You are on page 1of 71

ARCHITECTS

SALEH MOHAMMAD ALLUHAIDAN


PROJECT NAME

GRAVURE VILLAS - KING FAHD DISTRICT

OWNER

ALMASHRIA AL OULA

LOCATION

RIYADH | SAUDI ARABIA


FIRST | PERSPECTIVES
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT AERIAL PERSPECTIVE MKAN ARCHITECTS


www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT MAN'S EYE PERSPECTIVE 01 - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT MAN'S EYE PERSPECTIVE 02 - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT MAN'S EYE PERSPECTIVE 01 - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT MAN'S EYE PERSPECTIVE 02 - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT INTERIOR PERSPECTIVE 01 LIVING & DINING AREA MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT INTERIOR PERSPECTIVE 02 STAIRS MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT INTERIOR PERSPECTIVE 03 MASTER BEDROOM MKAN ARCHITECTS
www.mkan.sa
PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT INTERIOR PERSPECTIVE 04 MASTER TOILET MKAN ARCHITECTS
www.mkan.sa
SECOND | MASTER SITE DEVELOPMENT PLAN
12 M STREET

151.00
15.50 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 15.50
32.50

32.50
B E E E E E E E E E E E E D

20 M STREET
8 M STREET

SCECO
65.00

65.00
A E E E E E E E E E E E E C
32.50

32.50
15.50 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 15.50
151.00

20 M STREET

PROJECT TITLE CONTENT NORTH

GRAVURE VILLAS - KING FAHD DISTRICT MASTER SITE DEVELOPMENT PLAN MKAN ARCHITECTS
www.mkan.sa
THIRD | FLOOR PLANS
32.50

.20 3.00 .20 5.20 .20 7.80 .20 5.30 .201.20 1.25 3.75 3.30 .20.50

.35 1.20.35.20.50.20
.20 2.00 .20

WATER
METER
.50

.90.00 1.40 .10.40


SHELVES

WATER TANK BELOW


.20.70.20 1.50

OPEN TO ABOVE
BBQ
CORRIDOR D D CORRIDOR
1 .95 2.00 1.65 2.00 1.20 1

TV

.90
WM
HANGING
CHOPPING AREA
FIREPLACE
LIVING
DINING
STONE WALL

2.80
RAMP UP
DINING
2.00

2.00

2.00
D D W GUEST SITTING D

R O A D
2 5 4 2
10.00

10.00
5.20

D
18

LINE OF FLOOR ABOVE

OUTDOOR

.35
.90

.90

.90

CARPORT
SITTING
REF
1.60

JAR
KITCHEN
KS

UP
.20 1.20
.20 1.20
RANGE
D D
6 3

2.80
RAMP UP
.70

D
4
.20 2.00 .20

.20
UP
01 D D
7 8
WASH

COFFEE / ESPRESSO BAR


D 02
LAUNDRY D MAID'S ROOM D D
LS

11

2.00
03

.20.50.20.35
10 TOI. W ELEV. 04 WASH 9
TOI. WASH TOI.
10
A WC
WC WC
8

ELEC'TL.
METER
WM WM SHO
CLO. ABAYA
CLO. TABLE 05 06 07 08 09 10 11 12 13

6.15

.20 3.00 .20 3.25 .15 1.80 .20 1.60 .20 4.60 .201.20.20 1.40 .20 2.30 .201.20.201.20 2.50 5.80 .20.50

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT GROUND FLOOR PLAN - TYPICAL UNIT E MKAN ARCHITECTS
www.mkan.sa
32.50

.20 3.00 .20 2.00 .20 3.00 .20 7.80 .20 2.50 .20 3.20 .60.20 9.00

.20 1.20 1.00.20 1.20.20 1.20.201.00 1.20.20 1.40 .50.30

.40 1.80
SHELVES
2.20

2.20
W OPEN TO BELOW W .051.15 .40
1 1
900MM HIGH
.20

STEEL BALUSTER

MIRROR

CLOSET
CLO.
SHO

SHO
D

CLOSET
W W D
6 7 11
12

TOILET
3.30

CLOSET
WASH

TABLE
D

WC
TOI. 11 WALK-IN CLOSET

5.20
10.00

10.00
W
W 3
D D
BEDROOM 1 BEDROOM 2

WASH
6
WC

10 8
MAKE UP
D
8
.20 2.00 .20 1.70 .20

7.80
08
TV PHOTO PHOTO LOBBY W
2
1.70

MASTER D ELEV. D
BEDROOM 8 HALLWAY 8
LOBBY
BEDROOM 3
DN 21
.40 1.36 .40

.40

PHOTO

PHOTO
01 20
D

TABLE
COFFEE / 8
STUDY TABLE

02 ESPRESSO BAR 19 D

2.60
11
W
03 18
TOI.
ELEV. 04 17

CLOSET
A 5 SHO
WASH
W WC
SKYLIGHT ABOVE 6
05 06 07 08 09 10 11 12 13 14 15 16

.20 3.00 .20.30 1.15 2.00 1.15 .60.20 1.60 .20 6.00 .20 2.50 .20 3.20 .60.20 9.00

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FIRST FLOOR PLAN - TYPICAL UNIT E MKAN ARCHITECTS
www.mkan.sa
32.50

3.20 .20.40.20 4.60 .20.40.20 6.60 .20.40.20 2.50 .20.40.20 2.60 .20.40.20 9.00

.20.40.20 1.80 .20 1.40.20.40.20

.40 1.80
.20.40.20 2.20

2.20

2.20
CANOPY
4.10

5.20
10.00

10.00
MAIN SLAB ROOF
6.20

7.80
1.00

4.20
.40
2.70

2.60
ELEV.
.20.40.20

.20.40.20
A ROOF SKYLIGHT

3.20 .20.40.20 4.60 .20 1.60 .201.20.20 3.20 .20 7.30 .20.40.20 9.00

32.50
B

PROJECT TITLE ROOFROOF


FLOOR PLANPLAN
FLOOR (OPTION 1)
CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT TOP OF ROOF PLAN - TYPICAL UNIT E MKAN ARCHITECTS
www.mkan.sa
35.05

.20 4.70 .20 6.05 .20.50.20 1.95 10.85 7.00 .20 2.80 .20

2.35 2.35
RAMP UP

SIDEWALK
WATER
.20

.20
METER
D D
15 17
WATER TANK BELOW

SI
D
2.50

EW

2.80
AL
SCECO

PUMP ROOM BELOW

K
1.50 10.25
.20 2.60 .20

2.80
CARPORT
SWIMMING POOL
.20

10.25M x 2.80M x 1.20M

.20
2.60

.20 2.45 .20 2.50 .20 2.45 .20 OUTDOOR SITTINGHANGING


UP UP UP FIREPLACE
D
13 CANOPY LINE ABOVE

5.30
1.40 .50.30

.90.20 1.40 .10.40


SHELVES SHELVES
2.20

CORRIDOR OPEN TO ABOVE CORRIDOR


D D GREEN
15.50

15.50
STONE WALL

1 .95 2.00 1.65 2.00 1.20 1


.20

.20.70.20

TV

.90
WM

2.20 .20
HANGING
CHOPPING AREA

FIREPLACE
LIVING
DINING

DINING
2.00

2.00

2.00
D D W GUEST SITTING D
2 5 4 2
5.20

UP
LINE OF FLOOR ABOVE

OUTDOOR
.90

.90

.90

.20 2.00 .20.50.20.301.20


SITTING
REF
1.60

JAR D

UP
KITCHEN 16
KS
BBQ

.20 1.20

.20 1.20
RANGE
D D
6 3

ELECT'L
.70

METER
D
4
.20 2.00 .20

.20
UP
01 D D
7 8
WASH

SIDEWALK
COFFEE / ESPRESSO BAR TABLE CLOSET
D 02 SHO
MAID'S ROOM
LS

LAUNDRY D 11 D D W

2.00
03
10 TOI. W ELEV. 04 WASH 9 TOI. WASH 10 TOI. 9
TOI.
WC
C WC
8 WC WC D

WASH
D
WM WM CLO.
CLO. TABLE
SHO
ABAYA 11A DRIVER'S ROOM 14
05 06 07 08 09 10 11 12 13

.20 3.00 .20 3.25 .15 1.80 .20 1.60 .20 4.60 .201.20.20 1.40 .20 2.30 .201.20.20 4.00 .20 1.80 .20 3.80 .20

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT GROUND FLOOR PLAN - UNIT A & B MKAN ARCHITECTS
www.mkan.sa
35.05

.20 4.70 .20 6.05 .90 7.30 5.50 7.00 .20 3.00

2.35 2.35
.20

.20
2.50

ANNEX ROOF

5.30
.20

.20 2.00 .20 3.00 1.85 4.50 1.85 2.50 3.00 CANOPY
2.60

2.00

CANOPY
4.80

.20 1.20 1.00.20 1.20.20 1.20.201.00 1.20.20 1.90 .30


.20 1.40 .80

.40 1.80
SHELVES SHELVES

2.20
2.20

.20 3.20 .60.20.40


CANOPY
W OPEN TO BELOW W CANOPY
1 1
15.50

15.50
LOUVERS LOUVERS
(100MM X 50MM STEEL TUBE) (100MM X 50MM STEEL TUBE)

MIRROR 900MM HIGH STEEL BALUSTER

CLOSET
CLO.
SHO

SHO
D

CLOSET
W W D
6 7 11
12

TOILET
3.30

CLOSET
WASH

TABLE
D

WC
TOI. 11 WALK-IN CLOSET

5.20
W
5.40

5.40
W 3
D D
BEDROOM 1 BEDROOM 2
WASH
6
WC

10 8
MAKE UP
D
8
1.70 .20

D
7.80

08
TV PHOTO PHOTO LOBBY W
2
1.70

MASTER D ELEV. D
BEDROOM 8 HALLWAY 8
LOBBY
BEDROOM 3
.20 2.00 .20

.20 2.00 .20


DN 21
.40 1.36 .40

PHOTO

PHOTO
01 20
D

TABLE
COFFEE / 8
STUDY TABLE

02 ESPRESSO BAR 19 D

2.60
11
W
03 18
TOI.
ELEV. 04 17
ANNEX ROOF

CLOSET
C 5 SHO
WASH
W WC
SKYLIGHT ABOVE 6
05 06 07 08 09 10 11 12 13 14 15 16

.20 3.00 .20.30 1.15 2.00 1.15 .60.20 1.60 .20 6.00 .20 2.50 .20 3.20 .60.20 2.80 .20 5.80 .20

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FIRST FLOOR PLAN - UNIT A & B MKAN ARCHITECTS
www.mkan.sa
32.50

3.20 5.40 8.20 6.70 9.00


5.50

5.50
.20.40.20 4.60 .20.40.20 6.60 .20.40.20 2.50 .20.40.20 2.60 .20.40.20
.20.40.201.40.20.40.20

.20.40.20 1.80 .20 1.40.20.40.20

.40 1.80
2.20
15.50

15.50
CANOPY
3.30

5.20

10.00
MAIN SLAB ROOF
7.80

1.00

4.20
.20.40.20 1.90

.40

2.60
ELEV.

.20.40.20
C ROOF SKYLIGHT

.20.40.20 4.60 .20 1.60 .201.20.20 3.20 .20 7.30 .20.40.20

3.20 20.30 9.00

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT TOP OF ROOF PLAN - UNIT A & B MKAN ARCHITECTS
www.mkan.sa
32.50

.20 2.15 .20 6.05 .20.50.20 12.80 7.00 .20 2.80 .20

RAMP UP

D
WATER
14

.20
.20

METER
D
DRIVER'S ROOM 17
CLOSET

WATER TANK BELOW SI


D
EW

2.80
AL
3.10

PUMP ROOM BELOW


1.50 10.25

2.80
CARPORT
SWIMMING POOL
10.25M x 2.80M x 1.20M

.20
2.20 .20 1.80 .20

D
11A
WC

TOI.

PATIO
W WASH
.20 2.45 .20 2.50 .20 2.45 .20 OUTDOOR SITTINGHANGING
SHO

9 UP UP UP FIREPLACE
UP D
13 CANOPY LINE ABOVE

5.30
1.40 .50.30

.90.20 1.40 .10.40


SHELVES SHELVES

2.20
CORRIDOR OPEN TO ABOVE CORRIDOR
D D GREEN
15.50

15.50
1 .95 2.00 1.65 2.00 1.20 1
.20

.20.70.20

1.00
TV

.90
WM

2.15 .20
HANGING
CHOPPING AREA

FIREPLACE
LIVING
STONE WALL

DINING

DINING
2.00

2.00

2.00
D D W GUEST SITTING D
2 5 4 2
5.20

3.70
UP
LINE OF FLOOR ABOVE

OUTDOOR
.90

.20 2.00 .20.50.20.351.20


.90

.90

SITTING
REF
1.60

JAR D

UP
KITCHEN 16
KS
BBQ

.20 1.20

.20 1.20
RANGE
D D
6 3
.70

ELECT'L
METER
D
4
.20 2.00 .20

.20
UP
01 D D
7 8

2.90
WASH

COFFEE / ESPRESSO BAR


D 02
LAUNDRY D MAID'S ROOM D D
LS

11

2.00
03 GREEN
10 TOI. W ELEV. 04 WASH 9 TOI. WASH 10 TOI.
COUNTER

A WC
WC WC
STEEL

8
WM WM SHO
CLO. ABAYA
CLO. TABLE 05 06 07 08 09 10 11 12 13

.20 3.00 .20 3.25 .15 1.80 .20 1.60 .20 4.60 .201.20.20 1.40 .20 2.30 .201.20.20 4.00 5.50 .50.20

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT GROUND FLOOR PLAN - UNIT C & D MKAN ARCHITECTS
www.mkan.sa
32.50
.20 .20 2.15 .20 6.05 8.20 5.50 7.00 .20 3.00

ANNEX ROOF
5.10

5.50
.20 2.00 .20 3.00 1.85 4.50 1.85 2.50 3.00 CANOPY

CANOPY
2.20 .20

.20 1.20 1.00.20 1.20.20 1.20.201.00 1.20.20 1.90 .30

.40 1.80
SHELVES SHELVES

2.20
.20 3.20 .60.20.40
CANOPY
W OPEN TO BELOW W CANOPY
1 1
15.50

15.50
LOUVERS LOUVERS
.20

(100MM X 50MM STEEL TUBE) (100MM X 50MM STEEL TUBE)

MIRROR 900MM HIGH STEEL BALUSTER

CLOSET
CLO.
SHO

SHO
D

CLOSET
W W D
6 7 11
12

TOILET
3.30

CLOSET
WASH

TABLE
D

WC
TOI. 11 WALK-IN CLOSET

5.20
W
W 3
D D
BEDROOM 1 BEDROOM 2
WASH
6
WC

10 8
MAKE UP
D
8
.20

7.80
08
TV PHOTO PHOTO LOBBY W
2
1.70

MASTER D ELEV. D
BEDROOM 8 HALLWAY 8
LOBBY
BEDROOM 3
3.90

DN 21
.40 1.36 .40

PHOTO

PHOTO
01 20
D

TABLE
COFFEE / 8
STUDY TABLE

02 ESPRESSO BAR 19 D

2.60
11
W
03 18
TOI.
ELEV. 04 17

CLOSET
A 5 SHO
WASH
W WC
SKYLIGHT ABOVE 6
05 06 07 08 09 10 11 12 13 14 15 16
.20

.20 3.00 .20.30 1.15 2.00 1.15 .60.20 1.60 .20 6.00 .20 2.50 .20 3.20 .60.20 9.00

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FIRST FLOOR PLAN - UNIT C & D MKAN ARCHITECTS
www.mkan.sa
32.50

3.20 5.40 8.20 6.70 9.00


5.50

5.50
.20.40.20 4.60 .20.40.20 6.60 .20.40.20 2.50 .20.40.20 2.60 .20.40.20
.20.40.201.40.20.40.20

.20.40.20 1.80 .20 1.40.20.40.20

.40 1.80
2.20
15.50

15.50
CANOPY
3.30

5.20

10.00
MAIN SLAB ROOF
7.80

1.00

4.20
.20.40.20 1.90

.40

2.60
ELEV.

.20.40.20
A ROOF SKYLIGHT

.20.40.20 4.60 .20 1.60 .201.20.20 3.20 .20 7.30 .20.40.20

3.20 20.30 9.00

32.50
B

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT TOP OF ROOF PLAN - UNIT C & D MKAN ARCHITECTS
www.mkan.sa
FOURTH | REFLECTED CEILING PLANS
32.50

.20 3.00 .20 5.20 .20 7.80 .20 5.30 .201.00.20 9.00
.20 1.90 .30

.20 1.90 .30


OPEN TO
ABOVE

.20
CABINET
SDL

PL
10.00

10.00
5.20

5.20
PL
A

RDL
A

SDL

RDL

SDL
PL +2.80 AFF +2.80 AFF
D
.30

+2.80 AFF
+2.80 AFF

E
EF

RDL
CABINET
.20.10 1.90 .20

.20 2.00 .20


+2.80 AFF

PL PL D C D C
D

D D
ELEVATOR +2.40 AFF +2.40 AFF +2.80 AFF +2.80 AFF
+2.80 AFF +2.80 AFF EF

FCU EF EF

.20 3.00 .20 3.25 .15 1.80 .20 1.60 .201.20.20 3.20 .201.20.20 1.40 .20 2.30 .201.20.201.00.20 9.00

32.50

CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB
.40 (VARIES)

.40 (VARIES)
.40 (VARIES)

FLEXIBLE AC DUCT

LINEAR DIFFUSER, EXHAUST FAN


FROM AC
FLUSHED AND
W
LO

PAINTED TO MATCH
RF
AI
.07

.07

.07

.02
.20 .12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .10.12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .20 .12 .02 12mm THK GYPSUM
BOARD, PAINTED FINISH, .02 12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
WHITE WHITE WHITE PAINTED FINISH, WHITE PAINTED FINISH, WHITE

LED STRIP LINEAR LED STRIP LINEAR LED STRIP LINEAR DOWNLIGHT 5mm GAP
LIGHT LIGHT LIGHT
CEILING DETAIL - A CEILING DETAIL - B CEILING DETAIL - C CEILING DETAIL - D CEILING DETAIL - E

PROJECT TITLE GROUND FLOOR PLAN (OPTION 1)


CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT GROUND FLOOR REFLECTED CEILING PLAN TYPICAL UNIT E MKAN ARCHITECTS
www.mkan.sa
32.50

3.20 .20 2.00 .20 3.00 .20 7.80 .20 2.50 .20 3.80 .20 9.00
.20 1.90 .30

.20 1.90 .30


SHELVES

.20
.30 A
SDL
+5.00 AFF
.30
RDL
PL

.20
.20
EF EF

CABINET
CABINET
RDL

CABINET
CANOPY
.30
3.30

CABINET
C

3.60
C B
A B
+2.80 AFF +2.80 AFF

.30
+2.80 AFF
.30
10.00

10.00
+2.80 AFF +2.80 AFF

SDL
AC
.20

AC
B

.20
AC +2.80 AFF
.30 B AC

+2.80 AFF B
+2.80 AFF
.30
3.90

3.60
RDL

A B

EF
+2.80 AFF PL PL
C +2.80 AFF
PL
ELEVATOR

CABINET
SKYLIGHT +2.80 AFF
SDL ABOVE

.20
.20

.20
PL PL

3.20 .20 5.20 .20 1.60 .201.20.20 3.20 .201.20.20 2.50 .20 3.80 .20 9.00

32.50

CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB
.40 (VARIES)

.40 (VARIES)
.40 (VARIES)

FLEXIBLE AC DUCT

LINEAR DIFFUSER, EXHAUST FAN


FROM AC
FLUSHED AND
W
LO

PAINTED TO MATCH
RF
AI
.07

.07

.07

.02
.20 .12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .10.12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .20 .12 .02 12mm THK GYPSUM
BOARD, PAINTED FINISH, .02 12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
WHITE WHITE WHITE PAINTED FINISH, WHITE PAINTED FINISH, WHITE

LED STRIP LINEAR LED STRIP LINEAR LED STRIP LINEAR DOWNLIGHT 5mm GAP
LIGHT LIGHT LIGHT
CEILING DETAIL - A CEILING DETAIL - B CEILING DETAIL - C CEILING DETAIL - D CEILING DETAIL - E

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FIRST FLOOR REFLECTED CEILING PLAN TYPICAL UNIT E MKAN ARCHITECTS
www.mkan.sa
35.05

.20 4.70 .20.65.20 2.70 2.50 .20 1.65 .80.20 2.50 .20.80 1.65 .20 2.50 2.80 .201.00.20 9.00
.20
2.90

2.50

+2.40 AFF
.60.20
2.00

2.00
.20 1.90 .30

.20 1.40 .50.30


OPEN TO
ABOVE

.20
CABINET
SDL

12.00
12.00

PL
5.20

5.20
PL
A

RDL
A

SDL

RDL

SDL
PL +2.80 AFF +2.80 AFF
D
.30

+2.80 AFF
+2.80 AFF

E
EF

RDL
CABINET

.20 2.00 .20


.20 2.00 .20

+2.80 AFF

PL PL D C D C
D

D D EF D
ELEVATOR +2.40 AFF +2.40 AFF +2.80 AFF +2.80 AFF
+2.80 AFF +2.80 AFF EF D +2.40 AFF

FCU EF EF
+2.40 AFF
FCU

.20 3.00 .20 3.25 .15 1.80 .20 1.60 .201.20.20 3.20 .201.20.20 1.40 .20 2.30 .201.20.201.00.20 2.80 .20 1.80 .20 3.80 .20

32.50

CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB
.40 (VARIES)

.40 (VARIES)
.40 (VARIES)

FLEXIBLE AC DUCT

LINEAR DIFFUSER, EXHAUST FAN


FROM AC
FLUSHED AND
W
LO

PAINTED TO MATCH
RF
AI
.07

.07

.07

.02
.20 .12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .10.12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .20 .12 .02 12mm THK GYPSUM
BOARD, PAINTED FINISH, .02 12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
WHITE WHITE WHITE PAINTED FINISH, WHITE PAINTED FINISH, WHITE

LED STRIP LINEAR LED STRIP LINEAR LED STRIP LINEAR DOWNLIGHT 5mm GAP
LIGHT LIGHT LIGHT
CEILING DETAIL - A CEILING DETAIL - B CEILING DETAIL - C CEILING DETAIL - D CEILING DETAIL - E

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT GROUND FLOOR REFLECTED CEILING PLAN UNIT A & B MKAN ARCHITECTS
www.mkan.sa
32.50

3.20 .20 2.00 .20 3.00 .20 2.45 .20 2.50 .20 2.45 .20 2.50 .20 3.80 .20 9.00

5.50

5.50
.20 1.90 .30

.20 1.90 .30


SHELVES

.20
.30 A
SDL
+5.00 AFF
.30
15.50

15.50
RDL
PL

.20
.20
EF EF

CABINET
CABINET
RDL

CABINET
CANOPY
.30
3.30

CABINET
C

3.60
C B
A B
+2.80 AFF +2.80 AFF

.30
+2.80 AFF
+2.80 AFF +2.80 AFF .30
SDL
AC
.20

AC
B

.20
AC +2.80 AFF
.30 B AC

+2.80 AFF B
+2.80 AFF
.30
3.90

3.60
RDL

A B

EF
+2.80 AFF PL PL
C +2.80 AFF
PL
ELEVATOR

CABINET
SKYLIGHT +2.80 AFF
SDL ABOVE

.20
.20

.20
PL

3.20 .20 5.20 .20 1.60 .201.20.20 3.20 .201.20.20 2.50 .20 3.80 .20 9.00

32.50

CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB
.40 (VARIES)

.40 (VARIES)
.40 (VARIES)

FLEXIBLE AC DUCT

LINEAR DIFFUSER, EXHAUST FAN


FROM AC
FLUSHED AND
W
LO

PAINTED TO MATCH
RF
AI
.07

.07

.07

.02
.20 .12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .10.12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .20 .12 .02 12mm THK GYPSUM
BOARD, PAINTED FINISH, .02 12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
WHITE WHITE WHITE PAINTED FINISH, WHITE PAINTED FINISH, WHITE

LED STRIP LINEAR LED STRIP LINEAR LED STRIP LINEAR DOWNLIGHT 5mm GAP
LIGHT LIGHT LIGHT
CEILING DETAIL - A CEILING DETAIL - B CEILING DETAIL - C CEILING DETAIL - D CEILING DETAIL - E

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FIRST FLOOR REFLECTED CEILING PLAN UNIT A & B MKAN ARCHITECTS
www.mkan.sa
32.50

.20 2.15 .20.65.20 2.70 2.50 .20 1.65 .80.20 2.50 .20.80 1.65 .20 2.50 2.80 .201.00.20 9.00

.20

FCU
+2.40 AFF
3.10

3.50
D
.20 1.40 .80.20 1.80 .20

2.00
EF

+2.40 AFF

.20 1.40 .50.30


OPEN TO
ABOVE
15.50

15.50
.20
CABINET
SDL

PL
5.20

5.20
PL
A
RDL
A

SDL

RDL

SDL
PL +2.80 AFF +2.80 AFF
D
.30

+2.80 AFF
+2.80 AFF

E
EF

RDL
CABINET
.20 2.00 .20

.20 2.00 .20


+2.80 AFF

PL PL D C D C
D

D D
ELEVATOR +2.40 AFF +2.40 AFF +2.80 AFF +2.80 AFF
+2.80 AFF +2.80 AFF EF

FCU EF EF

.20 3.00 .20 3.25 .15 1.80 .20 1.60 .201.20.20 3.20 .201.20.20 1.40 .20 2.30 .201.20.201.00.20 9.00

32.50

CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB
.40 (VARIES)

.40 (VARIES)
.40 (VARIES)

FLEXIBLE AC DUCT

LINEAR DIFFUSER, EXHAUST FAN


FROM AC
FLUSHED AND
W
LO

PAINTED TO MATCH
RF
AI
.07

.07

.07

.02
.20 .12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .10.12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .20 .12 .02 12mm THK GYPSUM
BOARD, PAINTED FINISH, .02 12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
WHITE WHITE WHITE PAINTED FINISH, WHITE PAINTED FINISH, WHITE

LED STRIP LINEAR LED STRIP LINEAR LED STRIP LINEAR DOWNLIGHT 5mm GAP
LIGHT LIGHT LIGHT
CEILING DETAIL - A CEILING DETAIL - B CEILING DETAIL - C CEILING DETAIL - D CEILING DETAIL - E

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT GROUND FLOOR REFLECTED CEILING PLAN UNIT C & D MKAN ARCHITECTS
www.mkan.sa
32.50

3.20 .20 2.00 .20 3.00 .20 2.45 .20 2.50 .20 2.45 .20 2.50 .20 3.80 .20 9.00

5.50

5.50
.20 1.90 .30

.20 1.90 .30


SHELVES

.20
.30 A
SDL
+5.00 AFF
.30
15.50

15.50
RDL
PL

.20
.20
EF EF

CABINET
CABINET
RDL

CABINET
CANOPY
.30
3.30

CABINET
C

3.60
C B
A B
+2.80 AFF +2.80 AFF

.30
+2.80 AFF
+2.80 AFF +2.80 AFF .30
SDL
AC
.20

AC
B

.20
AC +2.80 AFF
.30 B AC

+2.80 AFF B
+2.80 AFF
.30
3.90

3.60
RDL

A B

EF
+2.80 AFF PL PL
C +2.80 AFF
PL
ELEVATOR

CABINET
SKYLIGHT +2.80 AFF
SDL ABOVE

.20
.20

.20
PL

.40
3.20 .20 5.20 .20 1.60 .201.20.20 3.20 .201.20.20 2.50 .20 3.80 .20 9.00

32.50

CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB CONCRETE SLAB
.40 (VARIES)

.40 (VARIES)
.40 (VARIES)

FLEXIBLE AC DUCT

LINEAR DIFFUSER, EXHAUST FAN


FROM AC
FLUSHED AND
W
LO

PAINTED TO MATCH
RF
AI
.07

.07

.07

.02
.20 .12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .10.12 12mm THK GYPSUM
BOARD, PAINTED FINISH, .20 .12 .02 12mm THK GYPSUM
BOARD, PAINTED FINISH, .02 12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
12mm THK MOISTURE
RESISTANT GYPSUM BOARD,
WHITE WHITE WHITE PAINTED FINISH, WHITE PAINTED FINISH, WHITE

LED STRIP LINEAR LED STRIP LINEAR LED STRIP LINEAR DOWNLIGHT 5mm GAP
LIGHT LIGHT LIGHT
CEILING DETAIL - A CEILING DETAIL - B CEILING DETAIL - C CEILING DETAIL - D CEILING DETAIL - E

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FIRST FLOOR REFLECTED CEILING PLAN UNIT C & D MKAN ARCHITECTS
www.mkan.sa
FIFTH | ELEVATIONS AND SECTIONS
TOPMOST PARAPET LEVEL +8.55

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80 1201

STEEL GATE

STEEL CANOPY

FIRST FLOOR LEVEL +4.00


SLAB SOFFIT LEVEL +3.60 STEEL DOOR

.50
FIN. CEILING LEVEL +3.15
3.15

ELECT'L METER WATER METER


2.45

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FENCE FRONT ELEVATION - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
VILLA NUMBER, PRE-PAINTED STEEL, MATTE FINISH

STEEL PANEL, BLACK SEMI-GLOSS PAINT FINISH

TEMPERED GLASS WINDOW ON POWDER COATED ALUMINUM FRAMING

BLACK TRAVERTINO MARBLE WALL CLADDING

TOPMOST PARAPET LEVEL +8.55

.45 .30.50 .50


TOP OF PARAPET LEVEL +8.05 PARAPET WALL, DARK GRAY PAINT FINISH

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80 1201

2.80
DOUBLE GLAZED TEMPERED GLASS WINDOW
WITH POWDER COATED ALUMINUM FRAMING

FIRST FLOOR LEVEL +4.00 8.55

.45.40
SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15

TEMPERED GLASS DOOR WITH ALUMINUM FRAMING


2.80

DOUBLE GLAZED TEMPERED GLASS WINDOW


WITH POWDER COATED ALUMINUM FRAMING
GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FRONT ELEVATION - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
TEMPERED GLASS DOOR AND WINDOW WITH ALUMINUM FRAMING

STEEL MONKEY LADDER, BLACK PAINT FINISH

PARAPET WALL, DARK GRAY PAINT FINISH

STEEL CANOPY BLACK PAINT FINISH

TEMPERED GLASS WINDOW WITH ALUMINUM FRAMING

WALL, SMOOTH PLASTER, SEMI-GLOSS WHITE PAINT FINISH

PERIMETER FENCE

TOPMOST PARAPET LEVEL +8.55


.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80


2.80
8.55

FIRST FLOOR LEVEL +4.00


.45.40

SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT RIGHT SIDE ELEVATION - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55

.45 .30.50 .50


TOP OF PARAPET LEVEL +8.05 PARAPET WALL, DARK GRAY PAINT FINISH

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25


STEEL MONKEY LADDER, BLACK PAINT FINISH
FIN. CEILING LEVEL +6.80

WALL, SMOOTH PLASTER, SEMI-GLOSS WHITE PAINT FINISH

2.80
DOUBLE GLAZED TEMPERED GLASS WINDOW
WITH POWDER COATED ALUMINUM FRAMING

FIRST FLOOR LEVEL +4.00 8.55

.45.40
SLAB SOFFIT LEVEL +3.60

CHB FIREWALL
FIN. CEILING LEVEL +3.15

TEMPERED GLASS DOOR WITH ALUMINUM FRAMING


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT REAR ELEVATION - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
PARAPET WALL, DARK GRAY PAINT FINISH

WALL, SMOOTH PLASTER, SEMI-GLOSS WHITE PAINT FINISH

PERIMETER FENCE

TOPMOST PARAPET LEVEL +8.55


.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80


2.80
8.55

FIRST FLOOR LEVEL +4.00


.45.40

SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT LEFT SIDE ELEVATION - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55
.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55 SKYLIGHT

SLAB SOFFIT LEVEL +7.25 CEILING VOID CEILING VOID CEILING VOID

FIN. CEILING LEVEL +6.80


2.80

SHAFT
MASTER BEDROOM TOILET BEDROOM
8.55

FIRST FLOOR LEVEL +4.00


STAIR 21
.45.40

SLAB SOFFIT LEVEL +3.60

ELEVATOR
WELL 17
CEILING VOID CEILING VOID VOID 16 CEILING VOID VOID VOID
15 VOID
FIN. CEILING LEVEL +3.15 14 VOID
13
12
11
10
09
2.80

08
07
06
LAUNDRY MAID'S ROOM TOILET 04
05
WASH TOI. WASH TOI. OUTDOOR SITTING CARPORT
GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

1.35
ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SECTION THRU A - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55

.45 .30.50 .50

.50 .50
TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25 CEILING VOID CEILING VOID

2.20
FIN. CEILING LEVEL +6.80
CEILING VOID

2.80

S T A I R W E L L
TOILET
8.55

8.55
FIRST FLOOR LEVEL +4.00 21

.45.40
SLAB SOFFIT LEVEL +3.60

CEILING VOID

5.00
FIN. CEILING LEVEL +3.15
2.80

LIVING
GROUND FLOOR LEVEL + 0.35 03
02
01
SIDEWALK LEVEL + 0.20
.20.15

.35
ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SECTION THRU B - INNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80 1201

STEEL GATE

STEEL CANOPY

FIRST FLOOR LEVEL +4.00


SLAB SOFFIT LEVEL +3.60
CHB FENCE

FIN. CEILING LEVEL +3.15


3.15

ELECT'L METER
2.45

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FENCE FRONT ELEVATION - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
CHB FENCE

WATER METER

STEEL CANOPY

STEEL GATE

TOPMOST PARAPET LEVEL +8.55

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80

FIRST FLOOR LEVEL +4.00


SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15


3.15

2.45

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FENCE RIGHT SIDE ELEVATION - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
VILLA NUMBER, PRE-PAINTED STEEL, MATTE FINISH

STEEL PANEL, BLACK SEMI-GLOSS PAINT FINISH

TEMPERED GLASS WINDOW ON POWDER COATED ALUMINUM FRAMING

BLACK TRAVERTINO MARBLE WALL CLADDING

TOPMOST PARAPET LEVEL +8.55

.45 .30.50 .50


TOP OF PARAPET LEVEL +8.05 PARAPET WALL, DARK GRAY PAINT FINISH

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80 1201

2.80
DOUBLE GLAZED TEMPERED GLASS WINDOW
WITH POWDER COATED ALUMINUM FRAMING
8.55

FIRST FLOOR LEVEL +4.00


.45.40

SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

DOUBLE GLAZED TEMPERED GLASS WINDOW


WITH POWDER COATED ALUMINUM FRAMING

TEMPERED GLASS DOOR WITH ALUMINUM FRAMING

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT FRONT ELEVATION - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
TEMPERED GLASS DOOR AND WINDOW WITH ALUMINUM FRAMING

STEEL MONKEY LADDER, BLACK PAINT FINISH

PARAPET WALL, DARK GRAY PAINT FINISH

STEEL CANOPY BLACK PAINT FINISH

TEMPERED GLASS WINDOW WITH ALUMINUM FRAMING

WALL, SMOOTH PLASTER, SEMI-GLOSS WHITE PAINT FINISH

PERIMETER FENCE

TOPMOST PARAPET LEVEL +8.55


.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80


2.80
8.55

FIRST FLOOR LEVEL +4.00


.45.40

SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT RIGHT SIDE ELEVATION - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55

.45 .30.50 .50


TOP OF PARAPET LEVEL +8.05 PARAPET WALL, DARK GRAY PAINT FINISH

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25


STEEL MONKEY LADDER, BLACK PAINT FINISH
FIN. CEILING LEVEL +6.80

WALL, SMOOTH PLASTER, SEMI-GLOSS WHITE PAINT FINISH

2.80
DOUBLE GLAZED TEMPERED GLASS WINDOW
WITH POWDER COATED ALUMINUM FRAMING

FIRST FLOOR LEVEL +4.00


8.55

.45.40
SLAB SOFFIT LEVEL +3.60

CHB FIREWALL
FIN. CEILING LEVEL +3.15

TEMPERED GLASS DOOR WITH ALUMINUM FRAMING


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT REAR ELEVATION - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
PARAPET WALL, DARK GRAY PAINT FINISH

WALL, SMOOTH PLASTER, SEMI-GLOSS WHITE PAINT FINISH

PERIMETER FENCE

TOPMOST PARAPET LEVEL +8.55


.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25

FIN. CEILING LEVEL +6.80


2.80
8.55

FIRST FLOOR LEVEL +4.00


.45.40

SLAB SOFFIT LEVEL +3.60

FIN. CEILING LEVEL +3.15


2.80

GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT LEFT SIDE ELEVATION - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55
.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55 SKYLIGHT

SLAB SOFFIT LEVEL +7.25 CEILING VOID CEILING VOID CEILING VOID

FIN. CEILING LEVEL +6.80


2.80

SHAFT
MASTER BEDROOM TOILET BEDROOM
8.55

FIRST FLOOR LEVEL +4.00


STAIR 21
.45.40

SLAB SOFFIT LEVEL +3.60

ELEVATOR
WELL 17
CEILING VOID CEILING VOID VOID 16 CEILING VOID VOID VOID
15 VOID
FIN. CEILING LEVEL +3.15 14 VOID
13
12
11
10
09
2.80

08
07
06
LAUNDRY MAID'S ROOM TOILET 04
05
WASH TOI. WASH TOI. OUTDOOR SITTING
GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

1.35
ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SECTION THRU A - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55

.45 .30.50 .50


TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55

SLAB SOFFIT LEVEL +7.25 CEILING VOID CEILING VOID

FIN. CEILING LEVEL +6.80


CEILING VOID

2.80

S T A I R W E L L
TOILET
FIRST FLOOR LEVEL +4.00 8.55 21

.45.40
SLAB SOFFIT LEVEL +3.60

CEILING VOID

FIN. CEILING LEVEL +3.15


2.80

GROUND FLOOR LEVEL + 0.35 03


02
01
SIDEWALK LEVEL + 0.20
.20.15

ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SECTION THRU B - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
TOPMOST PARAPET LEVEL +8.55
.45 .30.50 .50

TOP OF PARAPET LEVEL +8.05

TOP OF SLAB ROOF LEVEL +7.55 SKYLIGHT

SLAB SOFFIT LEVEL +7.25 CEILING VOID CEILING VOID CEILING VOID

FIN. CEILING LEVEL +6.80


2.80

SHAFT
MASTER BEDROOM TOILET BEDROOM
8.55

FIRST FLOOR LEVEL +4.00


STAIR 21
.45.40

SLAB SOFFIT LEVEL +3.60

ELEVATOR
WELL 17
CEILING VOID CEILING VOID VOID 16 CEILING VOID VOID VOID
15 VOID
FIN. CEILING LEVEL +3.15 14 VOID
13
12
11
10
09
2.80

08
07
06
LAUNDRY MAID'S ROOM TOILET 04
05
WASH TOI. WASH TOI. OUTDOOR SITTING TOI. DRIVER'S ROOM
GROUND FLOOR LEVEL + 0.35

SIDEWALK LEVEL + 0.20


.20.15

1.35
ROAD LEVEL + 0.00

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SECTION THRU C - CORNER UNIT MKAN ARCHITECTS
www.mkan.sa
SIXTH | STAIR AND ELEVATOR DETAILS
REINFORCED CONC. SHEAR WALL

CEMENT PLASTER, PAINT FINISH


.02
20MM GROOVE

10MM THK. STEEL RAILING


(VERIFY COLOR)

20X20mm POWDER COATED

STAIR
RUN
ALUM. TUBE LOUVERS
01
ALUMINUM SHEET WITH
20mmX40mm PRE-PAINTED
STEEL TUBE FRAME AS
.06 SUBSTRATE (VERIFY
THICKNESS)

2 BLOWN-UP DETAIL A
SCALE 1:20 M
SEE ISOMETRIC
80MM X 40MM POWDER COATED ALUMINUM
TUBE LOUVERS SPACED @ 40MM

6.40

SEE DETAIL A
.20 1.20 .20 3.20 .20 1.20 .20
80MM x 40MM POWDER COATED
ALUMINUM TUBE LOUVERS
.06 SPACED @ 40MM
.80 .10 .10

UP

.20
01

.80
02
03
2.40

2.40
04
MASONRY WALL
1.20

1.20
A
05 06 07 08 09 10 11 12 13
.20

.20
CEMENT PLASTER,
PAINT FINISH

.20 1.20 3.40 .20 1.20 .20

6.40

PORCELAIN TILE
FLOOR FINISH

2mm CHAMFERED NOSING

1 STAIR PLAN @ GROUND FLOOR 5x5mm GROOVE


SCALE 1:50 M

REINFORCED CONCRETE

CEMENT PLASTER FINISH


PAINTED FINISH

3 ISOMETRIC VIEW
SCALE NTS M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT STAIR DETAIL 01 MKAN ARCHITECTS


www.mkan.sa
40MM x 20MM PRE-PAINTED
STEEL TUBE SUBSTRATE

MASONRY WALL
ALUMINUM SHEET BACKING
(VERIFY THICKNESS)
CEMENT PLASTER,
REFERENCE FOR LIGHTING ONLY REFERENCE FOR LIGHTING ONLY PAINT FINISH

20MM x 20MM POWDER COATED


ALUMINUM TUBE LOUVERS

2 LIGHTING REFERENCE
SCALE NTS M

1.00M HIGH, 10MM THK. STEEL


SHEET RAILING (VERIFY COLOR)

80MM X 40MM POWDER COATED ALUMINUM


TUBE LOUVERS SPACED @ 40MM
20MM LED LINEAR LIGHTING
6.40
WITH ACRYLIC COVER

.20 1.20 .20 3.20 .20 1.20 .20

PORCELAIN TILE
.06 .06 FLOOR FINISH
10MM X 10MM LED MICRO
NEON FLEX STRIP LIGHT
.10 .10

DN 21

.10
REINFORCED CONCRETE
01 20

.90
02 19
03 18 CEMENT PLASTER FINISH
PAINTED FINISH
2.40

2.00

2.40
04 17
2mm CHAMFERED NOSING

1.20
A
05 06 07 08 09 10 11 12 13 14 15 16
5x5mm GROOVE
.20

.20
.20 1.20 3.60 1.20 .20

6.40
3 ISOMETRIC VIEW
SCALE NTS M

SEE ISOMETRIC

1 STAIR PLAN @ FIRST FLOOR


SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT STAIR DETAIL 02 MKAN ARCHITECTS


www.mkan.sa
MASONRY WALL
1.00M HIGH, 18MM THK. STEEL
RAILING (VERIFY COLOR)
CEMENT PLASTER FINISH
PAINTED FINISH
20X20mm ALUM. TUBE LOUVERS
WITH BACK SIDE ALUMINUM
SHEET SUBSTRATE
20MM LED LINEAR LIGHTING
WITH ACRYLIC COVER
PORCELAIN FLOOR TILE FINISH

REINFORCED CONCRETE

CEMENT PLASTER FINISH


PAINTED FINISH
LANDING +4.00

LANDING +3.30

FIRST FLOOR LEVEL +4.00 21


2 BLOWN-UP DETAIL 1
SCALE 1:20 M

SLAB SOFFIT LEVEL +3.60


.70

.70
.85

17
FIN. CEILING LEVEL +3.15 16

.20
15
14 SEE DETAIL 01
13
12
11
2.25

10
4.00

4.00
09
08
2.80

2.75
07 .30
LANDING +1.05 06
PORCELAIN TILE FLOOR FINISH

(VARIES)
05
04

.17
2mm CHAMFERED NOSING
.50 .20
.70

5x5mm GROOVE
GROUND FLOOR LEVEL + 0.35
.20 .15
.35

.35
SIDEWALK LEVEL + 0.20
ROAD LEVEL + 0.00

REINFORCED CONCRETE

SEE DETAIL 02
CEMENT PLASTER FINISH
PAINTED FINISH

1 SECTION A 3 BLOWN-UP DETAIL 2


SCALE 1:50 M SCALE 1:20 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT STAIR DETAIL 03 MKAN ARCHITECTS


www.mkan.sa
2.00 2.00

.20 1.60 .20 .20 1.60 .20

.20

.20

.20

.20
SLOPE TO DRAIN
EL. -1.65 FFL (VERIFY)
A A

SLOPE TO DRAIN
2.40

2.00

2.00

2.40

2.40

2.00

2.00

2.40
04
03
02
01

.20

.20

.20

.20
.33 .95 .33

.20 1.60 .20 .33 .95 .32

2.00 .20 1.60 .20

2.00

1 ELEVATOR PLAN @ PIT


SCALE 1:50 M 2 ELEVATOR PLAN @ GROUND FLOOR
SCALE 1:50 M

2.00
CONTROL PANEL
(REFER TO MANUFACTURER'S
.20 1.60 .20 STANDARD)

SHEAR WALL: SMOOTH


PLASTER, PAINT FINISH

ELEVATOR LANTERN
(REFER TO MANUFACTURER'S
.20

.20

STANDARD)

A ELEVATOR DOOR, STAINLESS


STEEL FINISH
(REFER TO MANUFACTURER'S
CEILING LEVEL
STANDARD)
2.40

2.00

2.00

2.40

04
03 ELEVATOR CALL STATION
(REFER TO MANUFACTURER'S
02 STANDARD)
01
.20

.20

2.80
.33 .95 .32

.20 1.60 .20 FFL

2.00

3 ELEVATOR PLAN @ FIRST FLOOR 4 TYPICAL ELEVATION


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT ELEVATOR DETAIL 01 MKAN ARCHITECTS


www.mkan.sa
TOPMOST PARAPET LEVEL + 8.20 M

.30
1.00

.70
TOP OF ROOF LEVEL + 7.20 M

.45 .30
FINISHED CEILING LEVEL + 6.45 M

3.55

2.80
FIN. 1ST FLOOR LEVEL + 3.65 M

.40
.45
FINISHED CEILING LEVEL + 2.80 M

3.65

2.80
FINISHED GROUND FLR LVL + 0.00 M

FINISHED GRADE LEVEL - 0.35 M

(VERIFY)
1.35
1.65

.30

1 SECTION A
SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT ELEVATOR DETAIL 02 MKAN ARCHITECTS


www.mkan.sa
SEVENTH | TOILET DETAILS
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.05

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)

1.70
0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)
VANITY MIRROR ATTACHED TO WALL

D
2.85

D
2.80

2.80

2.80

2.80
2.82

2.75
WOOD TEXTURED, SOLID WOOD WOOD TEXTURED, SOLID WOOD FLUSH DOOR
8 FLUSH DOOR 10 CEILING MOUNTED FAUCET (VERIFY ARCHITECT)

0.20
LAVATORY ( VERIFY ARCHITECT)

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)

0.02
4.10
2 TOILET 1 SECTION A 3 TOILET 1 SECTION B
SCALE 1:50 M SCALE 1:50 M
0.20 2.30 0.20 1.20 0.20

0.20

0.20
HIDDEN
DOOR

1.30
A
D B

1.90
2.40

2.40
C
LAV WC

0.20 0.60
CLOAK / FD
ABAYA

0.20 0.10
0.10
0.20 2.30 0.20 1.20 0.20

4.10
GUEST'S TOILET
1 TOILET 1 PLAN
SCALE 1:50 M

MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD


CEILING PAINT FINISH CEILING PAINT FINISH

0.60MX0.60M PORCELAIN GLAZED WALL TILES 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)

1.70
1.70

(REFER TO ARCHITECT'S APPROVAL)

VANITY MIRROR ATTACHED TO WALL VANITY MIRROR ATTACHED TO WALL


2.80

2.80

2.80
2.80
2.82

CLOAK/ABAYA CLOSET CLOAK/ABAYA CLOSET

WOOD TEXTURED, SOLID WOOD FLUSH DOOR CEILING MOUNTED FAUCET (VERIFY ARCHITECT)

0.20
0.10 0.80 0.20

LAVATORY ( VERIFY ARCHITECT)


WALL MOUNTED WATER CLOSET

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)
0.02

4 TOILET 1 SECTION C 5 TOILET 1 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 01 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.05

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
0.60MX0.60M PORCELAIN GLAZED WALL TILES (REFER TO ARCHITECT'S APPROVAL)
(REFER TO ARCHITECT'S APPROVAL)

1.30
VANITY MIRROR ATTACHED TO WALL

WOOD TEXTURED, SOLID WOOD WOOD TEXTURED, SOLID WOOD FLUSH DOOR
D FLUSH DOOR D
2.40

2.40

2.40

2.40
2.42
2.35

2.35
CEILING MOUNTED FAUCET (VERIFY ARCHITECT)
7

0.20
9
LAVATORY ( VERIFY ARCHITECT)

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)

0.02
3.20
2 TOILET 2 SECTION A 3 TOILET 2 SECTION B
SCALE 1:50 M SCALE 1:50 M
0.20 1.20 0.20 1.40 0.20

0.20

0.20
HIDDEN
DOOR

1.30
D B
C

1.90
2.40

2.40
LAV WC

0.20 0.60

0.10

0.10

0.20
0.20 1.20 0.20 1.40 0.20

3.20
COMMON TOILET
1 TOILET 2 PLAN
SCALE 1:50 M

MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD


CEILING PAINT FINISH CEILING PAINT FINISH

0.60MX0.60M PORCELAIN GLAZED WALL TILES 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL) (REFER TO ARCHITECT'S APPROVAL)

1.30
1.30

VANITY MIRROR ATTACHED TO WALL VANITY MIRROR ATTACHED TO WALL

CEILING MOUNTED FAUCET (VERIFY ARCHITECT) CLOAK/ABAYA CLOSET


2.40

2.40

2.40
2.40
2.42

WOOD TEXTURED, SOLID WOOD FLUSH DOOR CEILING MOUNTED FAUCET (VERIFY ARCHITECT)

0.20
0.20

LAVATORY ( VERIFY ARCHITECT) LAVATORY ( VERIFY ARCHITECT)


WALL MOUNTED WATER CLOSET
0.90

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)
0.02

4 TOILET 2 SECTION C 5 TOILET 2 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 02 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.05

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)

0.60MX0.60M PORCELAIN GLAZED WALL TILES


VANITY MIRROR ATTACHED TO WALL

1.70
1.77 (REFER TO ARCHITECT'S APPROVAL)

TEMPERED GLASS PANEL WITH


POWDER-COATED ALUMINUM FRAME

2.70

2.80

2.80

2.70

2.80
2.82

TEMPERED GLASS SLIDING DOOR WITH F


PODER-COATED ALUMINUM FRAME CEILING MOUNTED FAUCET (VERIFY ARCHITECT)

0.20
0.30

0.10M WALL NICHE LAVATORY ( VERIFY ARCHITECT)

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR
0.73

TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)

0.05

0.05
0.02

3.70
2 TOILET 3 SECTION A 3 TOILET 3 SECTION B
SCALE 1:50 M SCALE 1:50 M
0.20 3.30 0.20

0.20

0.20
0.25
A
D B

1.40
C

2.40

2.00

2.40
1.50
LAV WC
SHO
FD

0.20 0.10 0.50

0.25
SD

0.20
0.20 1.10 1.10 1.10 0.20

3.70

MASTER TOILET
MOISTURE RESISTANT GYPSUM BOARD 1 TOILET 3 PLAN
CEILING PAINT FINISH SCALE 1:50 M

0.60MX0.60M PORCELAIN GLAZED WALL TILES MOISTURE RESISTANT GYPSUM BOARD


(REFER TO ARCHITECT'S APPROVAL) CEILING PAINT FINISH

0.05
VANITY MIRROR ATTACHED TO WALL 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)
RAINFALL SHOWERHEAD
(REFER TO ARCHITECT'S APPROVAL)

1.70
VANITY MIRROR ATTACHED TO WALL
1.77
2.00

CEILING MOUNTED FAUCET (VERIFY ARCHITECT) TEMPERED GLASS PANEL WITH POWDER-COATED
TEMPERED GLASS PANEL WITH ALUMINUM FRAME
2.80

2.80

2.70

2.80
2.82

POWDER-COATED ALUMINUM FRAME F


CEILING MOUNTED FAUCET (VERIFY ARCHITECT)
LAVATORY ( VERIFY ARCHITECT)

0.20
0.30

0.10M WALL NICHE LAVATORY ( VERIFY ARCHITECT)


0.38

WALL MOUNTED WATER CLOSET

0.90
0.75

0.60MX0.60M NON-SKID PORCELAIN FLOOR


0.42

0.60MX0.60M NON-SKID PORCELAIN FLOOR TILE (REFER TO ARCHITECT'S APPROVAL)

0.05
0.02

TILE (REFER TO ARCHITECT'S APPROVAL)

4 TOILET 3 SECTION C 5 TOILET 3 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 03 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH

0.60MX0.60M PORCELAIN GLAZED WALL TILES MOISTURE RESISTANT GYPSUM BOARD


(REFER TO ARCHITECT'S APPROVAL) CEILING PAINT FINISH

0.05
VANITY MIRROR ATTACHED TO WALL 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)
RAINFALL SHOWERHEAD
1.70 (REFER TO ARCHITECT'S APPROVAL)

1.70
VANITY MIRROR ATTACHED TO WALL

1.77
CEILING MOUNTED FAUCET (VERIFY ARCHITECT) TEMPERED GLASS PANEL WITH POWDER-COATED
TEMPERED GLASS PANEL WITH ALUMINUM FRAME
2.80

2.80

2.70

2.80
2.82
POWDER-COATED ALUMINUM FRAME F
CEILING MOUNTED FAUCET (VERIFY ARCHITECT)
LAVATORY ( VERIFY ARCHITECT)
0.20

0.20
0.30
0.10M WALL NICHE LAVATORY ( VERIFY ARCHITECT)

WALL MOUNTED WATER CLOSET


0.90

0.90
0.75
0.60MX0.60M NON-SKID PORCELAIN FLOOR
0.60MX0.60M NON-SKID PORCELAIN FLOOR TILE (REFER TO ARCHITECT'S APPROVAL)

0.05
0.02
TILE (REFER TO ARCHITECT'S APPROVAL)

3.70

2 TOILET 4 SECTION A 0.20 2.20 1.10 0.20 3 TOILET 4 SECTION B


SCALE 1:50 M SCALE 1:50 M

0.50 0.100.20

0.20
0.25
SD
FD
SHO
LAV WC

2.20

2.20
1.30

1.80
A

1.20
D B
C

0.25
0.20

0.20
0.20 0.20 1.00 0.20 1.90 0.20

3.70

BEDROOM 01 TOILET
1 TOILET 4 PLAN
SCALE 1:50 M

MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD


CEILING PAINT FINISH CEILING PAINT FINISH
0.05

0.60MX0.60M PORCELAIN GLAZED WALL TILES


0.60MX0.60M PORCELAIN GLAZED WALL TILES (REFER TO ARCHITECT'S APPROVAL)
(REFER TO ARCHITECT'S APPROVAL)
VANITY MIRROR ATTACHED TO WALL

1.70
1.77

WOOD TEXTURED, SOLID WOOD FLUSH DOOR


CEILING MOUNTED FAUCET (VERIFY ARCHITECT)
D
2.80

2.80

2.80
2.82

2.75

10 LAVATORY ( VERIFY ARCHITECT)

0.20
TEMPERED GLASS SLIDING DOOR WITH
0.30

PODER-COATED ALUMINUM FRAME


WALL MOUNTED WATER CLOSET

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR
0.73

TILE (REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M NON-SKID PORCELAIN FLOOR


TILE (REFER TO ARCHITECT'S APPROVAL)
0.02

4 TOILET 4 SECTION C 5 TOILET 4 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 04 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
0.60MX0.60M PORCELAIN GLAZED WALL TILES (REFER TO ARCHITECT'S APPROVAL)
(REFER TO ARCHITECT'S APPROVAL)
VANITY MIRROR ATTACHED TO WALL

1.70
1.77
WOOD TEXTURED, SOLID WOOD FLUSH DOOR
CEILING MOUNTED FAUCET (VERIFY ARCHITECT)
D

2.80

2.80

2.80
2.82

2.75
10 LAVATORY ( VERIFY ARCHITECT)

0.20
TEMPERED GLASS SLIDING DOOR WITH
0.30

PODER-COATED ALUMINUM FRAME


WALL MOUNTED WATER CLOSET

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR
0.73

TILE (REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M NON-SKID PORCELAIN FLOOR


TILE (REFER TO ARCHITECT'S APPROVAL)
0.02

2.90

2 TOILET 5 SECTION A 0.20 0.90 1.60 0.20 3 TOILET 5 SECTION B


SCALE 1:50 M SCALE 1:50 M

21

0.20

0.20
HIDDEN
20

0.25
DOOR

19

0.90
A
18

1.40
D B
C

2.40
2.40

2.00
1.50
17

WC LAV

1.10
SHO

0.10 0.50
FD

0.25
SD

0.20
0.20
0.20 0.90 1.60 0.20

2.90

BEDROOM 2 & 3 TOILET


MOISTURE RESISTANT GYPSUM BOARD 1 TOILET 5 PLAN
CEILING PAINT FINISH SCALE 1:50 M

0.60MX0.60M PORCELAIN GLAZED WALL TILES MOISTURE RESISTANT GYPSUM BOARD


(REFER TO ARCHITECT'S APPROVAL) CEILING PAINT FINISH

0.05

0.05
VANITY MIRROR ATTACHED TO WALL 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)
RAINFALL SHOWERHEAD
(REFER TO ARCHITECT'S APPROVAL)
1.70

VANITY MIRROR ATTACHED TO WALL


1.77

CEILING MOUNTED FAUCET (VERIFY ARCHITECT) TEMPERED GLASS PANEL WITH POWDER-COATED

2.33
TEMPERED GLASS PANEL WITH ALUMINUM FRAME
2.80

2.80

2.70

2.80
2.82

POWDER-COATED ALUMINUM FRAME F


CEILING MOUNTED FAUCET (VERIFY ARCHITECT)
LAVATORY ( VERIFY ARCHITECT)
0.20

0.30

0.10M WALL NICHE LAVATORY ( VERIFY ARCHITECT)

WALL MOUNTED WATER CLOSET


0.90

0.73

0.60MX0.60M NON-SKID PORCELAIN FLOOR

0.42
0.60MX0.60M NON-SKID PORCELAIN FLOOR TILE (REFER TO ARCHITECT'S APPROVAL)

0.05
0.02

TILE (REFER TO ARCHITECT'S APPROVAL)

4 TOILET 5 SECTION C 5 TOILET 5 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 05 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.60MX0.60M PORCELAIN GLAZED WALL TILES


0.60MX0.60M PORCELAIN GLAZED WALL TILES (REFER TO ARCHITECT'S APPROVAL)
(REFER TO ARCHITECT'S APPROVAL)
VANITY MIRROR ATTACHED TO WALL

1.70
1.90

1.90
VANITY MIRROR ATTACHED TO WALL
2.80

2.80

2.80

2.80
TEMPERED GLASS SLIDING DOOR WITH TEMPERED GLASS PANEL WITH POWDER-COATED
PODER-COATED ALUMINUM FRAME ALUMINUM FRAME

0.20
LAVATORY AND FAUCET (VERIFY ARCHITECT) LAVATORY AND FAUCET (VERIFY ARCHITECT)
0.90

0.90

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL)

2 TOILET 6 SECTION A 3 TOILET 6 SECTION B


SCALE 1:50 M 2.15 SCALE 1:50 M

0.15 1.80 0.20

0.20

0.20
0.10

LAV

0.90
0.90
A
D B

2.40

2.00

2.40
2.00
C
WC

1.00
0.90
SHO
FD SD

0.10

0.10

0.20
0.20
0.15 1.00 0.80 0.20

2.15

MAID'S TOILET
MOISTURE RESISTANT GYPSUM BOARD 1 TOILET 6 PLAN
CEILING PAINT FINISH SCALE 1:50 M

MOISTURE RESISTANT GYPSUM BOARD


CEILING PAINT FINISH
0.05

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)

TEMPERED GLASS PANEL WITH TEMPERED GLASS PANEL WITH POWDER-COATED


POWDER-COATED ALUMINUM FRAME ALUMINUM FRAME
2.39

2.39
2.80

2.70

2.80

2.80

2.70

2.80
FLOOR MOUNTED WATER CLOSET

FLOOR MOUNTED WATER CLOSET

0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR


0.42

0.42
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)
0.05

0.05
4 TOILET 6 SECTION C 5 TOILET 6 SECTION D
SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 06 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.05

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)
TEMPERED GLASS PANEL WITH
POWDER-COATED ALUMINUM FRAME TEMPERED GLASS PANEL WITH POWDER-COATED

1.99

1.99
ALUMINUM FRAME
2.40

2.30

2.40

2.40

2.30

2.40
FLOOR MOUNTED WATER CLOSET

FLOOR MOUNTED WATER CLOSET

0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR

0.42

0.42
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)
0.05

0.05
2 TOILET 7 SECTION A 3 TOILET 7 SECTION B
SCALE 1:50 M 2.20 SCALE 1:50 M

0.20 0.80 1.00 0.20

0.20

0.20
SD FD
SHO

1.00
1.00
WC

2.40

2.00

2.40
2.00
A
D B
C

0.90
LAV
1.00

0.10

0.20
0.20
0.20 1.80 0.20

2.20

DRIVER'S TOILET (UNIT A&B)


1 TOILET 7 PLAN
SCALE 1:50 M

MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD


CEILING PAINT FINISH CEILING PAINT FINISH
0.05

0.60MX0.60M PORCELAIN GLAZED WALL TILES 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL) (REFER TO ARCHITECT'S APPROVAL)

1.30
1.50

VANITY MIRROR ATTACHED TO WALL VANITY MIRROR ATTACHED TO WALL

TEMPERED GLASS SLIDING DOOR WITH TEMPERED GLASS PANEL WITH POWDER-COATED
2.40

2.30

2.40

2.40

2.40
PODER-COATED ALUMINUM FRAME ALUMINUM FRAME

0.20
LAVATORY AND FAUCET (VERIFY ARCHITECT) LAVATORY AND FAUCET (VERIFY ARCHITECT)
0.90

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL)
0.05

4 TOILET 7 SECTION C 5 TOILET 7 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 07 MKAN ARCHITECTS


www.mkan.sa
MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD
CEILING PAINT FINISH CEILING PAINT FINISH

0.05

0.05
0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)

TEMPERED GLASS PANEL WITH TEMPERED GLASS PANEL WITH POWDER-COATED


POWDER-COATED ALUMINUM FRAME ALUMINUM FRAME

1.99

1.99
2.40

2.30

2.40

2.40

2.30

2.40
FLOOR MOUNTED WATER CLOSET

FLOOR MOUNTED WATER CLOSET

0.60MX0.60M NON-SKID PORCELAIN FLOOR 0.60MX0.60M NON-SKID PORCELAIN FLOOR

0.42

0.42
TILE (REFER TO ARCHITECT'S APPROVAL) TILE (REFER TO ARCHITECT'S APPROVAL)
0.05

0.05
2 TOILET 8 SECTION A 3 TOILET 8 SECTION B
SCALE 1:50 M SCALE 1:50 M

2.20

0.20 0.80 1.00 0.20

0.20

0.20
SD FD
SHO

1.15

1.15
WC

2.55

2.15

2.55
2.15
A
D B
C

0.90
LAV
1.00

0.10

0.20
0.20
0.20 1.80 0.20

2.20

DRIVER'S TOILET (UNIT C&D)


1 TOILET 8 PLAN
SCALE 1:50 M

MOISTURE RESISTANT GYPSUM BOARD MOISTURE RESISTANT GYPSUM BOARD


CEILING PAINT FINISH CEILING PAINT FINISH
0.05

0.60MX0.60M PORCELAIN GLAZED WALL TILES


0.60MX0.60M PORCELAIN GLAZED WALL TILES
(REFER TO ARCHITECT'S APPROVAL)
(REFER TO ARCHITECT'S APPROVAL)

1.30
VANITY MIRROR ATTACHED TO WALL VANITY MIRROR ATTACHED TO WALL
1.50

TEMPERED GLASS SLIDING DOOR WITH TEMPERED GLASS PANEL WITH POWDER-COATED
2.40

2.30

2.40

2.40

2.40
PODER-COATED ALUMINUM FRAME ALUMINUM FRAME

0.20
LAVATORY AND FAUCET (VERIFY ARCHITECT) LAVATORY AND FAUCET (VERIFY ARCHITECT)
0.90

0.90
0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL) 0.60MX0.60M NON-SKID PORCELAIN FLOOR
TILE (REFER TO ARCHITECT'S APPROVAL)
0.05

4 TOILET 8 SECTION C 5 TOILET 8 SECTION D


SCALE 1:50 M SCALE 1:50 M

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT DETAILS OF TOILET 08 MKAN ARCHITECTS


www.mkan.sa
EIGHT | SCHEDULE OF DOORS AND WINDOWS
1.40 2.00 1.20 2.30 2.00
INSIDE OUTSIDE INSIDE OUTSIDE

℄ ℄ ℄ ℄ ℄
0.40 1.00 1.00 1.00 0.05 1.10 0.05 1.15 1.15 0.05 1.90 0.05

PLAN PLAN PLAN PLAN PLAN

1.40 2.00 1.20 2.30 2.00

0.05 1.30 0.05 0.05 1.10 0.05 1.15 1.15 0.05 1.90 0.05

CEILING LEVEL
0.05

0.05
1.80

1.80
2.80

2.80

2.80
2.80

2.80
2.75

2.75
1.00

1.00
FINISH FLOOR

ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION


D D D D D
1 2 3 4 5

DOOR NO. D-1 DOOR NO. D-2 DOOR NO. D-3 DOOR NO. D-4 DOOR NO. D-5
DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL DOOR TYPEINTERNAL
DIMENSION1.30M (W)2.75
x M (H) DIMENSION2.00M (W)2.80
x M (H) DIMENSION1.10M (W)2.75
x M (H) DIMENSION1.15M (W)2.80
x M (H) DIMENSION2.00M (W)2.80
x M (H)
LOCATION GROUND FLOOR LOCATION GROUND FLOOR LOCATION GROUND FLOOR LOCATION LAUNDRY ROOM LOCATION GROUND FLOOR
DESCRIPTION
GLASS PIVOT DOOR DESCRIPTION
GLASS SLIDING DOOR DESCRIPTION
SWING-TYPE GLASS DOOR DESCRIPTION
GLASS SLIDING DOOR DESCRIPTION
GLASS SLIDING DOOR

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SCHEDULE OF DOORS 01 MKAN ARCHITECTS


www.mkan.sa
1.20 1.00 1.00 1.00 1.00
INSIDE INSIDE INSIDE INSIDE

℄ ℄ ℄ ℄ ℄
1.20 0.05 0.90 0.05 0.05 0.90 0.05 0.05 0.90 0.05 0.05 0.90 0.05

PLAN PLAN PLAN PLAN PLAN

1.20 1.00 1.00 1.00 1.00

0.05 1.10 0.05 0.05 0.90 0.05 0.05 0.90 0.05 0.05 0.90 0.05 0.05 0.90 0.05

0.05
CEILING LEVEL

0.05
0.05

0.05

0.05
1.70

1.80

1.80
1.40
1.40

2.85
2.80

2.70

2.80

2.80

2.80

2.75
2.45

2.40

2.40

2.35
0.90 0.20

1.00

1.00

1.00

1.00
0.05

FINISH FLOOR
DIRECT DOOR TO
WALL CONNECTION
(CONCEALED HINGE)

ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION


D D D D D
6 7 8 9 10

DOOR NO. D-6 DOOR NO. D-7 DOOR NO. D-8 DOOR NO. D-9 DOOR NO. D-10
DOOR TYPEINTERNAL DOOR TYPEINTERNAL DOOR TYPEINTERNAL DOOR TYPEINTERNAL DOOR TYPEINTERNAL
DIMENSION1.20M (W)2.80
x M (H) DIMENSION0.90M (W)2.40
x M (H) DIMENSION0.90M (W)2.80
x M (H) DIMENSION0.90M (W)2.35
x M (H) DIMENSION0.90M (W)2.75
x M (H)
LOCATION GROUND FLOOR LOCATION GROUND FLOOR TOILET LOCATION GENERAL LOCATION GROUND FLOOR TOILET LOCATION GENERAL
DESCRIPTION
TEMPERED GLASS DOOR DESCRIPTION
WOOD HIDDEN DOOR DESCRIPTION
WOOD HIDDEN DOOR DESCRIPTION
WOOD SWING DOOR DESCRIPTION
WOOD SWING DOOR

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SCHEDULE OF DOORS 02 MKAN ARCHITECTS


www.mkan.sa
0.90 0.90 1.00 2.50 1.10 2.00
OUTSIDE INSIDE OUTSIDE OUTSIDE

℄ ℄ ℄ ℄ ℄ ℄
0.05 0.80 0.05 0.05 0.80 0.05 0.05 0.90 0.05 0.05 1.20 1.20 0.05 0.05 1.00 0.05 0.05 0.95 0.95 0.05

PLAN PLAN PLAN PLAN PLAN PLAN

0.90 0.90 1.00 2.50 1.10 2.10

0.05 0.80 0.05 0.05 0.80 0.05 0.05 0.90 0.05 0.05 1.20 1.20 0.05 0.05 1.00 0.05 0.05 1.00 1.00 0.05

CEILING LEVEL

0.05

0.05

0.05

0.05
1.80

1.40

1.40
2.80

2.80

2.80
2.75

2.75

2.45

2.45
2.40

2.40
2.40

1.00

1.00

1.00
FINISH FLOOR

ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION


D D D D D D
11 11A 12 13 14 15

DOOR NO. D-11 DOOR NO. D-11A DOOR NO. D-12 DOOR NO. D-13 DOOR NO. D-14 DOOR NO. D-15
DOOR TYPEINTERNAL DOOR TYPEINTERNAL DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL
DIMENSION0.90M (W)2.80
x M (H) DIMENSION0.90M (W)2.40
x M (H) DIMENSION0.90M (W)2.75
x M (H) DIMENSION1.20M (W)2.75
x M (H) DIMENSION1.00M (W)2.40
x M (H) DIMENSION2.00M (W)2.40
x M (H)
LOCATION TOILETS LOCATION DRIVER'S TOILETS LOCATION FIRST FLOOR LOCATION GROUND FLOOR LOCATION DRIVER'S ROOM LOCATION SCECO ROOM
DESCRIPTION
GLASS SLIDING DOOR DESCRIPTION
GLASS SLIDING DOOR DESCRIPTION
SWING-TYPE GLASS DOOR DESCRIPTION
GLASS SLIDING DOOR DESCRIPTION
WOOD HIDDEN DOOR DESCRIPTION
WOOD HIDDEN DOOR

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SCHEDULE OF DOORS 03 MKAN ARCHITECTS


www.mkan.sa
3.70 6.05 8.20
INSIDE INSIDE INSIDE
0.30 1.20 2.20 0.11 2.80 0.22 2.80 0.11 0.35 2.80 0.35 2.80 0.35 1.20 0.35

℄ ℄ ℄

PLAN PLAN PLAN

3.70 6.05 8.20

0.30 1.20 2.20 0.11 1.40 1.40 0.22 1.40 1.40 0.11 0.35 1.40 1.40 0.35 1.40 1.40 0.35 1.20 0.35
0.01

0.01

0.01
2.40

2.38

2.40

2.40

2.38

2.40

2.40

2.38

2.40
0.01

0.01

0.01
FINISH FLOOR

ELEVATION ELEVATION ELEVATION


D D D
16 17 18

DOOR NO. D-16 DOOR NO. D-17 DOOR NO. D-18


DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL DOOR TYPEEXTERNAL
DIMENSION3.70M (W)2.40
x M (H) DIMENSION6.05M (W)2.40
x M (H) DIMENSION8.20M (W)2.40
x M (H)
LOCATION CORNER UNIT ENTRANCE LOCATION CORNER UNIT ENTRANCE LOCATION INNER UNIT ENTRANCE
DESCRIPTION
SWING-TYPE STEEL GATE DESCRIPTION
SWING-TYPE STEEL GATE DESCRIPTION
SWING-TYPE STEEL GATE

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SCHEDULE OF DOORS 04 MKAN ARCHITECTS


www.mkan.sa
1.40 2.60 2.50 2.00
INSIDE INSIDE OUTSIDE

℄ ℄ ℄ ℄
0.05 1.30 0.05 0.05 2.40 0.05 0.05 1.90 0.05
0.05 1.23 0.05 1.23 0.05
PLAN PLAN PLAN
PLAN
1.40 2.60 2.50

0.05 1.30 0.05 0.05 1.23 0.05 1.23 0.05 0.05 2.40 0.05
PARAPET LEVEL 0.05

0.05
1.15

1.15

1.25
F F F
0.05

0.05
CEILING LEVEL

0.05
1.80

1.90

1.90
F

4.90

4.90
4.95

2.80

2.70
F
0.05

0.05

0.90
7.70

2.00
1.80

0.05
1.65
FINISH FLOOR F F F
0.05 1.90 0.05

0.85
0.05
CEILING LEVEL

0.05
0.05

2.80

2.70
2.75

F
1

0.05
FINISH FLOOR

ELEVATION ELEVATION ELEVATION ELEVATION


W W W W
1 2 3 4

WINDOW NO. W-01 WINDOW NO. W-02 WINDOW NO. W-03 WINDOW NO. W-04
WINDOW TYPEEXTERNAL WINDOW TYPEEXTERNAL WINDOW TYPEEXTERNAL WINDOW TYPEINTERNAL
DIMENSION 1.40 M (W) 4.95 M (H) DIMENSION 2.60 M (W) 4.90 M (H) DIMENSION 2.50 M (W) 2.80 M (H) DIMENSION 2.00 M (W) 2.80 M (H)
LOCATION GROUND FLOOR LEVEL LOCATION FIRST FLOOR LEVEL LOCATION FIRST FLOOR LEVEL LOCATION GROUND FLOOR LEVEL
DESCRIPTION FIXED GLASS WINDOW DESCRIPTION AWNING GLASS WINDOW DESCRIPTION FIXED GLASS WINDOW DESCRIPTION FIXED GLASS WINDOW

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SCHEDULE OF WINDOWS 01 MKAN ARCHITECTS


www.mkan.sa
1.60 1.10 0.90 0.50 0.50
OUTSIDE

℄ ℄ ℄ ℄ ℄
0.05 0.72 0.05 0.72 0.05 0.05 1.00 0.05 0.05 0.80 0.05 0.05 0.40 0.05 0.05 0.40 0.05

PLAN PLAN PLAN PLAN PLAN

1.60 1.10 0.90 0.50 0.50

0.05 0.72 0.05 0.72 0.05 0.05 1.00 0.05 0.05 0.80 0.05 0.050.400.05 0.050.400.05

CEILING LEVEL
0.05

0.05

0.05

0.05

0.05
D D
2.80

2.70

2.80

2.70

2.80

2.70

2.80

2.70
F F F F F

2.40

2.30
11 11 F
0.05

0.05

0.05

0.05

0.05
FINISH FLOOR

ELEVATION ELEVATION ELEVATION ELEVATION ELEVATION


W W W W W
5 6 7 8 9

WINDOW NO. W-05 WINDOW NO. W-06 WINDOW NO. W-07 WINDOW NO. W-08 WINDOW NO. W-09
WINDOW TYPEEXTERNAL WINDOW TYPEINTERNAL WINDOW TYPEINTERNAL WINDOW TYPEINTERNAL WINDOW TYPEINTERNAL
DIMENSION 1.60 M (W) 2.80 M (H) DIMENSION 1.10 M (W) 2.80 M (H) DIMENSION 0.90 M (W) 2.80 M (H) DIMENSION 0.50 M (W) 2.80 M (H) DIMENSION 0.50 M (W) 2.40 M (H)
LOCATION MASTER BEDROOM LOCATION BEDROOM 2 & 3 TOILET LOCATION BEDROOM 1 TOILET LOCATION MAID'S TOILET LOCATION DRIVER'S TOILET
DESCRIPTION FIXED GLASS WINDOW DESCRIPTION FIXED GLASS WINDOW DESCRIPTION FIXED GLASS WINDOW DESCRIPTION FIXED GLASS WINDOW DESCRIPTION FIXED GLASS WINDOW

PROJECT TITLE CONTENT

GRAVURE VILLAS - KING FAHD DISTRICT SCHEDULE OF WINDOWS 02 MKAN ARCHITECTS


www.mkan.sa
COPYRIGHT © 2021 MKAN ARCHITECTS

You might also like