Professional Documents
Culture Documents
Question 1 Flashing is placed to prevent water infiltration between wall and roof
Correct
Select one:
Mark 1.00 out of
a. False
1.00
b. True
c. Orthographic drawings
d. Isometric drawings
c. Floor plan
d. Interior elevation
Question 5 Each individual lot on the plat map is assigned an identifier, usually
Correct
Select one:
Mark 1.00 out of
a. A number
1.00
b. An Alphabet
c. A & B
b. True
c. Not to scale
d. North to South
b. A & B
c. Symbols
d. Hatching
b. Orthographic Drawings
c. Perspective Drawings
d. Isometric Drawings
b. Cutting-Plane line
c. Break line
d. Hidden line
b. True
Select one:
a. False
b. True
b. True
c. Construction Notes
d. Symbols
Question 17 In contour lines, what is the observation when the lines are placed
Correct
further apart?
b. Gradual slope
c. No slope
d. Steep slope
b. Project coordinators
c. Architects
d. Construction coordinators
Question 20 The grading plan is then officially recorded with the applicable
Not answered
government land registry and becomes the legal description of all the
lots in the subdivision
Marked out of
1.00
Select one:
a. True
b. False
c. Friction piles
d. Bearing piles
c. Help to ensure that the building can get the proper permits
The correct answer is: Help to ensure that the building can get the
proper permits
Question 23 The inspector does not have the right to stop if it is not being
Correct
performed to code or if it is deemed unsafe
b. False
b. True
b. True
Question 26 All site elevations are based on a starting benchmark and are
Correct
calculated using a builder’s crane.
b. True
c. Construction drawing
c. Type of flooring
Question 29 ____________ are commonly used for sketching and for illustrations in
Correct
textbooks
b. Isometric Drawings
c. Orthographic Drawings
d. Oblique Drawings
d. Ministry of environment
Question 31 The site plan is developed from the survey of the property and must
Correct
conform to local zoning requirements
b. False
b. True
b. True
c. Never graded
d. No grading
Question 37 The scale used for producing construction drawings is based on:
Correct
Select one:
Mark 1.00 out of
a. The quality of the photocopy machine
1.00
b. The level of detail required by the drawing
d. A&C
c. Builder
d. Inspector
b. False
b. Dashed line
c. B&C
d. Elevation Drawings