You are on page 1of 22

22112

DivisionBllNo.G/BBCIAPARTI NOP/Roads/NLOT o
t.
S-Division Blill No. G/BBC/SD-I/APART/NL-7/2020-21/IPC-1/36 Dt.13/04/2021
Chief Engineer, (EAP), ARR& TI Complex, PWRD, Assam, Guwahati
APART WORKs cOMPONENT
Name of Work: Construction of road from Moranjan to Pagladiya embankment of 3 no Balitara village Paschim Banbhag
Mouza in Nalbari District. Assam
Name ofContractor:Prabir KALITA
Contract Agreement No. CEJAPART/40/2020/16 Dated: 05/01/2021
Package no.: APARTINOCP/ ROADS/NL-07
Date of order to commence of work: 05/01/2021
Date of completion of work: Work in Progress
Initail contract price: Rs. 73,82,447.00
Revised contract price: Nil
INTERIN PAYMENT CERTIFICATENo.1
Period :Upto
SI Brief Description of ltems Total value to date (Rs) Value up to previous IPC (Rs)| Value of this IPC (Rs)
No
5-3-4)
Value of work as per BoQ (CoC-42). Refer Annex 1 20,24,081.00 0.00 20,24,081.00
Value of non-peishable materialsbroughtto site (CoC-51.4) &SI-3 of 0.00
0.00 0.00
Contract Data. Refer Annex I
c.Value of variation temsexecuted (CoC40)ReferAnnexl 0.00 0.00 0.00

0.00 0.00
Price adjustment (Coc-47) &Contract Data. Refer Annex IV 0.00
(A) Amount Due (excl Advance Payment) 20,24,081.00 0.00 20,24,081.00
e.
Mobilisaton Advance (COC-51) and Si-1ofContractData 0.00 0.00 0.00
Advance (CoC-51) and Sl-2 of Conrract Data 0.00 0.00
Equipment 0.00
(B) Total Advance Payment 0.00 0.00 0.00
(c) Gross Amount Due (incl Advance Payment) 20,24,081.00| 0.00 20,24,081.00
Repayment of Mobilisation Advance as per Contract Data (15% of 0.00 0.00 0.00
Amount (A)
Retention@6% ofAmount (A) up to max 5% of final contractprice 21445 00
Other (Specifty) FR (W.L)

(D) Total Deduction/Recoveries 12144500


(E) Amount due taxes ( C)-(D)
) Income tax (TDC)@ 0.75% on (C )-9) 20241 O0
k. i) Cess Act-1996 @ 1% 2024 0o0
L (Giv) CGST@ 1% 20 24f OU
M. )SGST@ 1% 20 241'00
N. Forest Royalty FR 222352 + I1143 CU(Meno) 2 33995 C0
O. . TAX on F.R 1.875% 557 5653 O
Total Taxes 3 20 642
'

a.Net Amountdue (E)- (P) 1S8t 994 co

(Conmaet0Y Assiscant Executive Engineer, PWRD


ahintra Bridge Constn. Sub-Division-II
Guwahati-25

Executive 1
Ac
Braha 1uiia
Divisivu, Úiiiuit
E 22!

N N

E 8 8 8 88 8
APART PWRD, Assam

I -CERTIFICATEs &SIGNATURE
1. The measurement on which are based the entries in columns 4 to 9 of IPC - 1

Account were made by Madhurya Haloi and are recorded at page/s

01to 06 (Abstract) of Measurement Book No./s 160(Abstract)&161

*2. Certified that in addition to quarter part from the quantities of work actually executed
connection with
as shown in column 7 of account I, some work has actually been done in
several items and the value of such work (after deducting there from the proportionate
amount of secured advance, if any ultimately recoverable on account of the quantities of
materials used therein) is in no case less than the advance payments as per column 3, of
Account II made or proposed to be made for the convenience of the contractor, in

of and the results of detailed measurement will be made as soon as


anticipation subject to
possible.

*3. Certified
Account II above have
(1) That the plus quantities of materials shown in column 3 of has
the not
actually been brought by the contractor to the site of work and
contractor

previously received any advance on their security.


all required by the contractor
(2) Those materials are of an imperishable nature and are
for use on the work in connection with item 5 for which rates for furnished worked have

been worked upon.


by the contractor in accordance with
(3) That a formal agreement, signed and executed
paragraph 275 (a) of the public work Department Code, is recorded in the Divisional
Office.
Brahmaant
Exe 14A

Erecrtie
T.D.
Assistant Executive Engineer, PWRD RSt.
Junior Engineer, PVVRD
Brahmaputra Bridge Constn.Sub-Division-II Erahnn
Brahmaputra Bridae Consin Sub-Dwision-ll Asst. Eeeattve Engineer as Engineer PWRD
Jutfor EAgineer

Date: Date: Date

Rank Rank Rank

*Signature of officer Sub-divisional Divisional


Signature of Contractor
Authorizing Payment
Date: Date: Date: Date:
Note:
These certificates must be signed by an officer of or above the rank of Sub-divisional Office.
This signature is necessary only when the officer who prepares the bill is not the officer who
authorized the payment. In such case two signatures are essential.
GOVERMENT OF ASSAM
OFFICE OF THE EXECUTIVE ENGINEER PWD
(R)
NAGAON, BARHAMPUR & RUPOHIHAT
TERRITORIAL ROAD DIVISION, NAGAON
NO3338
To, pated 22.3.2021
M/S INDRAJIT ENTERPRISE
Vill-DIHING SATRA
PO-NORTH GUWAHATI
DIST-KAMRUP(M)ASSAM.
Sub:- Certificate of Completion of Work

Ref:- Renovation of official Building of DICC and Commerce Centre in Nagaon District.

Dear Sir,
With reference to the subject above, this is our issuance of the Completion Certificate of the work as
mentioned above, as per Contract Clause 55 & Sub-Clause 55.1. It is hereby agreed that the work of this
Contract as mentioned above, has been completed to a satisfactory standard and hence the issuance of this
completion certificate is accorded following a joint inspection of the work conducted on 01/11/2020.

Name ofthe personal presentduring Inspection:


Clients Representative Execution Representative Contractor Representative

Hiten Kalita, Ececutive M/S Indrajit Enterprise


General Manager Engineer PWRD Nagaon, PROPRIETOR
DICC Nagaon,Assam Barhampur and Rupohihat INDRAJIT BHUYAN
Territorial Road Division
Atanu Sarma Asst Executive
Engineer PWRD Nagaon
Territorial Road Sub-Division
Heen Sarma Assistant
Engineer, PWRD Nagaon
Territorial Road Sub-Division

Pursing clause 35.1 wehereby notify that the defects to be rectified are required to be completed by
you expenditiously during the defect liability period.
The defect liability period has commence on 01/11/2020 and will expire on 31/10/2021 Further you

drawing and/or operation and


to submit AS BUILT
maintenance manuals within 28days
are also requested
from the date of issue of this completion certificate.

Details of the Package are mentioned below:


ContractAgreement No.&Date No. CE/APART/130/2019/13 Dt.01/11/2019
Transformation
Project Name Assam Agribusiness and Rural
Project(APART)
Employer Chief Engineer PWD(EAP)
Name of Contractor M/S INDRAJIT ENTERPRISE
5 Contract Package No. (APART/NOCP/DICC/NGN-01)
Renovation of official Building of DICC and Commerce
6 Contract Description
Centre in Nagaon District.
Original Contract Amount
8 Revised Contract Amount
Rs.27,14,572/
9 Rs.27,14,572/
Stipulated date of Completion 30/04/2020
10 Extended date of Completion 1-11-2020
11 Actual date of Completion 1-11-2020
12 Defect liability period
360 days
13 Date of end of defect
liability period 30-10-2021
14 Inclusions /Execution in this completion N/A

Executive Engineer PWRD


Nagaon Barhampur and Rupohihat
Territorial Road Division, Nagaon

Memo No.
Copy to:

1.The Chief Engineer, PWD (EAP) Cum Project Director World Bank Aided Project Assam, Fatasil Ambari,Guwahati-25
2.The General Manager, DICC,Nagaon Assam.

Executive Engineer PWRD


Nagaon Barhampur and Rupohihat
Territorial Road Division,Nagaon
To Whom It May Concern:

It is to certified that, Construction of road from Moranjan to Pagladiya embankment of 3


no Balitara village Paschim Banbhag Mouza in Nalbari District. Assam Package no.:
APARTINOCP/ ROADS/NL-07 Assam under APART have been done as per MOST
Specification, It is also certified that the required quality control tests have been
conducted at time of execution as per required norms which have been enclosed with
this bill.

TB14A

Assistant Executive Engineer, PWRD


Executiv agr, P. W.D.
Junior Engineer, PWRD
Rrahmapyeta Bridge Constn. Sub-Division-II
Bra i2tipi idlge Const1.
Brahmaputra Bridge Constn. Sub-Division-ll . Giuwahati.
Guwahati-25 Guwahati-25
TECHNICAL OBSERVATION SHEET

1. Package No APART/NOCP/RoADS/NL-09
2. Name of Work :Comr ncli on Rsadom Morayan to: aplakiya
lyeuskon eut >3nomlitava Vtlape PalAin
n h o e leA in Nelberi disht,Asce
3. Divisional Bill No. & Date:
4. Name of Contractor. Sri habiy kalit
5. Contract Agreement No: eE/APART/40/20ro/6 os/o1/20 4
6. Time:- (a) Date of Commencement e/20-
(b) Date of Completion - Works in progress
7. Contract Amount Ks 73,8244
8. Bill Value
9. Utlized Quantity of Forest Materials
Material Cumulative Quantity (Cum)

Sand

Stone/GraveB 142
Earth
4817.94
Timber

10. Comment

Assistant Engineer
División Brahia
Construction

P W D
Bridge
( R O 0 ) ,G u w a h a t i - 2 5

Brahmaputra

CALCULATION OF FOREST MATERIALS


MATERLAL CONSUMPTION CUM FOREST
RQVALTY RECO0VERY STA rEMPNT
Package No. APART/NoP/RoADs/NL-Oo}
Bill No:
me 9ok Cpwaui n Contractor Name
Road em ierros t
BOQ
No.
Description of
BOQ Ltem Unit Executed Qty
Earth Srone Sand Pplademauknef
Timber 2ao
Rate Utilized
ionsnpUuilized
FR per
Oty Rate on Rate Uulized| Urilized upto dau FR Net FR
e r cum
per cum Qty
Cum Qty Qty Cum (Rs.)|FR (Rs) deposited Payable
Ear
crk 44:9r|20 489
26s 870 S 28 I42

Total

arh 4819.94

Assistant Engineer Division

Construction
5
dge
rahmaputr

PWD (R
APART WORKS COMPONENT

Chief Engineer, (EAP), ARR & TI Complex, PWRD, Assam, Guwahati

Name of Work: Construetion of road from Moranjan to Pagladiya embankment of 3 no Balitara village Pascim Banbhag Mouza in Nalbari District. Assam

Package no.: APARTINOCP/ ROADS/NL-07

A) Contract Agreement No- CE/APART/40/2020/16 Dated: 05/01/2021

B) Contract Price:- 73,82,447.00


C) Revised contract price: Ni

ABSTRACT OF PRICE UP TO THIS BILL

AS PER BOQ (Aproved variation) QUANTITY EXECUTED VALUE OF WORKDONE (Rs)

Upto /% Progress Remarks


Brief Description of Item Upto Previous as
NO Cumulative Previous as his Bill Cumulative This Bill
Quantity Rate (Rs.) Amount IPC
IPC

Setting Out
Unit- 1KM
Reference Bench Mark and Bench Mark
pillar as per MORD and Technical
each 1.000 10000.00 10000.00 1.00 0.00 1.00 10000.00 0.00 10000.00 100.00%|
|Specitications Clause No.- 100

typical benchmark as per drawing 200.


Clearing and Grubbing Road Land
(Clearing and grubbing road land|
Including uprooling rank vegetation,
grass, bushes, shrubs, saplings and trees
girth up o 300 mm, removal of stumps
of trees cut carlier and disposal of
,unserviceable malerials and stacking of 40000.00 17520.00 0.4290 0.00 0.429 17160.00 0.000 17160.00 97.95%
0.438
serviceable materials to beused or
auctioned up to lead of 1000metres
including removal and disposal of top
organic soil not exceeding 150mm|
thickness.
By Manual Means
In area of non thorny jungle
NAME OF WORK: COSTRUCTION OP ROAD FROM BONGSHIGAON To BONGSHIGAON H.S.
IN KOKRAJHAR DISTRICT
PACKAGE NO. :
APART-NOCP- ROADS-KOK-01
BEFORE EXECUTION OF THE WORK APTER EXECUTION OF THE WORK
OK.M
Latitude 26.470568
Lattude: 26.470556 Longtude 90.185646
Longitude:90.185721 Elevalon: 57.18m
ACCuracy 4.3m
Elevation. 56.32m
Accuracy: 3.2m Tme. 21-06-2020 1448
Time: 27-07-2019 18:21
Note. 00.00 m Pgweredby Noteam
00.00 K.M. 00.00 K.M.
BEPORE EXECUTION OF THE WORK AFTER EXECUTION OF THE WORK
Latitude: 26.471403 Latitude 26.472347
Longitude: 90.185666
Longitude: 90.185729
Elevation 46.8m Elevation: J./m
Accuracy 5.4m Accuracy: 3 2m
Time 27-07-2019 18:24 Time. 21062020 1042
Powered by Notecam Note:200 m Pomecredby NereCan
Note Bongshigaon2
200.00 METRE 200.00 METRE
Jaga Mohar Baeiay
a l 2 2
Execawe ingeer, PW
Rome vn.
A s Exe ti Enginee WD Kokrajna RM
KOKralna Rurs Roaas Surv
NAME OP WORK: CONSTRUCTION OF ROAD FROM BONGSHIGAON To BONGSHIGAON H.S.
IN KOKRAJHAR DISTRICT
PACKAGE NO. :
APART-NOCP -ROADS-KOK-01
BEFORE EXECUTION OF THE WORK
AFTER EXECUTION OF THE WORK
Latitude: 26.474252 Latude. 26.474247
Longitude. 90.185733 Longitude: 90 185702
Elevation: 47 58m Bevation: 47.72m
Accuracy 54m AcCuracy. 3.2m
Time: 27-07-2019 18.12 Time:21-06-2020 1044
Note Bongshigaon12 Note 400 m Powered by NoteCam
400.00 METRE 400.0 METRE
BEFORE EXECUTION OF THE WORK APTER EXECUTION OF THE WORK
Latitude: 26 475528 Latitude 26.476023
Longitude. 90.18574 Longtude 90 185714
tlevation su 95m
Elevation 4/ 22m
Accuracy: 3.2m ACCuracy 3 2m
Tume 21-06 2020 1524
Time.27-07-2019 1810
Note. Bongshigaon9
Note: 600 00 m Powesed by NoteCam
600.00 METRE 600.00 METRE
Jaga Mondn Basumetary
Executive Engineer, PWD
Eng1nee w
Diva.
Rural Roede
A s t Execut Kokrajhar
KoKraina Rural Roas S
NAME OF wORK: cONsTRUCTION OF ROAD FROM BONGSHIGAON To BONGSHIGAON H.S.
IN KOKRAJHAR DISTRICT
PACRAGE NO. : APART-NOCP-ROADs-KOK- 01
BEFORE EXECUTION OF THE WORK APTER EXECUTION OP THE WORK
Latitude. 26 47835 Latude 26 477855
Longitude 90 185916 Longitude. 90 18523
Elevation. 49.07m Elevation: 52.21m
Accuracy 3.2m Accuracy 3.2m
ime 27-07-2019 18:06 Time: 21-6-2020 16 10
Rpviered bý.NoeCam Powend by NoteCam
Nore Pongshgacns
800.00 METRE 800.00 METRE
BEFORE EXECUTION OF THE WORK AFTER EXECUTION OF THE WORK
1K.M.
Latiiude 26 479201 Lattude 26479503
Longitude 90 186297 LOngntude 90 18649
Elevation: 47 69m Elevalion. 3b6 Im
ACcuracy 3 2m Accuracy 3.2m
Tome 27-072019 18 05 Tume.21-06-2020 1639
Note. Bongshigaon3 Note 1.00 km PowaadtaMjeCam
01.00 K.M. 01.00 K.M.
Jaga Motan Basumatary
Execuuve Enginees, PWD
WL Kekrajher Rurel Roads Diva
Eng1nee
Ast Execut
Koxralha Rurat Roaae
Su.
GOVT OF ASSAM
PWRD

Name of Work: Construction of Road from Nalbari to Batabari Road in Kokrajhar


District, Assam under World Bank Funded APART for the year 2018
19

AS BUILT DRAWING

Package No APART/N0CP/ROAD/KOK-02
F.W.O.No. CE/APART/145/2019/10 DT. 21/08/2019
NAME OF CONTRACTOR: Marjit Basumatary

OFFICE OF THE EXECUTIVE ENGINEER,PWD


KOKRAJHAR RURAL R0ADS DIVISION, KOKRAJH.

PWDGOVT OF ASSAMS
HAREAABITATION
HABAREAITAT HABITATION
ARE

SM) EXILVER r (SM


CH STI690.NG00MBOX

HABITATION AREA . SM) CH 690.00M


ExiSTING BOX
EXISTING BOX
SM) CH.VERT690.00M
(SM X
ASC
(CH.IMXI570.M00MLVER
.

SMM) CULVIEXICHSTIRT690.NG0(S0MBOX
(SM X

HABIAREATATION
MXIART
NooOS H

OSV
2018-19
Batabari Road in Kokrajhar District, Assam under World Bank Funded APART for the year
Name of Work Construction of Road from Nalbari to

INTERLOCKING CC BLOCKS
80MM THICK
- SAND BED 30MM THICK

- WBM I1- 75MM THICK

EDGE BLOCK
300MM(175MM - 150MM)-
ALL DIMENSIONS ARE IN MM WBM -II 75MM THICK
GSB GR-I1 100MM THICK
EW IN SHOULDER DL 100MM THICK
25% 2.5%-

1.5
Slope
EWIN
EWIN 5000 CORE
CORE

6000
7080
7380

Fig.: TYPICAL CROSS SECTION

su EXECUTYNEREN, PWD
KokkPKK DVISION
aFotADAD AGEREavTIEEFINFEBWD Di¥n.
JUNIOUR ENGINEER, PWD
KOKRAJHAR RR DIVIsiON KgURRASRURaRRdaHsB-DIVI`ITÖN
Sur.ivn
Name of Work: Construction
of Road from Nalbari to Batabari Road in Kokrajhar District, Assam under World Bank Funded APART for the year 2018-19

NOTES
1. ALL DIMENSIONS ARE IN MILIMETERS 1350
T75
175
ti50
ROADWAY
175
B

100
1000
40

GL GL
I75
A
PLAN-DEEP CULVERT 175
NOT TO SCALE
TOO0
DETAIL OF A
1500 NOT TO SCALE
SECTIONATC - C

NOT TO SCALE

PARAPET WALL

WINGS WALL

O00 1500
4050

115 125

/500-

GL
GL

15OMM PCC

CURTAN WALL 150MM PCc


LONGITUDINAL SECTION -DEEP CULVERT
END ELEVATION
NOT TO SCALE
NOT TO SCALE

Jaga ionan Basumatary


Execut&EGJIHIHERNGINEER, PWD
JUNIOR ENGINEER, PWD ASSA$SEXEbraeuVE ENGINEERRYD KOKBAHJaR RRDAOIRONVNOKRAJHAR
KOKRAJHAR RR DIVISION KOKaALRR RBanPSURY
Assam under World Bank Funded APART for the year 2018-19
Name of Work: Construction of Road from Nalbari to Batabari Road in Kokrajhar District,
M
CROSS SECTION AT CH 0.000
NOT TO SCALE

6000
4050
3750

GL
GL

58.393 58.480 58.393


RL ON ICBP 58.313
RL ON WBM II1_ 58.313 58.400
58.238 58.325 58.238
RL ON WBM II_ 58.250 .163
RLON GSSB 58.163
58.021 58.373 58.063 58.150 .063 58.373 58.021
RL ON SHOULDER 58.150 58.063 58.043 58.021
RL ON DL |58.021 58.043 58.063
57.963 58.050 57.963 57.943 7.921 57.811 57.861
RL ON CORE 57.861 57.811 57.921 57.943 57.943 57.921 |57.811|57.861
57.861 57.811 57.921 57.943 57.963 58.050 57.963
RL ON INITIAL_ 1.875 0.000 1.875 3.000 3.540 3.6906.000
DISTANCE IN M 6.0003.690 3.540 3.000

Jaga Monan 3dsumatary


man U Y g i n e n v E R , PWD
OOKRATAAR IGK BvastON
JUNIOUR ENGINEER, PWD ASSTLX£cEnacumsyERVIRR PWD
KOKRAJHAR RR DIVISION KORAIIDARRRSR-RAYSONWL
for the year 2018-19
APART
Assam under World Bank Funded
Batabari Road in Kokrajhar District,
of Road from Nalbari
to
Construction
Name of Work
200.000 M
CH.=
CROSS SECTION AT NOT TO SCALE

6000
4050
3750

GL

58.280 58.193
.193
RL ON ICBP 58.200 58.113
.113 58.038
RL ON WBM III 58.038 58.125
57.963
RL ON WBM II 7.963 58.050 57.771 57.441
57.950 57.863
RL ON GSB 57.441 57.771| 863 57.863 57.441 57.441
RL ON SHOULDER 57.441 57.441 57.863 57.950 57.341 57.341 57.231 57.281
57.763
RL ON DL 57.763 57.850 57.341 57.341 57.231 57.281
RL ON CORE 57.281 57.231 57.341 |57.341 57.763 57.850 57.763
3.540 3.690 6.000
RL ON INITIAL 57.281 57.231 57.341 57.341 1.875 0.000 1.875 3.000
6.000| 3.690|3.540 3.000
DISTANCE IN M

JAga idohan &sunataryy


EXEOUEIEhgbiNGiiWR, PWD

Arst Executire Engineer W KorgoK&AJMARRR DAISION


AS$INaEERUFVRENGISEFRRWD
JUNIOUR ENGINEER, PWD KOKRAJHAR RR SUB-DIVISIONN
KOKRAJHAR RR DIVISION
under World Bank Funded APART for the year 2018-19
Name of Work Construction of Road from Nalbari to Batabari Road in Kokrajhar District, Assam

CROSS SECTION AT CH. 1415.000 M


NOT TO SCALE

6000
4050
3750

GL
GL

57.761 57.830 57.761


RLON ICBP 57.681
RL ON WBMII 57.681 57.750
RLON WBM II 57.606 57.675 57.606
57.531 57.600 57.531
RL ON GSSB
RL ON SHOULDER 57.371 57.719| 57.431 57.500 57.431 57.719 57.371
RL ON DL 57.37157.389 57.431 57.500 57.431 57.389 57.371
RL ON CORE 57.211 57.161 57.271 57.289 57.331 57.400 57.331 57.289 57.271 57.161 57.211
RL ON INITIAL | 57.21157.161 57.271 57.289 57.331 57.400 57.331 57.289 5727157.161 57211
DISTANCE IN M 6.000 3.690 3.540 3.000 1.875 0.000 1.875 3.000 3.540 3.690 6.000

Asst Executie Enginoe


WL Jaya Mohan Basumatary
Kuxraiha Rura Roads Sur-nva EXECNTIRitg kiNaINNEBR, PWD
NIOUAOELA
JUNIOUR EXKGNEER, PWD ASSTT. EXECUTIVE ENGINEER, PWD KoArajaKAHARR DVISION
KOKRAJHAR RR DIVISION KOKRAJHAR RR SUB-DIVISION
the year 2018-19
NAME OF WORK Construction of Road from Nalbari to Batabari Road in Kokrajhar District, Assam under World Bank Funded APART for

Datum 555

Formation L
Level

Initial R in

Chainage

----**

Datum =55

Formation
|Level

initial RL

Chainage
LONGITUDINAL SECTION
Indications
Fomation Line

HFL

Ast Executire Engineer PL


Jaa Nanan ENGINER,
EEXEQLUTAME LR, PWDPwD
JUNIOUR ENGNELPWD ASsTT eREoUTVBENGIsSBEROPWD Kokraf@KRNAHABSRYISION
KOKRAJHAR RR SUB-DIVISION KOKRÄJHAR
KOKRAJHAR RR DIVISION
RCC BRIDGE NO
RCC BRIDGECHAINAGE IN (M) 1/3.
CULVERT NO
1/1 1/2 570.00

CULVERT CHAINAGE IN (M) 50 130


ICBP &SHOULDER

WBM-II& SHOULDER

WBM-1 &SHOULDER
GSB SHOULDER
E/W IN EMBANKMENT

400.00450.00450.00 500.00| 550.00 600.00| 650.0o


|Distn. in M
0.00 50.00 100.00 150 200.00 250.00 300.00 350.00

RCC BRIDGE NO
RCC BRIDGECHAINAGE IN (M)
CULVERT NO 1/4
CULVERT CHAINAGE IN (M) 925
ICBP&SHOULDER
WBM-Il1 &SHOULDER
WBM-II&SHOULDER
GSB SHOULDER
E/W IN EMBANKMENT 1150.00 1200.00 1250.00 1300 1350 1415
|Distn. in M 700.00 750.00 800.00 850.00 900.00 950.00 1000.00 1050.00 1100.00
No-APART-NOCP-ROADS-KOK-02
Bataban in District, Package
Kokrajhar
PROJECT: Construction of road from Nalbari to
Chief Engineer,PWRD(EAP),Fatasil Ambari, Assam, Guwahat-25
NAME OF EMPLOYER The
Rural Road Dvision
NAME OF ENGINEER Executive Engineer,PWD,Kokrajhar
BTAD,Assam
NAME OF CONTRACTOR Sri Marjit Basumatary,Gossaigaon Kokrajhar ROAD STRIP PLAN

TITLE SCALE-NOT TO SCALE


CHAINAGE APPROVED BY
CHECKED BY
SUBMITTED BY

Signahuie or Tontractor AsstAsisec ELemEegHASEWL ExecutveEngineer,Pp


Junior Engineer,PWD
Representitve, LuxraithahRUREil Rcaae-SMSön
For Marit Basumatary Kokrajhar Rural Road DISIon
GOVT. OF ASSAM
OFFICE OF THE GENERAL
MANAGER,
DISTRICT INDUSTRIES & COMMERCE
CENTRE NALBARI

No NDIC/G806/2019//33 Dated 02/02/2021

OCCUPANCY CERT!FICATE
This is to certify that Sri Nava Kanta
based work "Renovation of Official
Talukdar, Contractor has completed the need
the Nalbari District
Building of District Industries& Commerce Centre in
(Package No. APART/NOCP/DICC/NL-01) funded by World Bank as
per plane and estimate.

Now, after completing the work the contractor has handed over the Building/ structure
to the undersigned and the undersigned has taken over the same.

Handed over by Taken over by

Nava Kanta Talukdar (Contractor) General Manager


Vi!! Barkulha:i, P.O-Kaiay District Industries & Commerce Centre
Dist. Nalbari, Assam Nalbari