You are on page 1of 30

Normal Fence

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.80 0.80 0.20
Reinforcement
12mm dia. Def. bars @ 6m std
No. 16 tie wire used

Column
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.20 0.30 2.10
Reinforcement
12mm dia. Def. bars @ 6m std Vertical bars
10mm dia. Ties 1@.05, 5@.15 rest @ .2m OC free end
No. 16 tie wire used

Wall Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.20 0.50 2.20
Reinforcement
12mm dia. Def. bars @ 6m std
No. 16 tie wire used

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 2.50 3.00

CHB Wall
6" CHB (Tooled Finish)
Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand

Plaster (Two faces of the wall)


No. of Cement bags
Vol. of Fine Sand
No. of Vert Bars used @ 6m std
No. of Hor Bars used @ 6m std
No. 16 tie wire used

Stiffener Block 0.10 0.10 2.85


No. of Cement bags
Vol. of Fine Sand
Vol. of 3/4 " Gravel
1-12mm dia. Continous Hor. Bars
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe
4" Cyclone Wire
2" dia. G.I. Pipe Sch. 20
3M High RW
Retaining Wall
12mm dia. Vertical bars @ .25 OC 4.20 x12
12mm dia. Vertical bars @ .25 OC 4.26 x12
12mm dia. Continous Horizontal bars @ .30 OC 3.60 x5 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x10.5 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.25 3.00 3.00

Counterport
12mm dia. Vertical bars @ .25 OC 0.30 0.58 0.10
0.30 0.98 0.10
0.30 1.38 0.10
0.30 1.78 0.10
0.30 2.18 0.10
0.30 2.57 0.10
0.30 2.97 0.10
0.30 3.37 0.10
0.30 3.69 0.10

12mm dia. Horizontal bars @ .25 OC 0.30 0.33 0.10


0.30 0.49 0.10
0.30 0.66 0.10
0.30 0.80 0.10
0.30 0.98 0.10
0.30 1.12 0.10
0.30 1.28 0.10
0.30 1.44 0.10
0.30 1.60 0.10
0.30 1.75 0.10
0.30 1.92 0.10
0.30 2.07 0.10
0.30 2.24 0.10

2-16mm dia. Main Bars (Diagonal) 5.12 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 4.20 0.20

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.35 2.50 3.00
12mm dia. Shrinkage/Temp Bars @ .25 OC 5.38 x12
16mm dia. Continous Main Top Bars @ .15 OC 3.60 x16.67
16mm dia. Continous Main Bot Bars @ .20 OC 3.60 x12.5

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 2.50 3.00

6" CHB (Tooled Finsh)


Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand
Plaster (Two faces of the wall)
No. of Cement bags
Vol. of Fine Sand
No. of Vert Bars used @ 6m std
No. of Hor Bars used @ 6m std
No. 16 tie wire used

Stiffener Block 0.10 0.10 2.70


No. of Cement bags
Vol. of Fine Sand
Vol. of 3/4 " Gravel
1-12mm dia. Continous Hor. Bars
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe
4" Cyclone Wire
2" dia. G.I. Pipe Sch. 20

4M High RW
Retaining Wall
12mm dia. Vertical bars @ .18 OC 5.46 x12
12mm dia. Vertical bars @ .18 OC 5.46 x12
12mm dia. Continous Horizontal bars @ .28 OC 3.60 x5.7 x2
12mm dia. Continous Horizontal bars @ .28 OC 3.60 x5.7 x2
12mm dia. Continous Horizontal bars @ .27 OC 3.60 x5.9 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.25 4.85 3.00

Counterport
12mm dia. Vertical bars @ .28 OC 0.30 0.63 0.15
0.30 1.32 0.15
0.30 2.03 0.15
0.30 2.73 0.15
0.30 3.47 0.15
0.30 4.17 0.15

12mm dia. Horizontal bars @ .28 OC 0.30 0.34 0.15


0.30 0.40 0.15
0.30 0.47 0.15
0.30 0.54 0.15
0.30 0.61 0.15
0.30 0.68 0.15
0.30 0.74 0.15
0.30 0.81 0.15
0.30 0.88 0.15
0.30 0.95 0.15
0.30 1.01 0.15
0.30 1.10 0.15
0.30 1.14 0.15
0.30 1.14 0.15
0.30 1.14 0.15
0.30 1.14 0.15
0.30 1.14 0.15
0.30 1.14 0.15
0.30 1.14 0.15

4-16mm dia. Main Bars (Diagonal) 6.40 x4

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 3.63 0.25

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.35 2.75 3.00
16mm dia. Shrinkage/Temp Bars @ .26 OC 6.40 11.54
16mm dia. Continous Main Top Bars @ .20 OC 3.60 13.75
16mm dia. Continous Main Bot Bars @ .27 OC 3.60 10.19

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 2.75 3.00

6" CHB (Tooled Finsh)


Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand
Plaster (Two faces of the wall)
No. of Cement bags
Vol. of Fine Sand
No. of Vert Bars used @ 6m std
No. of Hor Bars used @ 6m std
No. 16 tie wire used

Stiffener Block 0.10 0.10 2.70


No. of Cement bags
Vol. of Fine Sand
Vol. of 3/4 " Gravel
1-12mm dia. Continous Hor. Bars
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe
4" Cyclone Wire
2" dia. G.I. Pipe Sch. 20

5M High RW
Retaining Wall
12mm dia. Vertical bars @ .20 OC 6.58 15.00
12mm dia. Vertical bars @ .20 OC 6.42 15.00
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x8.7 x2
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x8.7 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x9.58 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.25 5.75 3.00

Counterport
12mm dia. Vertical bars @ .28 OC 0.30 0.49 0.15
0.30 1.17 0.15
0.30 1.66 0.15
0.30 2.14 0.15
0.30 2.63 0.15
0.30 3.10 0.15
0.30 3.58 0.15
0.30 4.08 0.15
0.30 4.56 0.15
0.30 5.03 0.15
0.30 5.53 0.15

12mm dia. Horizontal bars @ .28 OC 0.30 3.21 0.15


0.30 3.14 0.15
0.30 2.98 0.15
0.30 2.78 0.15
0.30 2.66 0.15
0.30 2.47 0.15
0.30 2.31 0.15
0.30 2.15 0.15
0.30 2.01 0.15
0.30 1.84 0.15
0.30 1.68 0.15
0.30 1.51 0.15
0.30 1.33 0.15
0.30 1.18 0.15
0.30 1.02 0.15
0.30 0.87 0.15
0.30 0.71 0.15
0.30 0.54 0.15
0.30 0.38 0.15

2-16mm dia. Main Bars (Diagonal) 7.84 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 9.27 0.25

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.45 3.50 3.00
12mm dia. Shrinkage/Temp Bars @ .20 OC 7.54 15.00
16mm dia. Continous Main Top Bars @ .20 OC 3.60 17.50
16mm dia. Continous Main Bot Bars @ .26 OC 3.60 13.46

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 3.50 3.00

6" CHB (Tooled Finsh)


Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand
Plaster (Two faces of the wall)
No. of Cement bags
Vol. of Fine Sand
No. of Vert Bars used @ 6m std
No. of Hor Bars used @ 6m std
No. 16 tie wire used

Stiffener Block 0.10 0.10 2.70


No. of Cement bags
Vol. of Fine Sand
Vol. of 3/4 " Gravel
1-12mm dia. Continous Hor. Bars
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe
4" Cyclone Wire
2" dia. G.I. Pipe Sch. 20

6.5M High RW
Retaining Wall
12mm dia. Vertical bars @ .18 OC 7.99 16.67
12mm dia. Vertical bars @ .18 OC 7.95 16.67
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x10.90 x2
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x10.90 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x10.90 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.30 7.20 3.00

Counterport
12mm dia. Vertical bars @ .22 OC 0.30 1.14 0.20
0.30 1.64 0.20
0.30 2.15 0.20
0.30 2.64 0.20
0.30 3.13 0.20
0.30 3.63 0.20
0.30 4.13 0.20
0.30 4.62 0.20
0.30 5.11 0.20
0.30 5.61 0.20
0.30 6.10 0.20
0.30 6.60 0.20
0.30 7.09 0.20

12mm dia. Horizontal bars @ .22 OC 0.30 0.36 0.20


0.30 0.46 0.20
0.30 0.54 0.20
0.30 0.66 0.20
0.30 0.75 0.20
0.30 0.85 0.20
0.30 0.95 0.20
0.30 1.05 0.20
0.30 1.15 0.20
0.30 1.24 0.20
0.30 1.34 0.20
0.30 1.43 0.20
0.30 1.56 0.20
0.30 1.63 0.20
0.30 1.73 0.20
0.30 1.83 0.20
0.30 1.93 0.20
0.30 2.03 0.20
0.30 2.12 0.20
0.30 2.23 0.20
0.30 2.31 0.20
0.30 2.42 0.20
0.30 2.50 0.20
0.30 2.61 0.20
0.30 2.71 0.20
0.30 2.81 0.20
0.30 2.90 0.20
0.30 3.00 0.20
0.30 3.09 0.20
0.30 3.20 0.20
0.30 3.29 0.20

5-20mm dia. Main Bars (Diagonal) 9.25 x5

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 11.49 0.30

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.50 4.50 3.00
20mm dia. Shrinkage/Temp Bars @ .19 OC 1.90 15.79
16mm dia. Shrinkage/Temp Bars @ .20 OC 9.00 13.04
16mm dia. Continous Main Top Bars @ .23 OC 3.60 15.22
16mm dia. Continous Main Bot Bars @ .23 OC 3.60 15.22

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 4.50 3.00

6" CHB (Tooled Finsh)


Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand
Plaster (Two faces of the wall)
No. of Cement bags
Vol. of Fine Sand
No. of Vert Bars used @ 6m std
No. of Hor Bars used @ 6m std
No. 16 tie wire used

Stiffener Block 0.10 0.10 2.70


No. of Cement bags
Vol. of Fine Sand
Vol. of 3/4 " Gravel
1-12mm dia. Continous Hor. Bars
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe
4" Cyclone Wire
2" dia. G.I. Pipe Sch. 20

7M High RW
Retaining Wall
12mm dia. Vertical bars @ .18 OC 8.51 16.67
12mm dia. Vertical bars @ .18 OC 8.47 16.67
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x11.66 x2
12mm dia. Continous Horizontal bars @ .22 OC 3.60 x11.66 x2
12mm dia. Continous Horizontal bars @ .20 OC 3.60 x11.66 x2

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.30 7.70 3.00

Counterport
12mm dia. Vertical bars @ .22 OC 0.30 1.10 0.20
0.30 1.63 0.20
0.30 2.15 0.20
0.30 2.68 0.20
0.30 3.20 0.20
0.30 3.73 0.20
0.30 4.27 0.20
0.30 4.80 0.20
0.30 5.33 0.20
0.30 5.86 0.20
0.30 6.39 0.20
0.30 6.92 0.20
0.30 7.43 0.20

12mm dia. Horizontal bars @ .22 OC 0.30 3.31 0.20


0.30 3.21 0.20
0.30 3.14 0.20
0.30 3.03 0.20
0.30 2.94 0.20
0.30 2.84 0.20
0.30 2.75 0.20
0.30 2.66 0.20
0.30 2.57 0.20
0.30 2.48 0.20
0.30 2.38 0.20
0.30 2.30 0.20
0.30 2.20 0.20
0.30 2.10 0.20
0.30 2.03 0.20
0.30 1.93 0.20
0.30 1.84 0.20
0.30 1.74 0.20
0.30 1.65 0.20
0.30 1.56 0.20
0.30 1.48 0.20
0.30 1.38 0.20
0.30 1.29 0.20
0.30 1.19 0.20
0.30 1.11 0.20
0.30 1.01 0.20
0.30 0.93 0.20
0.30 0.83 0.20
0.30 0.74 0.20
0.30 0.65 0.20
0.30 0.56 0.20
0.30 0.47 0.20

5-20mm dia. Main Bars (Diagonal) 9.71 x5

Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 12.32 0.30

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 0.50 4.50 3.00
20mm dia. Shrinkage/Temp Bars @ .18 OC 1.90 16.67
16mm dia. Shrinkage/Temp Bars @ .23 OC 3.98 13.04
16mm dia. Shrinkage/Temp Bars @ .23 OC 5.02 13.04
16mm dia. Continous Main Top Bars @ .23 OC 3.60 28.13
16mm dia. Continous Main Bot Bars @ .22 OC 3.60 20.45

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 0.075 4.50 3.00

6" CHB (Tooled Finsh)


Total Number of 6" CHB
Mortar @ 6" CHB (40kg Cement)
Vol. of Screened Sand
Plaster (Two faces of the wall)
No. of Cement bags
Vol. of Fine Sand
No. of Vert Bars used @ 6m std
No. of Hor Bars used @ 6m std
No. 16 tie wire used

Stiffener Block 0.10 0.10 2.70


No. of Cement bags
Vol. of Fine Sand
Vol. of 3/4 " Gravel
1-12mm dia. Continous Hor. Bars
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe
4" Cyclone Wire
2" dia. G.I. Pipe Sch. 20

Excavation
Normal fence
Footing 0.38 92.00 Bay
Wall Footing 0.22 92.00 Bay

3M High RW 7.50 6.78 Bay


4M High RW 9.90 17.97 Bay
5M High RW 12.60 6.79 Bay
6.5M High RW 16.20 20.00 Bay
7M High RW 16.20 22.88 Bay
0.13 m3

1.40 pcs
0.20 kgs

0.13 m3

2.00 pcs
4.00 pcs
0.50 kgs

0.22 m3

3.00 pcs
0.20 kgs

0.56 m3

5.36 m2
75 pcs
6 bags
0.5 m3

4 bags
0.2 m3
3 pcs
3 pcs
0.3 kgs

0.0285 m3
1 bags
0.1 m3
0.1 m3
3m
0.3 m
3.48 m2
10.8 m
50.40 m
51.12 m
36.00 m
75.60 m
213.12 m
2.25 m3

TL
0.58 0.30 1.86
0.98 0.30 2.66
1.38 0.30 3.46
1.78 0.30 4.26
2.18 0.30 5.06
2.57 0.30 5.84
2.97 0.30 6.64
3.37 0.30 7.44
3.69 0.30 8.08
45.30 m

0.33 0.30 1.36


0.49 0.30 1.68
0.66 0.30 2.02
0.80 0.30 2.30
0.98 0.30 2.66
1.12 0.30 2.94
1.28 0.30 3.26
1.44 0.30 3.58
1.60 0.30 3.90
1.75 0.30 4.20
1.92 0.30 4.54
2.07 0.30 4.84
2.24 0.30 5.18
42.46 m

10.24 m

0.84 m3

2.63 m3
64.56 m
60.01 m
45.00 m
105.01 m

0.56 m3

2.43 m2
32 pcs
3 bags
0.3 m3

2 bags
0.1 m3
2 pcs
1 pcs
0.2 kgs

0.027 m3
1 bags
0.1 m3
0.1 m3
3m
0.3 m
2.96 m2
10.2 m

65.52 m
65.52 m
41.04 m
41.04 m
42.48 m
255.60 m
3.64 m3

TL
0.63 0.30 2.01
1.32 0.30 3.39
2.03 0.30 4.81
2.73 0.30 6.21
3.47 0.30 7.69
4.17 0.30 9.09
33.20 m

0.34 0.30 1.43


0.40 0.30 1.55
0.47 0.30 1.69
0.54 0.30 1.83
0.61 0.30 1.97
0.68 0.30 2.11
0.74 0.30 2.23
0.81 0.30 2.37
0.88 0.30 2.51
0.95 0.30 2.65
1.01 0.30 2.77
1.10 0.30 2.95
1.14 0.30 3.03
1.14 0.30 3.03
1.14 0.30 3.03
1.14 0.30 3.03
1.14 0.30 3.03
1.14 0.30 3.03
1.14 0.30 3.03
47.27 m 80.47

25.60 m

0.9075 m3

2.89 m3
73.85
49.50
36.67
160.01 m

0.62 m3

2.43 m2
32 pcs
3 bags
0.3 m3

2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs

0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m

98.70 m
96.30 m
62.64 m
62.64 m
68.98 m
389.26 m
4.31 m3

TL
0.49 0.30 1.73
1.17 0.30 3.09
1.66 0.30 4.07
2.14 0.30 5.03
2.63 0.30 6.01
3.10 0.30 6.95
3.58 0.30 7.91
4.08 0.30 8.91
4.56 0.30 9.87
5.03 0.30 10.81
5.53 0.30 11.81
76.19 m

3.21 0.30 7.17


3.14 0.30 7.03
2.98 0.30 6.71
2.78 0.30 6.31
2.66 0.30 6.07
2.47 0.30 5.69
2.31 0.30 5.37
2.15 0.30 5.05
2.01 0.30 4.77
1.84 0.30 4.43
1.68 0.30 4.11
1.51 0.30 3.77
1.33 0.30 3.41
1.18 0.30 3.11
1.02 0.30 2.79
0.87 0.30 2.49
0.71 0.30 2.17
0.54 0.30 1.83
0.38 0.30 1.51
83.79 m 159.98

15.68 m

2.3175 m3

4.73 m3
113.10 m
63.00
48.46
111.46 m

0.79 m3

2.43 m2
32 pcs
3 bags
0.3 m3

2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs

0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m

133.17 m
132.50 m
78.48 m
78.48 m
78.48 m
501.11 m
6.48 m3

TL
1.14 0.30 3.08
1.64 0.30 4.08
2.15 0.30 5.10
2.64 0.30 6.08
3.13 0.30 7.06
3.63 0.30 8.06
4.13 0.30 9.06
4.62 0.30 10.04
5.11 0.30 11.02
5.61 0.30 12.02
6.10 0.30 13.00
6.60 0.30 14.00
7.09 0.30 14.98
117.58 m

0.36 0.30 1.52


0.46 0.30 1.72
0.54 0.30 1.88
0.66 0.30 2.12
0.75 0.30 2.30
0.85 0.30 2.50
0.95 0.30 2.70
1.05 0.30 2.90
1.15 0.30 3.10
1.24 0.30 3.28
1.34 0.30 3.48
1.43 0.30 3.66
1.56 0.30 3.92
1.63 0.30 4.06
1.73 0.30 4.26
1.83 0.30 4.46
1.93 0.30 4.66
2.03 0.30 4.86
2.12 0.30 5.04
2.23 0.30 5.26
2.31 0.30 5.42
2.42 0.30 5.64
2.50 0.30 5.80
2.61 0.30 6.02
2.71 0.30 6.22
2.81 0.30 6.42
2.90 0.30 6.60
3.00 0.30 6.80
3.09 0.30 6.98
3.20 0.30 7.20
3.29 0.30 7.38
138.16 m 255.74

46.25 m

3.447 m3

6.75 m3
30.00 m
117.39 m
54.78 m
54.78 m
109.57 m

1.01 m3

2.43 m2
32 pcs
3 bags
0.3 m3

2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs

0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m
141.83 m
141.17 m
83.95 m
83.95 m
83.95 m
534.86 m
6.93 m3

TL
1.10 0.30 3.00
1.63 0.30 4.06
2.15 0.30 5.10
2.68 0.30 6.16
3.20 0.30 7.20
3.73 0.30 8.26
4.27 0.30 9.34
4.80 0.30 10.40
5.33 0.30 11.46
5.86 0.30 12.52
6.39 0.30 13.58
6.92 0.30 14.64
7.43 0.30 15.66
121.38 m

3.31 0.30 7.42


3.21 0.30 7.22
3.14 0.30 7.08
3.03 0.30 6.86
2.94 0.30 6.68
2.84 0.30 6.48
2.75 0.30 6.30
2.66 0.30 6.12
2.57 0.30 5.94
2.48 0.30 5.76
2.38 0.30 5.56
2.30 0.30 5.40
2.20 0.30 5.20
2.10 0.30 5.00
2.03 0.30 4.86
1.93 0.30 4.66
1.84 0.30 4.48
1.74 0.30 4.28
1.65 0.30 4.10
1.56 0.30 3.92
1.48 0.30 3.76
1.38 0.30 3.56
1.29 0.30 3.38
1.19 0.30 3.18
1.11 0.30 3.02
1.01 0.30 2.82
0.93 0.30 2.66
0.83 0.30 2.46
0.74 0.30 2.28
0.65 0.30 2.10
0.56 0.30 1.92
0.47 0.30 1.74
146.20 m 267.58

48.55 m

3.696 m3

6.75 m3
31.67 m
51.91 m
65.48 m
101.25
73.64
292.28 m

1.01 m3

2.43 m2
32 pcs
3 bags
0.3 m3

2 bags
0.1 m3
2 pcs
1 pc
0.2 kgs

0.027 m3
1 bags
0.1 m3
0.1 m3
3 pcs
0.3 m
2.96 m2
10.2 m

35.33 m3
20.24 m3
55.57 m3

50.85 m3
177.90 m3
85.55 m3
324.00 m3
370.66 m3

1,064.53 m3
Project Title : Proposed Retaining Wal with CHB and Cyclone Fence
Location : Bayani Road, Brgy. Tungkong Mangga, City of San Jose Del Monte, Bulacan
Date : August 15, 2019

Subject : Bill of Quantities

MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT

1 GENERAL REQUIREMENTS
Mobilization / Demobilization 1.00 lot 170,000.00
Government Permits 1.00 lot 150,000.00
Temporary Water & Electricity Supply 1.00 lot 180,000.00
Temporary Facilities (Saff House, Barracks, etc.) 1.00 lot 200,000.00
Site Management 1.00 lot 500,000.00
Quality Assurance 1.00 lot 250,000.00
As-Built Plans 1.00 lot 80,000.00
Material Testing (FDT, Cylinder, etc.) 1.00 lot 50,000.00
General Requirements Sub-Total 1,580,000.00

2 SITE PREPARATION
Site Preparation / Layout (benchmarks, Surveyor) 1.00 lot 200,000.00 200,000.00 200,000.00
Dewatering 1.00 lot 150,000.00 150,000.00 150,000.00
Site Preparation Sub-Total 350,000.00 350,000.00

3 EARTHWORKS
Excavation 1,064.53 m3 300.00 319,359.00 60.00 63,871.80 383,230.80
Backfill (by Others) m3
Disposal 1.00 lot - 250,000.00 250,000.00 250,000.00
Heavy Equipments (Backhoe, Dump Truck, etc.) 1.00 lot 1,500,000.00
Compaction of Fill Areas (by Others) m2
1" Gravel Bedding 354.84 m3 1,500.00 532,265.00 300.00 106,453.00 638,718.00
Earthworks Sub-Total 851,624.00 420,324.80 2,771,948.80

4 PERIMETER FENCE WITH CYCLONE WIRE 276.00 m 92.00 Bays


Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 11.78 m3 3,875.00 45,632.00 775.00 9,126.40 54,758.40
Reinforcement
12mm dia. Def. bars @ 6m std 128.80 pcs 226.00 29,108.80 45.20 5,821.76 34,930.56
No. 16 tie wire used 18.40 kgs 90.00 1,656.00 18.00 331.20 1,987.20

Page 23 BOQ - Fence


MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
Column
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 11.59 m3 3,875.00 44,919.00 775.00 8,983.80 53,902.80
Reinforcement
12mm dia. Def. bars @ 6m std Vertical bars 184.00 pcs 226.00 41,584.00 45.20 8,316.80 49,900.80
10mm dia. Ties 1@.05, 5@.15 rest @ .2m OC free end 368.00 pcs 158.00 58,144.00 31.60 11,628.80 69,772.80
No. 16 tie wire 46.00 kgs 90.00 4,140.00 18.00 828.00 4,968.00

Wall Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 20.24 m3 3,875.00 78,430.00 775.00 15,686.00 94,116.00
Reinforcement
12mm dia. Def. bars @ 6m std 276.00 pcs 226.00 62,376.00 45.20 12,475.20 74,851.20
No. 16 tie wire 18.40 kgs 90.00 1,656.00 18.00 331.20 1,987.20

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 51.75 m3 1,300.00 67,275.00 260.00 13,455.00 80,730.00

CHB Wall
6" CHB (Tooled Finish) 493.12 m2
6" CHB 6,900.00 pcs 20.00 138,000.00 4.00 27,600.00 165,600.00
Mortar @ 6" CHB (40kg Cement) 552.00 bags 211.00 116,472.00 42.20 23,294.40 139,766.40
Screened Sand 46.00 m3 1,200.00 55,200.00 240.00 11,040.00 66,240.00
12mm dia. Vert Bars used @ 6m std 184.00 pcs 226.00 41,584.00 45.20 8,316.80 49,900.80
12mm dia. Hor Bars used @ 6m std 92.00 pcs 226.00 20,792.00 45.20 4,158.40 24,950.40
No. 16 tie wire 27.60 kgs 90.00 2,484.00 18.00 496.80 2,980.80
75mm dia. Wip Hole - PVC Pipe 214.67 pcs 536.00 115,061.33 107.20 23,012.27 138,073.60

Plaster (Two faces of the wall - Tooled Finish)


Cement bags 368.00 bags 211.00 77,648.00 42.20 15,529.60 93,177.60
Fine Sand 18.40 m3 1,250.00 23,000.00 250.00 4,600.00 27,600.00

Stiffener Block 2.62 m3


Cement bags 92.00 bags 211.00 19,412.00 42.20 3,882.40 23,294.40
Fine Sand 9.20 m3 1,250.00 11,500.00 250.00 2,300.00 13,800.00
3/4 " Gravel 9.20 m3 1,300.00 11,960.00 260.00 2,392.00 14,352.00
1-12mm dia. Continous Hor. Bars 276.00 pcs 226.00 62,376.00 45.20 12,475.20 74,851.20
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe 27.60 pcs 158.00 4,360.80 31.60 872.16 5,232.96
4" Cyclone Wire 320.16 m2 390.00 124,862.40 78.00 24,972.48 149,834.88
2" dia. G.I. Pipe Sch. 20 165.60 pcs 3,100.00 513,360.00 620.00 102,672.00 616,032.00
Perimeter Fence With Cyclone Wire - Sub-Total 1,772,993.33 354,598.67 2,127,592.00

Page 24 BOQ - Fence


MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
5 3.00 M HIGH RETAINING WALL 20.34 m 6.78 Bays
Retaining Wall
12mm dia. Deformed Bars 240.83 pcs 226.00 54,426.59 45.20 10,885.32 65,311.90
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 15.26 m3 3,875.00 59,113.13 775.00 11,822.63 70,935.75

Counterport
12mm dia. Deformed Bars 99.17 pcs 226.00 22,412.15 45.20 4,482.43 26,894.58
2-16mm dia. Main Bars (Diagonal) 11.57 pcs 395.00 4,570.62 79.00 914.12 5,484.75
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 5.70 m3 3,875.00 22,068.90 775.00 4,413.78 26,482.68

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 17.80 m3 3,875.00 68,965.31 775.00 13,793.06 82,758.38
12mm dia. Shrinkage/Temp Bars @ .25 OC 72.95 pcs 226.00 16,487.33 45.20 3,297.47 19,784.80
16mm dia. Deformed Bars 118.66 pcs 395.00 46,872.11 79.00 9,374.42 56,246.53

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 3.81 m3 1,300.00 4,957.88 260.00 991.58 5,949.45

CHB Wall
6" CHB (Tooled Finsh) 16.48 m2
6" CHB 216.96 pcs 20.00 4,339.20 4.00 867.84 5,207.04
Mortar @ 6" CHB (40kg Cement) 20.34 bags 211.00 4,291.74 42.20 858.35 5,150.09
Screened Sand 2.03 m3 1,200.00 2,440.80 240.00 488.16 2,928.96
12mm dia. Vert Bars used @ 6m std 13.56 pcs 226.00 3,064.56 45.20 612.91 3,677.47
12mm dia. Hor Bars used @ 6m std 6.78 pcs 226.00 1,532.28 45.20 306.46 1,838.74
No. 16 tie wire used 1.36 kgs 90.00 122.04 18.00 24.41 146.45
75mm dia. Wip Hole - PVC Pipe 15.82 pcs 536.00 8,479.52 107.20 1,695.90 10,175.42

Plaster (Two faces of the wall - Tooled Finish)


Cement bags 13.56 bags 211.00 2,861.16 42.20 572.23 3,433.39
Fine Sand 0.68 m3 1,250.00 847.50 250.00 169.50 1,017.00

Stiffener Block 0.18 m3


Cement bags 6.78 bags 211.00 1,430.58 42.20 286.12 1,716.70
Fine Sand 0.68 m3 1,250.00 847.50 250.00 169.50 1,017.00
3/4 " Gravel 0.68 m3 1,300.00 881.40 260.00 176.28 1,057.68
1-12mm dia. Continous Hor. Bars 20.34 pcs 226.00 4,596.84 45.20 919.37 5,516.21
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe 2.03 pcs 158.00 321.37 31.60 64.27 385.65
4" Cyclone Wire 20.07 m2 390.00 7,826.83 78.00 1,565.37 9,392.20
2" dia. G.I. Pipe Sch. 20 11.53 pcs 3,100.00 35,730.60 620.00 7,146.12 42,876.72
3.00 M High Retaining Wall - Sub-Total 379,487.93 75,897.59 455,385.52
Page 25 BOQ - Fence
MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
6 4.00 M HIGH RETAINING WALL 53.92 m 17.97 Bays
Retaining Wall
12mm dia. Deformed Bars 765.52 pcs 226.00 173,007.97 45.20 34,601.59 207,609.57
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 65.37 m3 3,875.00 253,292.77 775.00 50,658.55 303,951.32

Counterport
12mm dia. Deformed Bars 241.01 pcs 226.00 54,467.73 45.20 10,893.55 65,361.27
4-16mm dia. Main Bars (Diagonal) 76.67 pcs 395.00 30,285.44 79.00 6,057.09 36,342.53
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 16.31 m3 3,875.00 63,192.63 775.00 12,638.53 75,831.15

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 51.89 m3 3,875.00 201,067.45 775.00 40,213.49 241,280.94
16mm dia. Deformed Bars 479.24 pcs 395.00 189,299.17 79.00 37,859.83 227,159.00

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 11.12 m3 1,300.00 14,454.62 260.00 2,890.92 17,345.54

CHB Wall
6" CHB (Tooled Finsh) 43.67 m2
6" CHB 575.04 pcs 20.00 11,500.80 4.00 2,300.16 13,800.96
Mortar @ 6" CHB (40kg Cement) 53.91 bags 211.00 11,375.01 42.20 2,275.00 13,650.01
Screened Sand 5.39 m3 1,200.00 6,469.20 240.00 1,293.84 7,763.04
12mm dia. Vert Bars used @ 6m std 35.94 pcs 226.00 8,122.44 45.20 1,624.49 9,746.93
12mm dia. Hor Bars used @ 6m std 17.97 pcs 226.00 4,061.22 45.20 812.24 4,873.46
No. 16 tie wire used 3.59 kgs 90.00 323.46 18.00 64.69 388.15
75mm dia. Wip Hole - PVC Pipe 41.93 pcs 536.00 22,474.48 107.20 4,494.90 26,969.38

Plaster (Two faces of the wall - Tooled Finish)


Cement bags 35.94 bags 211.00 7,583.34 42.20 1,516.67 9,100.01
Fine Sand 1.80 m3 1,250.00 2,246.25 250.00 449.25 2,695.50

Stiffener Block 0.49 m3


Cement bags 17.97 bags 211.00 3,791.67 42.20 758.33 4,550.00
Fine Sand 1.80 m3 1,250.00 2,246.25 250.00 449.25 2,695.50
3/4 " Gravel 1.80 m3 1,300.00 2,336.10 260.00 467.22 2,803.32
1-12mm dia. Continous Hor. Bars 53.91 pcs 226.00 12,183.66 45.20 2,436.73 14,620.39
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe 5.39 pcs 158.00 851.78 31.60 170.36 1,022.13
4" Cyclone Wire 53.19 m2 390.00 20,744.57 78.00 4,148.91 24,893.48
2" dia. G.I. Pipe Sch. 20 30.55 pcs 3,100.00 94,701.90 620.00 18,940.38 113,642.28
4.00 M High Retaining Wall - Sub-Total 1,190,079.90 238,015.98 1,428,095.88

Page 26 BOQ - Fence


MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
7 5.00 M HIGH RETAINING WALL 20.36 m 6.79 Bays
Retaining Wall
12mm dia. Deformed Bars 440.51 pcs 226.00 99,554.82 45.20 19,910.96 119,465.78
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 29.28 m3 3,875.00 113,467.27 775.00 22,693.45 136,160.72

Counterport
12mm dia. Deformed Bars 181.04 pcs 226.00 40,915.95 45.20 8,183.19 49,099.14
2-16mm dia. Main Bars (Diagonal) 17.74 pcs 395.00 7,009.09 79.00 1,401.82 8,410.91
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 15.74 m3 3,875.00 60,976.32 775.00 12,195.26 73,171.59

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 32.08 m3 3,875.00 124,320.66 775.00 24,864.13 149,184.79
12mm dia. Deformed Bars 127.99 pcs 226.00 28,926.08 45.20 5,785.22 34,711.29
16mm dia. Deformed Bars 126.14 pcs 395.00 49,824.24 79.00 9,964.85 59,789.08

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 5.35 m3 1,300.00 6,951.26 260.00 1,390.25 8,341.52

CHB Wall
6" CHB (Tooled Finsh) 16.50 m2
6" CHB 217.28 pcs 20.00 4,345.60 4.00 869.12 5,214.72
Mortar @ 6" CHB (40kg Cement) 20.37 bags 211.00 4,298.07 42.20 859.61 5,157.68
Screened Sand 2.04 m3 1,200.00 2,444.40 240.00 488.88 2,933.28
12mm dia. Vert Bars @ 6m std 13.58 pcs 226.00 3,069.08 45.20 613.82 3,682.90
12mm dia. Hor Bars @ 6m std 6.79 pcs 226.00 1,534.54 45.20 306.91 1,841.45
No. 16 tie wire 1.36 kgs 90.00 122.22 18.00 24.44 146.66
75mm dia. Wip Hole - PVC Pipe 15.84 pcs 536.00 8,492.03 107.20 1,698.41 10,190.43

Plaster (Two faces of the wall - Tooled Finish)


Cement bags 13.58 bags 211.00 2,865.38 42.20 573.08 3,438.46
Fine Sand 0.68 m3 1,250.00 848.75 250.00 169.75 1,018.50

Stiffener Block 0.18 m3


No. of Cement bags 6.79 bags 211.00 1,432.69 42.20 286.54 1,719.23
Vol. of Fine Sand 0.68 m3 1,250.00 848.75 250.00 169.75 1,018.50
Vol. of 3/4 " Gravel 0.68 m3 1,300.00 882.70 260.00 176.54 1,059.24
1-12mm dia. Continous Hor. Bars 20.37 pcs 226.00 4,603.62 45.20 920.72 5,524.34
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe 2.04 pcs 158.00 321.85 31.60 64.37 386.22
4" Cyclone Wire 20.10 m2 390.00 7,838.38 78.00 1,567.68 9,406.05
2" dia. G.I. Pipe Sch. 20 11.54 pcs 3,100.00 35,783.30 620.00 7,156.66 42,939.96
5.00 M High Retaining Wall - Sub-Total 611,677.03 122,335.41 734,012.44
Page 27 BOQ - Fence
MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
8 6.50 M HIGH RETAINING WALL 59.99 m 20.00 Bays
Retaining Wall
12mm dia. Deformed Bars 1,670.36 pcs 226.00 377,500.36 45.20 75,500.07 453,000.43
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 129.60 m3 3,875.00 502,200.00 775.00 100,440.00 602,640.00

Counterport
12mm dia. Deformed Bars 852.47 pcs 226.00 192,657.47 45.20 38,531.49 231,188.96
5-20mm dia. Main Bars (Diagonal) 154.17 pcs 1,050.00 161,875.00 210.00 32,375.00 194,250.00
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 3.45 m3 3,875.00 13,357.13 775.00 2,671.43 16,028.55

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 135.00 m3 3,875.00 523,125.00 775.00 104,625.00 627,750.00
20mm dia. Deformed Bars 100.00 pcs 1,050.00 105,000.00 210.00 21,000.00 126,000.00
16mm dia. Deformed Bars 365.22 pcs 396.00 144,626.09 79.20 28,925.22 173,551.30

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 20.25 m3 1,300.00 26,325.00 260.00 5,265.00 31,590.00

CHB Wall
6" CHB (Tooled Finish) 48.60 m2
6" CHB 640.00 pcs 20.00 12,800.00 4.00 2,560.00 15,360.00
Mortar @ 6" CHB (40kg Cement) 60.00 bags 211.00 12,660.00 42.20 2,532.00 15,192.00
Screened Sand 6.00 m3 1,200.00 7,200.00 240.00 1,440.00 8,640.00
12mm dia. Vert Bars @ 6m std 40.00 pcs 226.00 9,040.00 45.20 1,808.00 10,848.00
12mm dia. Hor Bars @ 6m std 20.00 pcs 226.00 4,520.00 45.20 904.00 5,424.00
No. 16 tie wire 4.00 kgs 90.00 360.00 18.00 72.00 432.00
75mm dia. Wip Hole - PVC Pipe 46.67 pcs 536.00 25,013.33 107.20 5,002.67 30,016.00

Plaster (Two faces of the wall - Tooled Finish)


Cement bags 40.00 bags 211.00 8,440.00 42.20 1,688.00 10,128.00
Fine Sand 2.00 m3 1,250.00 2,500.00 250.00 500.00 3,000.00

Stiffener Block 0.54 m3


Cement bags 20.00 bags 211.00 4,220.00 42.20 844.00 5,064.00
Fine Sand 2.00 m3 1,250.00 2,500.00 250.00 500.00 3,000.00
3/4 " Gravel 2.00 m3 1,300.00 2,600.00 260.00 520.00 3,120.00
1-12mm dia. Continous Hor. Bars 60.00 pcs 226.00 13,560.00 45.20 2,712.00 16,272.00
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe 6.00 pc 158.00 948.00 31.60 189.60 1,137.60
4" Cyclone Wire 59.20 m2 390.00 23,088.00 78.00 4,617.60 27,705.60
2" dia. G.I. Pipe Sch. 20 34.00 pcs 3,100.00 105,400.00 620.00 21,080.00 126,480.00
6.50 M High Retaining Wall - Sub-Total 2,281,515.37 456,303.07 2,737,818.44
Page 28 BOQ - Fence
MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
9 7.00 M HIGH RETAINING WALL 68.64 m 22.88 Bays
Retaining Wall
12mm dia. Deformed Bars 2,039.58 pcs 226.00 460,946.03 45.20 92,189.21 553,135.24
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 158.56 m3 3,875.00 614,413.80 775.00 122,882.76 737,296.56

Counterport
12mm dia. Deformed Bars 1,020.37 pcs 226.00 230,604.01 45.20 46,120.80 276,724.81
5-20mm dia. Main Bars (Diagonal) 185.14 pcs 1,050.00 194,394.20 210.00 38,878.84 233,273.04
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 84.56 m3 3,875.00 327,687.36 775.00 65,537.47 393,224.83

Footing
Ready Mix Concrete, 3000psi w/ 3/4" Crash Gravel 154.44 m3 3,875.00 598,455.00 775.00 119,691.00 718,146.00
20mm dia. Deformed Bars 120.76 pcs 1,050.00 126,793.33 210.00 25,358.67 152,152.00
16mm dia. Deformed Bars 1,114.55 pcs 395.00 440,248.11 79.00 88,049.62 528,297.73

Gravel Bedding
75mm thk. Gravel Bedding on Compacted Subgrade 23.17 m3 1,300.00 30,115.80 260.00 6,023.16 36,138.96

CHB Wall
6" CHB (Tooled Finsh) 55.60 m2 - - - -
6" CHB 732.16 pcs 20.00 14,643.20 4.00 2,928.64 17,571.84
Mortar @ 6" CHB (40kg Cement) 68.64 bags 211.00 14,483.04 42.20 2,896.61 17,379.65
Screened Sand 6.86 m3 1,200.00 8,236.80 240.00 1,647.36 9,884.16
12mm dia. Vert Bars @ 6m std 45.76 pcs 226.00 10,341.76 45.20 2,068.35 12,410.11
12mm dia. Hor Bars @ 6m std 22.88 pc 226.00 5,170.88 45.20 1,034.18 6,205.06
No. 16 tie wire 4.58 kgs 90.00 411.84 18.00 82.37 494.21
75mm dia. Wip Hole - PVC Pipe 53.39 pcs 536.00 28,615.25 107.20 5,723.05 34,338.30

Plaster (Two faces of the wall - Tooled Finish)


Cement bags 45.76 bags 211.00 9,655.36 42.20 1,931.07 11,586.43
Fine Sand 2.29 m3 1,250.00 2,860.00 250.00 572.00 3,432.00

Stiffener Block 0.62 m3


Cement bags 22.88 bags 211.00 4,827.68 42.20 965.54 5,793.22
Fine Sand 2.29 m3 1,250.00 2,860.00 250.00 572.00 3,432.00
3/4 " Gravel 2.29 m3 1,300.00 2,974.40 260.00 594.88 3,569.28
1-12mm dia. Continous Hor. Bars 68.64 pcs 226.00 15,512.64 45.20 3,102.53 18,615.17
2-10mm dia. 150mm Long Anchor Bars Welded on G.I. Pipe 6.86 pcs 158.00 1,084.51 31.60 216.90 1,301.41
4" Cyclone Wire 67.72 m2 390.00 26,412.67 78.00 5,282.53 31,695.21
2" dia. G.I. Pipe Sch. 20 38.90 pcs 3,100.00 120,577.60 620.00 24,115.52 144,693.12
7.00 M High Retaining Wall - Sub-Total 3,292,325.28 658,465.06 3,950,790.34
Page 29 BOQ - Fence
MATERIAL LABOR
ITEM SCOPE OF WORKS QTY UNIT AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
Total Project Cost (Bare Cost) 10,379,702.85 2,675,940.57 14,555,643.42

U-Shape Sheet Piles Grade