TESTING AND COM

INSPECTION ITEM ( DISCREPTION )

ELECTRICAL SYSTEM TESTING AND COMMISSIONING


LIGHTING SYSTEM
Inspection of Testing and Commisioning for Electrical Works at ADMI Building A Area
Inspection of Testing and Commisioning for Electrical Works at ADMI Building B Area
Inspection of Testing and Commisioning for Electrical Works at ADMI Building CD Area
Inspection of Testing and Commisioning for Electrical Works at ADMI Building EF Area
Inspection of Testing and Commisioning for Electrical Works at Fire Engine Garage Building
Inspection of Testing and Commisioning for Electrical Works at O&M Building
Inspection of Testing and Commisioning for Street Lights at Reclamation Area
Check the function and lux level of high mast pole lighting system (HMP)
HMP Car Terminal 4.1
HMP Car Terminal 4.2
HMP Utility Area (TCT) 2.2
HMP Utility Area (TCT) 2.3
HMP Utility Area (TCT) 3.1
HMP Utility Area (TCT) 3.2
HMP Truck Waiting Area (TWA) 1.1
HMP Truck Waiting Area (TWA) 1.2
HMP Truck Waiting Area (TWA) 2.1
HMP Container Terminal Area (CTA) 5.1
HMP Container Terminal Area (CTA) 5.2
HMP Container Terminal Area (CTA) 5.3
HMP Container Terminal Area (CTA) 5.4
BUILDING TESTING AND COMMISSIONING
Electronic Testing - Fire Alarm
Inspection of Testing and Commisioning for Electronic (Fire Alarm System) at ADMI Building A
Inspection of Testing and Commisioning for Electronic (Fire Alarm System) at ADMI Building B
Inspection of Testing and Commisioning for Electronic (Fire Alarm System) at ADMI Building CD
Inspection of Testing and Commisioning for Electronic (Fire Alarm System) at ADMI Building EF
Inspection of Testing and Commisioning for Electronic (Fire Alarm System) at OM & Fire Engine Garage Building
Electronic Testing - Emergency Broadcast System
Inspection of Testing and Commisioning for Electronic (Broadcast System) at ADMI Building A
Inspection of Testing and Commisioning for Electronic (Broadcast System) at ADMI Building B
Inspection of Testing and Commisioning for Electronic (Broadcast System) at ADMI Building CD
Inspection of Testing and Commisioning for Electronic (Broadcast System) at ADMI Building EF
Inspection of Testing and Commisioning for Electronic (Broadcast System) at OM & Fire Engine Garage Building
Electronic Testing - Telephone
Inspection of Testing and Commisioning for Electronic (Telephone System) at ADMI Building A
Inspection of Testing and Commisioning for Electronic (Telephone System) at ADMI Building B
Inspection of Testing and Commisioning for Electronic (Telephone System) at ADMI Building CD
Inspection of Testing and Commisioning for Electronic (Telephone System) at ADMI Building EF
Inspection of Testing & Commisioning for Electronic ( Telephone System) at OM & Fire Engine Garage Building
Electronic Testing - Data
Inspection of Testing and Commisioning for Electronic (Data System) at ADMI Building A
Inspection of Testing and Commisioning for Electronic (Data System) at ADMI Building B
Inspection of Testing and Commisioning for Electronic (Data System) at ADMI Building CD
Inspection of Testing and Commisioning for Electronic (Data System) at ADMI Building EF
Inspection of Testing and Commisioning for Electronic (Data System) at OM & Fire Engine Garage Building
Electronic Testing - MATV
Inspection of Testing and Commisioning for Electronic (MATV System) at ADMI Building A
Inspection of Testing and Commisioning for Electronic (MATV System) at ADMI Building B
Inspection of Testing and Commisioning for Electronic (MATV System) at ADMI Building CD
Inspection of Testing and Commisioning for Electronic (MATV System) at ADMI Building EF
Inspection of Testing and Commisioning for Electronic (MATV System) at OM & Fire Engine Garage Building

EMERGENCY POWER GENERATOR SET TESTING AND COMMISSIONING

20 KV TESTING AND COMMISSIONING AND ATS FUNCTION CHECK


COMMISSIONING REPORTS (ELECTRICAL)

SCHEDULE FOR TESTING & COMMISSIONING


RFI NO RFI STATUS
PLAN ACTUAL

1 - 3 March 2021 22-Feb-21 PTRPW-PTBP1-RFI-ME-1711 approved


30 March - 1 April 2021 29 march - 4 april 2021 PTRPW-PTBP1-RFI-ME-1848 approved
4 - 5 March 2021 17-Mar-21 PTRPW-PTBP1-RFI-ME-1771 approved
5 - 6 March 2021 6-May-21 PTRPW-PTBP1-RFI-ME-2156 approved
8 - 10 March 2021 8-Mar-21 PTRPW-PTBP1-RFI-ME-1738 approved
8 - 10 March 2021 8-Mar-21 PTRPW-PTBP1-RFI-ME-1739 approved
24 - 25 February 2021 12-Apr-21 PTRPW-PTBP1-RFI-ME-1905 approved

29 March - 1 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1915 approved


29 March - 1 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1916 approved
05 - 09 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1917 approved
05 - 09 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1918 approved
05 - 09 April 2021 22-Apr-21 PTRPW-PTBP1-RFI-ME-1978 approved
05 - 09 April 2021 22-Apr-21 PTRPW-PTBP1-RFI-ME-1979 approved
12 - 16 April 2021 27-May-21 PTRPW-PTBP1-RFI-ME-2252 approved
12 - 16 April 2021 27-May-21 PTRPW-PTBP1-RFI-ME-2254 approved
12 - 16 April 2021 27-May-21 PTRPW-PTBP1-RFI-ME-2253 approved
19 - 21 April 2021 27 May 2021 - 05 June 2021 PTRPW-PTBP1-RFI-ME-2255 approved
19 - 21 April 2021 27 May 2021 - 05 June 2021 PTRPW-PTBP1-RFI-ME-2256 approved
19 - 21 April 2021 27 May 2021 - 05 June 2021 PTRPW-PTBP1-RFI-ME-2257 on progress
19 - 21 April 2021 27 May 2021 - 05 June 2021 PTRPW-PTBP1-RFI-ME-2258 approved

9 - 10 March 2021 26-Feb-21 PTRPW-PTBP1-RFI-ME-1737 approved


7 - 8 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1890 approved
12 - 13 March 2021 21-Apr-21 PTRPW-PTBP1-RFI-ME-1976 approved
9 - 12 April 2021 29-Apr-21 PTRPW-PTBP1-RFI-ME-2121 approved
6 - 8 March 2021 10 - 16 March 2021 PTRPW-PTBP1-RFI-ME-1770 approved
9 - 10 March 2021 8-Mar-21 PTRPW-PTBP1-RFI-ME-1734 approved
7 - 8 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1887 approved
22 - 24 March 2021 17-Mar-21 PTRPW-PTBP1-RFI-ME-1778 approved
12 - 13 March 2021 29-Apr-21 PTRPW-PTBP1-RFI-ME-2118 approved
6 - 8 March 2021 10 - 16 March 2021 PTRPW-PTBP1-RFI-ME-1767 approved

16 - 17 March 2021 8-Mar-21 PTRPW-PTBP1-RFI-ME-1735 approved


13 - 14 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1888 approved
18 - 19 April 2021 17-Mar-21 PTRPW-PTBP1-RFI-ME-1779 approved
15 - 16 April 2021 29-Apr-21 PTRPW-PTBP1-RFI-ME-2119 approved
6 - 8 March 2021 10 - 16 March 2021 PTRPW-PTBP1-RFI-ME-1768 approved

6 - 8 March 2021 8-Mar-21 PTRPW-PTBP1-RFI-ME-1733 approved


13 - 14 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1886 approved
18 - 19 April 2021 17-Mar-21 PTRPW-PTBP1-RFI-ME-1777 approved
15 - 16 April 2021 29-Apr-21 PTRPW-PTBP1-RFI-ME-2117 approved
6 - 8 March 2021 10 - 16 March 2021 PTRPW-PTBP1-RFI-ME-1766 approved

6 - 8 March 2021 5-Apr-21 PTRPW-PTBP1-RFI-ME-1871 approved


13 - 14 April 2021 8-Apr-21 PTRPW-PTBP1-RFI-ME-1889 approved
18 - 19 April 2021 5-Apr-21 PTRPW-PTBP1-RFI-ME-1872 approved
15 - 16 April 2021 29-Apr-21 PTRPW-PTBP1-RFI-ME-2120 approved
6 - 8 March 2021 10 - 16 March 2021 PTRPW-PTBP1-RFI-ME-1769 approved

15 - 16 April 2021 approved

19 - 21 April 2021 approved


REPORT TESTING
CONTRACTOR ENGINNER

Not submit yet


Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet

Not submit yet


Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet

Not submit yet


Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet
Not submit yet

Not submit yet


Not submit yet
Not submit yet
Not submit yet
Not submit yet

Not submit yet


Not submit yet
Not submit yet
Not submit yet
Not submit yet

Not submit yet


Not submit yet
Not submit yet
Not submit yet
Not submit yet

Not submit yet

Not submit yet


SITE INSPECTION ITEM FOR ELECTRICAL SYSTEM

NO

A
*

1
*
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
*
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
*
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
SITE INSPECTION ITEM FOR ELECTRICAL SYSTEM

SITE INSPECTION ITEM ( DISCREPTION )

SITE INSPECTION TEST ELECTRICAL SYSTEM


High Voltage Test Electrical SYSTEM
High Voltage Test for 20KV Power Distribution System
Magger and Continuity Test Electrical SYSTEM
Installation, Magger Test & Continuity Test of Receptacle & Lighting Power at Fire Engine Building
Installation, Magger Test & Continuity Test for Receptacle & Lighting Power at O&M Building
installation, Magger Test and Continuity Test for Receptacle & Lighting Power at Temporary ADMI Building A
installation, Magger Test and Continuity Test for Receptacle & Lighting Power at Temporary ADMI Building B
installation, Magger Test and Continuity Test for Receptacle & Lighting Power at Temporary ADMI Building CD
installation, Magger Test and Continuity Test for Receptacle & Lighting Power at Temporary ADMI Building EF
installation, Magger Test and Continuity Test for Receptacle & Lighting Power at Guard House
Installation, Magger Test & Continuity Test for Cable AC Power at O&M Building
Installation, Magger Test & Continuity Test for Cable AC Power at ADMI Building A
Installation, Magger Test & Continuity Test for Cable AC Power at ADMI Building B
Installation, Magger Test & Continuity Test for Cable AC Power at ADMI Building CD
Installation, Magger Test & Continuity Test for Cable AC Power at ADMI Building EF
Installation, Magger Test, Continuity Test for Cable Feeder LV System from MDB-LT1 to Panel HMP-1.1, 1.2, 2.1, 3.1, 3.2 at Rec
Installation, Magger Test, Continuity Test for Cable Feeder LV System from MDB-LT2 to Panel HMP-5.1, 5.2, 5.3 5.4 at Reclama
Installation, Magger Test, Continuity Test for Cable Feeder LV System from MDB-LT3 Panel to HMP-2.2, HMP-2.3, HMP-4.1 and
installation, Magger and Continuity Test for High Mast Pole HMP 1.1 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 1.2 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 2.1 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 2.2 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 2.3 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 3.1 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 3.2 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 4.1 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 4.2 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 5.1 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 5.2 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 5.3 at Reclamation Area
installation, Magger and Continuity Test for High Mast Pole HMP 5.4 at Reclamation Area
Installation , Magger & Continuity Test of Power Cable Feeder from LVSB to S-TO-A (Normal) and S-TO-A (Emergency)
Installation , Magger & Continuity Test of Power Cable Feeder from LVSB to S-TO-B (Normal) and S-TO-B (Emergency)
Installation , Magger & Continuity Test of Power Cable Feeder from LVSB to S-TO-CD (Normal) and S-TO-CD (Emergency)
Installation , Magger & Continuity Test of Power Cable Feeder from LVSB to S-TO-EF (Normal) and S-TO-EF (Emergency)
Installation , Magger & Continuity Test of Power Cable Feeder from S-TO-A (Normal) and S-TO-A (Emergency) to LVDB-A Panel
Installation , Magger & Continuity Test of Power Cable Feeder from S-TO-B (Normal) and S-TO-B (Emergency) to LVDB-B
Installation , Magger & Continuity Test of Power Cable Feeder from S-TO-CD (Normal) and S-TO-CD (Emergency) to LVDB-CD
Installation , Magger & Continuity Test of Power Cable Feeder from S-TO-EF (Normal) and S-TO-EF (Emergency) to LVDB-EF
Installation and Magger Test of Cable N2XSEY 3C x 35 mm from MV-SWGR to Transformer 1250 KVA
Installation and Magger Test of Cable Feeder from Generator Panel to Generator set N2XY 1C x 4 x 500 mm
Installation and Magger Test of Cable Feeder from LVSB to Generator Panel N2XY 1C x 4 x 500 mm
Installation and Magger Test Cable STP 1, STP 2 and STP 3 Panel
Installation, Magger & Continuity Test for Street Light (Pole Light) at Utility Area & TAD Building Area
Installation, Magger Test, Continuity Test for Cable Feeder 3c x 120mm 20kV System (PLN Guard, RMU-CT, RMU-AD, RMU-XR,
Continuity Test Electronic SYSTEM
Installation & Continuity Test Electronic Cable of Fire Alarm System at O&M and Fire Engine Building
Installation & Continuity Test Electronic Cable of Broadcast System at O&M and Fire Engine Building
Installation & Continuity Test Electronic Cable for Telephone System at O&M and Fire Engine Building
Installation & Continuity Test Electronic Cable for Data System at O&M and Fire Engine Building
Installation & Continuity Test Electronic Cable for MATV System at O&M and Fire Engine Building
Installation & Continuity Test Electronic Cable of Fire Alarm System at Temporary ADMI Building A
Installation & Continuity Test Electronic Cable of Broadcast System at Temporary ADMI Building A
Installation & Continuity Test Electronic Cable for Telephone System at Temporary ADMI Building A
Installation & Continuity Test Electronic Cable for Data System at Temporary ADMI Building A
Installation & Continuity Test Electronic Cable for MATV System at Temporary ADMI Building A
Installation & Continuity Test Electronic Cable of Fire Alarm System at Temporary ADMI Building B
Installation & Continuity Test Electronic Cable of Broadcast System at Temporary ADMI Building B
Installation & Continuity Test Electronic Cable for Telephone System at Temporary ADMI Building B
Installation & Continuity Test Electronic Cable for Data System at Temporary ADMI Building B
Installation & Continuity Test Electronic Cable for MATV System at Temporary ADMI Building B
Installation & Continuity Test Electronic Cable of Fire Alarm System at Temporary ADMI Building CD
Installation & Continuity Test Electronic Cable of Broadcast System at Temporary ADMI Building CD
Installation & Continuity Test Electronic Cable for Telephone System at Temporary ADMI Building CD
Installation & Continuity Test Electronic Cable for Data System at Temporary ADMI Building CD
Installation & Continuity Test Electronic Cable for MATV System at Temporary ADMI Building CD
Installation & Continuity Test Electronic Cable of Fire Alarm System at Temporary ADMI Building EF
Installation & Continuity Test Electronic Cable of Broadcast System at Temporary ADMI Building EF
Installation & Continuity Test Electronic Cable for Telephone System at Temporary ADMI Building EF
Installation & Continuity Test Electronic Cable for Data System at Temporary ADMI Building EF
Installation & Continuity Test Electronic Cable for MATV System at Temporary ADMI Building EF
Earth Resistance Test Grounding SYSTEM
Earth Resistance Test at Utility Area
Earth Resistance Test at LPS-001
Earth Resistance Test at LPS-002
Earth Resistance Test at LPS-003
Earth Resistance Test at HMP 1.1
Earth Resistance Test at HMP 1.2
Earth Resistance Test at HMP 2.1
Earth Resistance Test at HMP 2.2
Earth Resistance Test at HMP 2.3
Earth Resistance Test at HMP 3.1
Earth Resistance Test at HMP 3.2
Earth Resistance Test at HMP 4.1
Earth Resistance Test at HMP 4.2
Earth Resistance Test at HMP 5.1
Earth Resistance Test at HMP 5.2
Earth Resistance Test at HMP 5.3
Earth Resistance Test at HMP 5.4
Earth Resistance Test at RMU-AD
Earth Resistance Test at RMU-CT
Earth Resistance Test at RMU-LTG
Earth Resistance Test at RMU-XR