You are on page 1of 1

2" G.I. PIPE (SCHED. 20) SPACED @1.5M C/C.

1 - 12mmØ CONTINUOUS HOR. BAR


2 - 10Ø 150mm LONG ANCHOR BARS WELDED
TO 2" GI PIPE (SCHED. 20)
NOTE: PROVIDE 1-10mmØ DOWEL FOR EACH
VERT. PIPE

STIFFENER BLOCK(SB)

0.10

N.G.L. N.G.L.

0.60 0.60

0.20 0.20

50mm GRAVEL BED(G1) ON COMPACTED SOIL @


ATLEAST 95% DENSITY @ O.M.C.
0.80 0.80

0.80 0.80
0.20 0.30

0.30

0.30 0.80 0.80

COLUMN REINFORCEMENT COLUMN REINFORCEMENT

4-12Ø MAIN VERT. BARS 4-16Ø MAIN VERT. BARS


W/ 10Ø TIES 1@50, 5@150, & REST@200mm O.C. to FREE END. W/ 10Ø TIES 1@50, 5@150, & REST@200mm O.C. to FREE END.

FOOTING REINFORCEMENT FOOTING REINFORCEMENT

5 - 12Ø DEFORMED BARS BOTHWAYS 5 - 12Ø DEFORMED BARS BOTHWAYS

*TYPICAL TO ALL CORNER COLUMNS

C1/F1 C2/F1

1 CHB PERIMETER WALL COLUMN - FOOTING DETAILS SCALE: 1: 1000 Mts.


Designer / Drawn By / Date: SHEET No.:
PROJECT TITLE: DEVELOPER: SHEET CONTENT: REVISIONS: REVISED BY DATE
THIS DRAWING AND OTHER DOCUMENTS Engineer:
A RE INTE LLE CTUAL P ROPE RTY OF 1
AS SHOWN
S-3
METROSTAR REALTY AND DEVELOPMENT ENGR. JB HUMIWAT
INC. IT IS UNLAWFUL TO DUPLICATE OR 2
TO MAKE COPIES OF SAID DOCUMENTS
WITHOU T TH E WRITTEN CO NSENT OF
METROSTAR 3
Approve By / Date:
Design Head:

THEIR ARCHITECT. ALL DRAWINGS AND


REALTY & DEVELOPMENT INC. 4
D OCU ME NTS A RE TO BE KE PT FOR
REFERENCE. (R.A. 9266) 5
Recieve By / Date: 3 3
BAYANI ROAD, BRGY. TUNGKONG MANGGA, CITY OF SAN JOSE 839 EDSA SOUTH TRIANGLE, QUEZON CITY.
LOCATION: ADDRESS: PROJECT NO.: Date: Apr. 09, 2021
DEL MONTE, BULACAN