00
12mm dia. Shrinkage/Temp Bars @ .25 OC 5.38 x12
16mm dia. Continous Main Top Bars @ .15 OC 3.60 x16.67
16mm dia. Continous Main Bot Bars @ .20 OC 3.60 x12.5
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 2.50 3.00
4M High RW
Retaining Wall
12mm dia. Vertical bars @ .18 OC 5.46 x12
12mm dia. Vertical bars @ .18 OC 5.46 x12
12mm dia. Continous Horizontal bars @ .28 OC 3.60 x5.7 x2
12mm dia. Continous Horizontal bars @ .28 OC 3.60 x5.7 x2
12mm dia. Continous Horizontal bars @ .27 OC 3.60 x5.9 x2
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.25 4.85 3.00
Counterport
12mm dia. Vertical bars @ .28 OC 0.30 0.63 0.15
0.30 1.32 0.15
0.30 2.03 0.15
0.30 2.73 0.15
0.30 3.47 0.15
0.30 4.17 0.15
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.35 2.75 3.00
16mm dia. Shrinkage/Temp Bars @ .26 OC 6.40 11.54
16mm dia. Continous Main Top Bars @ .20 OC 3.60 13.75
16mm dia. Continous Main Bot Bars @ .27 OC 3.60 10.19
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 2.75 3.00
5M High RW
Retaining Wall
12mm dia. Vertical bars @ .20 OC 6.58 15.00
12mm dia. Vertical bars @ .20 OC 6.42 15.00
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x8.7 x2
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x8.7 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x9.58 x2
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.25 5.75 3.00
Counterport
12mm dia. Vertical bars @ .28 OC 0.30 0.49 0.15
0.30 1.17 0.15
0.30 1.66 0.15
0.30 2.14 0.15
0.30 2.63 0.15
0.30 3.10 0.15
0.30 3.58 0.15
0.30 4.08 0.15
0.30 4.56 0.15
0.30 5.03 0.15
0.30 5.53 0.15
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.45 3.50 3.00
12mm dia. Shrinkage/Temp Bars @ .20 OC 7.54 15.00
16mm dia. Continous Main Top Bars @ .20 OC 3.60 17.50
16mm dia. Continous Main Bot Bars @ .26 OC 3.60 13.46
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 3.50 3.00
6.5M High RW
Retaining Wall
12mm dia. Vertical bars @ .18 OC 7.99 16.67
12mm dia. Vertical bars @ .18 OC 7.95 16.67
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x10.90 x2
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x10.90 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x10.90 x2
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.30 7.20 3.00
Counterport
12mm dia. Vertical bars @ .22 OC 0.30 1.14 0.20
0.30 1.64 0.20
0.30 2.15 0.20
0.30 2.64 0.20
0.30 3.13 0.20
0.30 3.63 0.20
0.30 4.13 0.20
0.30 4.62 0.20
0.30 5.11 0.20
0.30 5.61 0.20
0.30 6.10 0.20
0.30 6.60 0.20
0.30 7.09 0.20
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.50 4.50 3.00
20mm dia. Shrinkage/Temp Bars @ .19 OC 1.90 15.79
16mm dia. Shrinkage/Temp Bars @ .20 OC 9.00 13.04
16mm dia. Continous Main Top Bars @ .23 OC 3.60 15.22
16mm dia. Continous Main Bot Bars @ .23 OC 3.60 15.22
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 4.50 3.00
7M High RW
Retaining Wall
12mm dia. Vertical bars @ .18 OC 8.51 16.67
12mm dia. Vertical bars @ .18 OC 8.47 16.67
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x11.66 x2
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x11.66 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x11.66 x2
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.30 7.70 3.00
Counterport
12mm dia. Vertical bars @ .22 OC 0.30 1.10 0.20
0.30 1.63 0.20
0.30 2.15 0.20
0.30 2.68 0.20
0.30 3.20 0.20
0.30 3.73 0.20
0.30 4.27 0.20
0.30 4.80 0.20
0.30 5.33 0.20
0.30 5.86 0.20
0.30 6.39 0.20
0.30 6.92 0.20
0.30 7.43 0.20
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.50 4.50 3.00
20mm dia. Shrinkage/Temp Bars @ .18 OC 1.90 16.67
16mm dia. Shrinkage/Temp Bars @ .23 OC 3.98 13.04
16mm dia. Shrinkage/Temp Bars @ .23 OC 5.02 13.04
16mm dia. Continous Main Top Bars @ .23 OC 3.60 28.13
16mm dia. Continous Main Bot Bars @ .22 OC 3.60 20.45
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 4.50 3.00
Excavation
Normal fence
Footing 0.38 92.00 Bay
Wall Footing 0.22 92.00 Bay
1.40 pcs
0.20 kgs
0.13 m3
2.00 pcs
4.00 pcs
0.50 kgs
0.22 m3
3.00 pcs
0.20 kgs
0.56 m3
5.36 m2
75 pcs
6 bags
0.5 m3
4 bags
0.2 m3
3 pcs
3 pcs
0.3 kgs
0.0285 m3
1 bags
0.1 m3
0.1 m3
3m
0.3 m
3.48 m2
10.8 m
50.40 m
51.12 m
36.00 m
75.60 m
213.12 m
2.25 m3
TL
0.58 0.30 1.86
0.98 0.30 2.66
1.38 0.30 3.46
1.78 0.30 4.26
2.18 0.30 5.06
2.57 0.30 5.84
2.97 0.30 6.64
3.37 0.30 7.44
3.69 0.30 8.08
45.30 m
10.24 m
0.84 m3
2.63 m3
64.56 m
60.01 m
45.00 m
105.01 m
0.56 m3
2.43 m2
32 pcs
3 bags
0.3 m3
2 bags
0.1 m3
2 pcs
1 pcs
0.2 kgs
0.027 m3
1 bags
0.1 m3
0.1 m3
3m
0.3 m
2.96 m2
10.2 m
65.52 m
65.52 m
41.04 m
41.04 m
42.48 m
255.60 m
3.64 m3
TL
0.63 0.30 2.01
1.32 0.30 3.39
2.03 0.30 4.81
2.73 0.30 6.21
3.47 0.30 7.69
4.17 0.30 9.09
33.20 m
25.60 m
0.9075 m3
2.89 m3
73.85
49.50
36.67
160.01 m
0.62 m3
2.43 m2
32 pcs
3 bags
0.3 m3
2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs
0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m
98.70 m
96.30 m
62.64 m
62.64 m
68.98 m
389.26 m
4.31 m3
TL
0.49 0.30 1.73
1.17 0.30 3.09
1.66 0.30 4.07
2.14 0.30 5.03
2.63 0.30 6.01
3.10 0.30 6.95
3.58 0.30 7.91
4.08 0.30 8.91
4.56 0.30 9.87
5.03 0.30 10.81
5.53 0.30 11.81
76.19 m
15.68 m
2.3175 m3
4.73 m3
113.10 m
63.00
48.46
111.46 m
0.79 m3
2.43 m2
32 pcs
3 bags
0.3 m3
2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs
0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m
133.17 m
132.50 m
78.48 m
78.48 m
78.48 m
501.11 m
6.48 m3
TL
1.14 0.30 3.08
1.64 0.30 4.08
2.15 0.30 5.10
2.64 0.30 6.08
3.13 0.30 7.06
3.63 0.30 8.06
4.13 0.30 9.06
4.62 0.30 10.04
5.11 0.30 11.02
5.61 0.30 12.02
6.10 0.30 13.00
6.60 0.30 14.00
7.09 0.30 14.98
117.58 m
46.25 m
3.447 m3
6.75 m3
30.00 m
117.39 m
54.78 m
54.78 m
109.57 m
1.01 m3
2.43 m2
32 pcs
3 bags
0.3 m3
2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs
0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m
141.83 m
141.17 m
83.95 m
83.95 m
83.95 m
534.86 m
6.93 m3
TL
1.10 0.30 3.00
1.63 0.30 4.06
2.15 0.30 5.10
2.68 0.30 6.16
3.20 0.30 7.20
3.73 0.30 8.26
4.27 0.30 9.34
4.80 0.30 10.40
5.33 0.30 11.46
5.86 0.30 12.52
6.39 0.30 13.58
6.92 0.30 14.64
7.43 0.30 15.66
121.38 m
48.55 m
3.696 m3
6.75 m3
31.67 m
51.91 m
65.48 m
101.25
73.64
292.28 m
1.01 m3
2.43 m2
32 pcs
3 bags
0.3 m3
2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs
0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m
35.33 m3
20.24 m3
55.57 m3
50.85 m3
177.90 m3
85.55 m3
324.00 m3
370.66 m3
1,064.53 m3
Project Title : Proposed Retaining Wal with CHB and Cyclone Fence
Location : Bayani Road, Brgy. Tungkong Mangga, City of San Jose Del Monte, Bulacan
Date : August 15, 2019
MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
1 GENERAL REQUIREMENTS
Mobilization / Demobilization 1.00 lot 170,000.00
Government Permits 1.00 lot 150,000.00
Temporary Water & Electricity Supply 1.00 lot 180,000.00
Temporary Facilities (Saff House, Barracks, etc.) 1.00 lot 200,000.00
Site Management 1.00 lot 500,000.00
Quality Assurance 1.00 lot 250,000.00
As-Built Plans 1.00 lot 80,000.00
Material Testing (FDT, Cylinder, etc.) 1.00 lot 50,000.00
General Requirements Sub-Total 1,580,000.00
2 SITE PREPARATION
Site Preparation / Layout (benchmarks, Surveyor) 1.00 lot 200,000.00 200,000.00 200,000.00
Dewatering 1.00 lot 150,000.00 150,000.00 150,000.00
Site Preparation Sub-Total 350,000.00 350,000.00
3 EARTHWORKS
Excavation 1,064.53 m3 300.00 319,359.00 60.00 63,871.80 383,230.80
Backfill (by Others) m3
Disposal 1.00 lot - 250,000.00 250,000.00 250,000.00
Heavy Equipments (Backhoe, Dump Truck, etc.) 1.00 lot 1,500,000.00
Compaction of Fill Areas (by Others) m2
1" Gravel Bedding 354.84 m3 1,500.00 532,265.00 300.00 106,453.00 638,718.00
Earthworks Sub-Total 851,624.00 420,324.80 2,771,948.80
Wall Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 20.24 m3 3,875.00 78,430.00 775.00 15,686.00 94,116.00
Reinforcement
12mm dia. Def. bars @ 6m std 276.00 pcs 226.00 62,376.00 45.20 12,475.20 74,851.20
No. 16 tie wire 18.40 kgs 90.00 1,656.00 18.00 331.20 1,987.20
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 51.75 m3 1,300.00 67,275.00 260.00 13,455.00 80,730.00
CHB Wall
6" CHB (Tooled Finish) 493.12 m2
6" CHB 6,900.00 pcs 20.00 138,000.00 4.00 27,600.00 165,600.00
Mortar @ 6" CHB (40kg Cement) 552.00 bags 211.00 116,472.00 42.20 23,294.40 139,766.40
Screened Sand 46.00 m3 1,200.00 55,200.00 240.00 11,040.00 66,240.00
12mm dia. Vert Bars used @ 6m std 184.00 pcs 226.00 41,584.00 45.20 8,316.80 49,900.80
12mm dia. Hor Bars used @ 6m std 92.00 pcs 226.00 20,792.00 45.20 4,158.40 24,950.40
No. 16 tie wire 27.60 kgs 90.00 2,484.00 18.00 496.80 2,980.80
75mm dia. Wip Hole - PVC Pipe 214.67 pcs 536.00 115,061.33 107.20 23,012.27 138,073.60
Counterport
12mm dia. Deformed Bars 99.17 pcs 226.00 22,412.15 45.20 4,482.43 26,894.58
2-16mm dia. Main Bars (Diagonal) 11.57 pcs 395.00 4,570.62 79.00 914.12 5,484.75
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 5.70 m3 3,875.00 22,068.90 775.00 4,413.78 26,482.68
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 17.80 m3 3,875.00 68,965.31 775.00 13,793.06 82,758.38
12mm dia. Shrinkage/Temp Bars @ .25 OC 72.95 pcs 226.00 16,487.33 45.20 3,297.47 19,784.80
16mm dia. Deformed Bars 118.66 pcs 395.00 46,872.11 79.00 9,374.42 56,246.53
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 3.81 m3 1,300.00 4,957.88 260.00 991.58 5,949.45
CHB Wall
6" CHB (Tooled Finsh) 16.48 m2
6" CHB 216.96 pcs 20.00 4,339.20 4.00 867.84 5,207.04
Mortar @ 6" CHB (40kg Cement) 20.34 bags 211.00 4,291.74 42.20 858.35 5,150.09
Screened Sand 2.03 m3 1,200.00 2,440.80 240.00 488.16 2,928.96
12mm dia. Vert Bars used @ 6m std 13.56 pcs 226.00 3,064.56 45.20 612.91 3,677.47
12mm dia. Hor Bars used @ 6m std 6.78 pcs 226.00 1,532.28 45.20 306.46 1,838.74
No. 16 tie wire used 1.36 kgs 90.00 122.04 18.00 24.41 146.45
75mm dia. Wip Hole - PVC Pipe 15.82 pcs 536.00 8,479.52 107.20 1,695.90 10,175.42
Counterport
12mm dia. Deformed Bars 241.01 pcs 226.00 54,467.73 45.20 10,893.55 65,361.27
4-16mm dia. Main Bars (Diagonal) 76.67 pcs 395.00 30,285.44 79.00 6,057.09 36,342.53
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 16.31 m3 3,875.00 63,192.63 775.00 12,638.53 75,831.15
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 51.89 m3 3,875.00 201,067.45 775.00 40,213.49 241,280.94
16mm dia. Deformed Bars 479.24 pcs 395.00 189,299.17 79.00 37,859.83 227,159.00
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 11.12 m3 1,300.00 14,454.62 260.00 2,890.92 17,345.54
CHB Wall
6" CHB (Tooled Finsh) 43.67 m2
6" CHB 575.04 pcs 20.00 11,500.80 4.00 2,300.16 13,800.96
Mortar @ 6" CHB (40kg Cement) 53.91 bags 211.00 11,375.01 42.20 2,275.00 13,650.01
Screened Sand 5.39 m3 1,200.00 6,469.20 240.00 1,293.84 7,763.04
12mm dia. Vert Bars used @ 6m std 35.94 pcs 226.00 8,122.44 45.20 1,624.49 9,746.93
12mm dia. Hor Bars used @ 6m std 17.97 pcs 226.00 4,061.22 45.20 812.24 4,873.46
No. 16 tie wire used 3.59 kgs 90.00 323.46 18.00 64.69 388.15
75mm dia. Wip Hole - PVC Pipe 41.93 pcs 536.00 22,474.48 107.20 4,494.90 26,969.38
Counterport
12mm dia. Deformed Bars 181.04 pcs 226.00 40,915.95 45.20 8,183.19 49,099.14
2-16mm dia. Main Bars (Diagonal) 17.74 pcs 395.00 7,009.09 79.00 1,401.82 8,410.91
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 15.74 m3 3,875.00 60,976.32 775.00 12,195.26 73,171.59
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 32.08 m3 3,875.00 124,320.66 775.00 24,864.13 149,184.79
12mm dia. Deformed Bars 127.99 pcs 226.00 28,926.08 45.20 5,785.22 34,711.29
16mm dia. Deformed Bars 126.14 pcs 395.00 49,824.24 79.00 9,964.85 59,789.08
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 5.35 m3 1,300.00 6,951.26 260.00 1,390.25 8,341.52
CHB Wall
6" CHB (Tooled Finsh) 16.50 m2
6" CHB 217.28 pcs 20.00 4,345.60 4.00 869.12 5,214.72
Mortar @ 6" CHB (40kg Cement) 20.37 bags 211.00 4,298.07 42.20 859.61 5,157.68
Screened Sand 2.04 m3 1,200.00 2,444.40 240.00 488.88 2,933.28
12mm dia. Vert Bars @ 6m std 13.58 pcs 226.00 3,069.08 45.20 613.82 3,682.90
12mm dia. Hor Bars @ 6m std 6.79 pcs 226.00 1,534.54 45.20 306.91 1,841.45
No. 16 tie wire 1.36 kgs 90.00 122.22 18.00 24.44 146.66
75mm dia. Wip Hole - PVC Pipe 15.84 pcs 536.00 8,492.03 107.20 1,698.41 10,190.43
Counterport
12mm dia. Deformed Bars 852.47 pcs 226.00 192,657.47 45.20 38,531.49 231,188.96
5-20mm dia. Main Bars (Diagonal) 154.17 pcs 1,050.00 161,875.00 210.00 32,375.00 194,250.00
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 3.45 m3 3,875.00 13,357.13 775.00 2,671.43 16,028.55
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 135.00 m3 3,875.00 523,125.00 775.00 104,625.00 627,750.00
20mm dia. Deformed Bars 100.00 pcs 1,050.00 105,000.00 210.00 21,000.00 126,000.00
16mm dia. Deformed Bars 365.22 pcs 396.00 144,626.09 79.20 28,925.22 173,551.30
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 20.25 m3 1,300.00 26,325.00 260.00 5,265.00 31,590.00
CHB Wall
6" CHB (Tooled Finish) 48.60 m2
6" CHB 640.00 pcs 20.00 12,800.00 4.00 2,560.00 15,360.00
Mortar @ 6" CHB (40kg Cement) 60.00 bags 211.00 12,660.00 42.20 2,532.00 15,192.00
Screened Sand 6.00 m3 1,200.00 7,200.00 240.00 1,440.00 8,640.00
12mm dia. Vert Bars @ 6m std 40.00 pcs 226.00 9,040.00 45.20 1,808.00 10,848.00
12mm dia. Hor Bars @ 6m std 20.00 pcs 226.00 4,520.00 45.20 904.00 5,424.00
No. 16 tie wire 4.00 kgs 90.00 360.00 18.00 72.00 432.00
75mm dia. Wip Hole - PVC Pipe 46.67 pcs 536.00 25,013.33 107.20 5,002.67 30,016.00
Counterport
12mm dia. Deformed Bars 1,020.37 pcs 226.00 230,604.01 45.20 46,120.80 276,724.81
5-20mm dia. Main Bars (Diagonal) 185.14 pcs 1,050.00 194,394.20 210.00 38,878.84 233,273.04
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 84.56 m3 3,875.00 327,687.36 775.00 65,537.47 393,224.83
Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 154.44 m3 3,875.00 598,455.00 775.00 119,691.00 718,146.00
20mm dia. Deformed Bars 120.76 pcs 1,050.00 126,793.33 210.00 25,358.67 152,152.00
16mm dia. Deformed Bars 1,114.55 pcs 395.00 440,248.11 79.00 88,049.62 528,297.73
Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 23.17 m3 1,300.00 30,115.80 260.00 6,023.16 36,138.96
CHB Wall
6" CHB (Tooled Finsh) 55.60 m2 - - - -
6" CHB 732.16 pcs 20.00 14,643.20 4.00 2,928.64 17,571.84
Mortar @ 6" CHB (40kg Cement) 68.64 bags 211.00 14,483.04 42.20 2,896.61 17,379.65
Screened Sand 6.86 m3 1,200.00 8,236.80 240.00 1,647.36 9,884.16
12mm dia. Vert Bars @ 6m std 45.76 pcs 226.00 10,341.76 45.20 2,068.35 12,410.11
12mm dia. Hor Bars @ 6m std 22.88 pc 226.00 5,170.88 45.20 1,034.18 6,205.06
No. 16 tie wire 4.58 kgs 90.00 411.84 18.00 82.37 494.21
75mm dia. Wip Hole - PVC Pipe 53.39 pcs 536.00 28,615.25 107.20 5,723.05 34,338.30