Comments Response Sheet (CRS) : Major Projects Template MAJOR ASY MPQA MPQA FOR 000005 - Rev02Dated 14/11/2019
Comments Response Sheet (CRS) : Major Projects Template MAJOR ASY MPQA MPQA FOR 000005 - Rev02Dated 14/11/2019
Incorporated as is
1 Page 4 FMA F scope reference to be included.
Noted & updated accordingly with latest template.
Please clarify if Architectural insulation is considered in this Incorporated with minor modification
2 Page 5 HVA document. Architectural insulation is not under the scope of this
In section scope a paragraph for exclusion shall be added. document. A exclusion paragraph is added for more clear.
Incorporated with minor modification
Please clarify if HVAC insulation is considered in this document.
3 Page 5 HVA HVAC insulation is not under the scope of this document. A
In section scope a paragraph for exclusion shall be added.
exclusion paragraph is added for more clear.
Incorporated as is
as SD-NOC-COR-772 is referenced, clarify if this document also
4 Page 5 HVA Noted. Cold insulation is applied for potable water system on
amends and supplements this standard.
GE platform. So, amendment for SD-NOC-COR-772 is added.
Incorporated as is
10 Page 6 YSU SD-NOC-COR-772
Noted & updated accordingly.
Incorporated as is
11 Page 6 HVA Typo replace by Cold
Noted & updated accordingly.
Incorporated as is
12 Page 6 YSU Please add SD-NOC-COR-350
Noted & updated accordingly.
Page 1 of 2 Major Projects Template MAJOR‐ASY‐MPQA‐MPQA‐FOR‐000005_Rev02Dated 14/11/2019
Comments Response Sheet (CRS) Project No / Title Gallaf Batch 3
Incorporated as is
Due to it is one of the main job of FEED to provide Thickness As modification of clause 5.6 "Insulation thickness shall be
insulation Please explain from where are these minimum calculated in accordance with ISO 12241. Insulation
17 Page 11 HVA
Thicknesses. thicknesses are given in Appendix 4 and shall be verified
and minimum thickness by layer shall be provided. based on final selected products and adjusted up to closest
standard thickness given by the manufacturer."
Why make 2 columns if the thickness at both columns are the Incorporated as is
18 Page 12 YSU
same? Noted & updated accordingly.
Why make 2 columns if the thickness at both columns are the
same? Incorporated as is
19 Page 13 YSU
What is the system and thickness for operating temp more then 250 Noted & updated accordingly.
deg C
Page 2 of 2 Major Projects Template MAJOR‐ASY‐MPQA‐MPQA‐FOR‐000005_Rev02Dated 14/11/2019
Block 5 - AL SHAHEEN FIELD Development
Ramachenderam
01 09-Jul-2020 AFD Accepted for Design Anh Duong Dinh Ho Tso Han
Karuppan
Ramachenderam
00 21-May-2020 IFR Issued for Review Anh Duong Dinh Ho Tso Han
Published in iPDF on 09/07/2020
Karuppan
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 1 of 21
Block 5 - AL SHAHEEN FIELD Development
REVISION HISTORY
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 2 of 21
Block 5 - AL SHAHEEN FIELD Development
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................................................... 4
2. PURPOSE .............................................................................................................................................. 6
3. SCOPE ................................................................................................................................................... 6
4. REFERENCES ........................................................................................................................................ 6
5.1. DEFINITIONS............................................................................................................................................ 8
5.2. ABBREVIATIONS........................................................................................................................................ 9
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 3 of 21
Block 5 - AL SHAHEEN FIELD Development
1. INTRODUCTION
North Oil Company (NOC) (referred as COMPANY in this document) is a crude oil and natural gas company based in Qatar.
The operations along with production, sale and export of crude oil have started since 14th July 2017.
The Al Shaheen field is Qatar’s largest oil field. It is a conventional oil field (60m W D) situated offshore in Qatar
approximately 70km NNE of Ras Laffan. The field overlays the giant pre -Khuff gas field known as North Field.
In order to sustain and further increase current production rate with a strategy to achieve a plateau of 300 kbopd,
COMPANY has initiated Gallaf project (Phase 2) to install seven new WHPs, in three batches as detailed below:
➢ Batch - 1: New bridge-linked Wellhead platform (24 Slots) including jackets (DC / FC / EG), shall be installed and
the new WHP’s shall be integrat ed with their respective existing host platforms (DA / FA / ED) facilities.
➢ Batch - 2: New bridge-linked Wellhead platform (24 Slots) including jackets (CE / EH) shall be installed and the
new WHP’s shall be integrated with their respective host platforms (CD / EG) facilities.
➢ Batch - 3: New WHP’s (JA / KA) shall be remote connected to a new Process Platform (GE), bridge -linked to
existing facilities GD and corresponding brownfield integration on F and G locations.
A schematic showing the locations for the three batches is presented below:
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 4 of 21
Block 5 - AL SHAHEEN FIELD Development
The present documentation is for Batch 3 FEED, and the main objective is to develop the design of the facilities to a point
where EPCIC CONTRACTORS can start Detailed Engineering for Procurement, Construction, Installation and Commissioning
of the new greenfield facilities and brownfield works.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 5 of 21
Block 5 - AL SHAHEEN FIELD Development
2. PURPOSE
The purpose of this document is to define insulation specification for Al Shaheen Phase 2 – Batch 3 project.
To minimize the risk of Corrosion Under Insulation (CUI), the use of insulation shall b e minimized to the extent possible.
If unavoidable, insulation system shall be adequately designed to minimize these risks.
3. SCOPE
This specification defines the additional technical requirements for thermal insulation applied for piping systems &
equipment on platforms for Al Shaheen Phase 2 – Batch 3 project. This document amends and supplements t he following
COMPANY standards:
Modification to the above listed COMPANY standards are identified as Add, Modify, Replace or Delete. Clauses of the above
standards that are not addressed within this document shall remain fully applicable as written.
This specification excludes HVAC & Architectural insulation which are addressed separately in HVAC/Architectural particular
specification.
4. REFERENCES
WHP03-TFM2-ASYYY-12-262006-
[1] Batch 3 Material Selection & Corrosion Control Philosophy
0001
WHP03-TFM2-ASYYY-12-262007-
[2] Batch 3 Corrosion Management Philosophy
0001
WHP03-TFM2-ASYYY-12-392011-
[3] Batch 3 Painting Specifications
0001
WHP03-TFM2-ASGEA-12-340001- GE Process Platform Material Selection and Corrosion Control
[4]
0001 Report
WHP03-TFM2-ASYYY-12-342006- JA & KA Wellhead Platform Material Selection & Corrosion
[5]
0001 Control Report
WHP03-TFM2-ASGDA-12-342001-
[6] GD Platform Material Selection Report
0001
WHP03-TFM2-ASFAA-12-342002-
[7] FA Platform Material Selection Report
0001
WHP03-TFM2-ASYYY-06-342022-
Published in iPDF on 09/07/2020
Page 6 of 21
Block 5 - AL SHAHEEN FIELD Development
WHP03-TFM2-ASGEA-83-200001-
[11] GE Process Platform Line list
0001
WHP03-TFM2-ASGAA-83-202001-
[12] GA Platform Batch 3 Line list
0001
WHP03-TFM2-ASGDA-83-202001-
[13] GD Platform Batch 3 Line List
0001
WHP03-TFM2-ASFAA-83-202001-
[14] FA Platform Process Line List
0001
WHP03-TFM2-ASJAA-00-200001-
[15] JA Wellhead Platform Master Equipment List
0001
WHP03-TFM2-ASKAA-00-200001-
[16] KA Wellhead Platform Master Equipment List
0001
WHP03-TFM2-ASGEA-00-200001-
[17] GE Process Platform Master Equipment List
0001
WHP03-TFM2-ASYYY-11-262008-
[18] GE, JA and KA Platforms HVAC Design Basis
0001
WHP03-TFM2-ASYYY-16-260001-
[19] GE, JA and KA Platforms Architectural Design Basis
0001
WHP03-TFM2-ASYYY-16-392002-
[20] GE, JA and KA Platforms Architectural Specification
0001
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 7 of 21
Block 5 - AL SHAHEEN FIELD Development
[33] ASTM C547 Standard Specification for Mineral Fiber Pipe Insulation
Standard Specification for Unfaced Preformed Rigid Cellular
[34] ASTM C591
Polyisocyanurate Thermal Insulation
Standard Specification for Mineral Fiber Blanket Insulation and
[35] ASTM C592 Blanket-Type Pipe Insulation (Metal-Mesh Covered) (Industrial
Type)
Standard Specification for High-Temperature Fiber Blanket
[36] ASTM C892
Thermal Insulation
Standard Practice for Handling, Transporting, Shipping, Storage,
[37] ASTM C929 Receiving, and Application of Thermal Insulation Materials for
Use in Contact with Austenitic Stainless Steel
Standard Test Methods for Density and Specific Gravity (Relative
[38] ASTM D792
Density) of Plastics by Displacement
Standard Test Method for Compressive Properties of Rigid
[39] ASTM D1621
Cellular Plastics
Standard Test Method for Apparent Density of Rigid Cellular
[40] ASTM D1622
Plastics
Standard Test Method for Tensile and Tensile Adhesion
[41] ASTM D1623
Properties of Rigid Cellular Plastics
Standard Test Method for Water Absorption of Rigid Cellular
[42] ASTM D2842
Plastics
Standard Test Method for Open Cell Content of Rigid Cellular
[43] ASTM D6226
Plastics
Thermal insulation for Building Equipment and Industrial
[44] ISO 12241
Installation - Calculation Rules
5.1. DEFINITIONS
For the purpose of this document, the words and expressions listed below shall have the meaning assigned to them as
follows:
Definitions Description
realisation of the PLANT under another contract with COMPANY, together with his
subcontractors/vendors at any level
shall Indicate that requirements strictly to be followed in order to conform to the document
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 8 of 21
Block 5 - AL SHAHEEN FIELD Development
Definitions Description
should Indicate that among several possibilities, one is recommended as particularly suitable,
without mentioning or excluding others, or that a certain course of action is preferred
but not necessarily required
5.2. ABBREVIATIONS
For the purpose of this document, the abbreviations listed below shall have the meaning assigned to them as follows:
Abbreviations Description
6. ORDER OF PRECEDENCE
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 9 of 21
Block 5 - AL SHAHEEN FIELD Development
Note: For operating temperature range from 70 oC to 150 oC, thermal insulation materials shall not be used for personnel
protection, only metallic guards or ceramic blend insulating composite coating shall be used. For surface temperature
higher than 150°C, insulation shall be used for personnel protection.
Modify section
Piping and equipment shall be insulated according to the insulation class, operating temperature and insulation thickness
defined in P&ID, line lists, and datasheets or construction drawings.
Insulation thickness shall be calculated in accordance with ISO 12241. Insulation thicknesses are given in Appendix 4 and
shall be verified based on final selected products and adjusted up to closest standard thickness given by the manufacturer.
Appendices
Modify Appendix 3
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 10 of 21
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 11 of 21
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 12 of 21
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 13 of 21
Block 5 - AL SHAHEEN FIELD Development
Add Appendix 4
Insulation thicknesses included in this section are based on type of insulation specified in P&ID and will be updated if new
insulation code is included.
Insulation System:
- System 1 (Cellular Glass – single layer + GRP): up to 120 0C
- System 2 (Cellular Glass – single or multi-layer + GRP): above 120 oC up to 430 oC
Design Conditions:
1/4 13.7 25 25 25 30 40 50
1/2 21.3 25 25 25 30 50 60
3/4 26.7 25 25 25 40 50 60
1 33.4 25 25 30 40 50 60
3/2 48.3 25 25 30 40 50 70
2 60.3 25 25 30 40 60 70
3 88.9 25 30 40 40 60 80
4 114.3 25 30 40 50 60 80
6 168.3 25 30 40 50 70 90
8 219.1 25 30 40 50 70 90
10 273 25 30 40 50 70 90
Published in iPDF on 09/07/2020
12 323.9 25 30 40 50 70 90
14 355.6 25 30 40 50 70 100
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 14 of 21
Block 5 - AL SHAHEEN FIELD Development
16 406.4 25 30 40 50 70 100
18 457 25 30 40 50 80 100
20 508 25 30 40 50 80 100
24 610 25 30 40 50 80 100
32 813 25 30 40 60 80 100
34 864 25 40 40 60 80 110
System 1 System 2
Insulation System:
- System 4 (Ceramic Blend Insulating Composite Coating) / System 5 (Stainless Steel Welded Mesh): from 70 oC up to
150 0C
- System 2 (Cellular Glass – single or multi-layer + GRP): above 150 oC up to 430 oC
Design Conditions:
1/4 13.7 30 25 25 25 30 40 40
Published in iPDF on 09/07/2020
1/2 21.3 30 25 25 25 30 40 40
3/4 26.7 30 25 25 25 30 40 50
1 33.4 30 25 25 25 40 40 50
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 15 of 21
Block 5 - AL SHAHEEN FIELD Development
401 oC
151 oC 201oC 251 oC 301 oC 351 oC
Nominal 70 oC to to
OD (mm) to to to to to
(NPS) 150 oC 430 oC
200oC 250 oC 300 oC 350 oC 400 oC
3/2 48.3 30 25 25 30 40 50 50
2 60.3 30 25 25 30 40 50 60
3 88.9 50 25 25 30 40 50 60
4 114.3 50 25 25 40 50 60 60
6 168.3 50 25 25 40 50 60 70
8 219.1 50 25 30 40 50 60 70
10 273 50 25 30 40 50 60 70
12 323.9 50 25 30 40 50 70 80
14 355.6 50 25 30 40 50 70 80
16 406.4 50 25 30 40 50 70 80
18 457 50 25 30 40 60 70 80
20 508 50 25 30 40 60 70 80
24 610 50 25 30 40 60 70 80
System 5
(1) (2) System 2
25 25
30 30
40 40
Published in iPDF on 09/07/2020
50 50
60 60
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 16 of 21
Block 5 - AL SHAHEEN FIELD Development
70 70
80 40/40
90 40/50
100 50/50
110 50/60
120 60/60
Note:
1. Care shall be taken to not exceed the maximum weight allowed to be carried by each worker.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 17 of 21
Block 5 - AL SHAHEEN FIELD Development
Modify section
Piping and equipment shall be insulated according to the insulation class, operating temperature and insulation thickness
defined in P&ID, line lists, and datasheets or construction drawings.
Insulation thickness shall be calculated in accordance with ISO 12241. Insulation thicknesses are given in Appendix 4 and
shall be verified based on final selected products and adjusted up to closest standard thickness given by the manufacturer.
Appendices
Modify Appendix 3
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 18 of 21
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 19 of 21
Block 5 - AL SHAHEEN FIELD Development
Add Appendix 4
Insulation thicknesses included in this section are based on type of insulation specified in P&ID and will be updated if new
insulation code is included.
Insulation System:
- System 20: operating temperature -50 oC to ambient: Cellular Glass (single or double layer) + GRP
Design Conditions:
1/4 13.7 25 40
1/2 21.3 25 40
3/4 26.7 30 50
1 33.4 30 50
3/2 48.3 30 50
2 60.3 40 50
3 88.9 40 60
4 114.3 40 60
6 168.3 40 70
8 219.1 40 70
10 273 40 70
12 323.9 40 70
Published in iPDF on 09/07/2020
14 355.6 40 70
16 406.4 40 70
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 20 of 21
Block 5 - AL SHAHEEN FIELD Development
18 457 40 70
20 508 40 70
24 610 40 80
System 20
25 25
30 30
40 40
50 50
60 60
70 70
80 40/40
Note:
1. Care shall be taken to not exceed the maximum weight allowed to be carried by each worker. Published in iPDF on 09/07/2020
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version
Page 21 of 21