PDO LOGO 01
ABBREVIATIONS..............................................................................................................................................3
1. INTRODUCTION...................................................................................................................................4
2. STUDY OBJECTIVE.............................................................................................................................4
4. METHODOLOGY.................................................................................................................................5
5. HYDRAULIC MODEL...........................................................................................................................5
6. HYDRAULIC RESULTS.......................................................................................................................9
ABBREVIATIONS
9 INTRODUCTION
Kauther cluster comprises of two sets of reservoirs, Fakhr and Kauther. It is proposed to tie-in
Fakhr-9(A3) HPG Well to KGP network.
9 STUDY OBJECTIVE
The objective of this report is to carry out hydraulic calculation using PIPESIM to identify
suitable size for Fakhr-9(A3) HPG Well flowlines with respect to pressure drop and erosion
velocity criteria. During hydraulic study suitability of 8” flowline is verified based on availability.
As Fakhr-9(A3) HPG Well is falling under Fakhr area, it is proposed to connect these wells to RMS-3
(Fakhr RMS) in KGP network.
Refer
attachment
Fakhr-9(A3) Kauther RMS-3 2953 m 3544 m -2
Note: Fakhr-9(A3) shall be connected to extended part of Kauther RMS-3. Refer attachment-3.
Page 5 of 11
DOC. NO: KGP-61-101983-PX-4603-0000X-0000
Galfar Engineering & Contracting SAOG FAKHR-9(A3) HPG Well Hydraulic Calculation Report
9 METHODOLOGY
Fakhr-9(A3) HPG well coordinates provided in the Flowline and Well Hook-Up
Authorization (Refer Attachment-1) are plotted on Kauther area topological map and
flowlines are plotted to Kauther RMS-3.
20% margin is considered over length.
No margin is considered on flow rate.
Exiting PIPESIM model is utilized for the present hydraulic study.
Hydraulic has been performed for both the tie-in options.
Back pressure at the wellhead is compared with FTHP and maximum fluid mean velocity
is compared with maximum erosional velocity.
9 HYDRAULIC MODEL
.1 PIPESIM Model
Model Selection
PIPESIM (v. 2009.1) software is used to perform the hydraulic study.
Model selection
Simulation Type : Network model
Fluid Type : Composition
Equation of state : Peng-Robinson
Heat transfer mode : Calculate U value
Equations used
Flow correlation (Horizontal / Vertical)
Multiphase flow correlation: Shell Flow Correlations (Version 2006.1)/SHELL 2-PHASE
.2 Piping Details
Design conditions
Flowline/Pipeline routing : Buried
Fluid category : Category D (SP-1211)
Pipeline class : Class 1
Flowline length : Refer Section-3
Burial depth : 0.8 m
Flowline size : 8”
Wall thickness & ID : 5.6 & 207.88 mm (8” flowline)
Design pressure : 12,000 kPa(g)
Design Temperature : 130 °C
Design code : ASME B31.8
ANSI Class : 900#
Roughness : 0.05 mm
Corrosion allowance : Nil
Flowline material : ISO 3183-3 L360 (DSS)
Coating internal : Nil
Coating external : Polypropylene
Ambient temperature (Ref SP1134) : 50 ºC (A/G), 30 ºC (B/G)
Sour Service : Sweet service (<50 ppm H2S)
Flow line material conductivity : SS-15 W/m/k
Thermal conductivity of coating : 0.35 W/m/k
Ground conductivity : 0.60 W/m/k
Page 7 of 11
DOC. NO: KGP-61-101983-PX-4603-0000X-0000
Galfar Engineering & Contracting SAOG FAKHR-9(A3) HPG Well Hydraulic Calculation Report
.4 Fluid Composition
Existing Kauther PIPESIM model is already having Fakhr field fluid composition. The fluid
composition is as follows.
Gas flow rates and landing pressures are considered as shown in the following table.
Page 8 of 11
DOC. NO: KGP-61-101983-PX-4603-0000X-0000
Galfar Engineering & Contracting SAOG FAKHR-9(A3) HPG Well Hydraulic Calculation Report
9 HYDRAULIC RESULTS
8” flowline is hydraulically suitable for Fakhr-9(A3) since back pressure is less than FTHP and
maximum mean velocity is less than maximum erosion velocity. Hence, 8” flowline is
recommended for Fakhr-9(A3).
Page 11 of 11
DOC. NO: KGP-61-101983-PX-4603-0000X-0001
Galfar Engineering & Contracting SAOG Fakhr-9 (A3) HPG Wells Hydraulic Calculation Report
Fakhr-9(A3):