• Two automatically raked bar screens with 25mm bar spacing, both operating as duty in normal
operating condition. One additional screen shall be installed in future stage. Each screen design flow
rate shall be 1,150 l/s so that in future, two screens shall be able to operate for the maximum flow of
2,300 l/s when one is isolated for maintenance. For current stage, in normal condition both screens shall
be operating and one screen shall be able to operate for 1,150 l/s when one is isolated for maintenance.
• Motorised penstocks for screen inlet/outlets, screen channels and wet well.
• All valves, flowmeter, instruments, pipe work and fittings as shown on the drawings.
• Pipe supports required for the piping system. The Contractor shall carry out pipe stress analysis for the
pumping station piping system.
• Compressed air type surge vessels shall be provided. 2 nos. of 40m³ surge vessel shall be provided for
DN1000mm line for the current phase, including the compressor package. The Contractor shall carry
out surge analysis based on the final equipments and shop drawings for pumping station and rising
main. Compressors shall be installed inside the building with all necessary controls.
• An electrically operated travelling (EOT) crane with Safe Working Load (SWL) of 8 Tons. The SWL of the
crane shall be confirmed based on the final selected pumps.
• Two stage odour control system of capacity 23,000 m³/h, with biological filter and activated carbon
filter for the screen chamber, screen building, wet well and air valve chamber.
• Sump pumps the pump room, including all instruments and pipework to the wet well.
• Potable water tank and skid mounted pump sets for building water supply requirements, including the
connection from nearest SEWA supply. Potable water system to shall be used as secondary source for
odour control system irrigation, incase TSE supply is unavailable. The tank and pump skid includes
pressure vessel, stainless steel pipework, level and pressure instruments, control panel, cables for the
continuous automatic operation.
• Service water tank (TSE) and skid mounted pump sets as primary source for odour control system
irrigation, wash water for screen, service hose bibs. The tank and pump skid include pressure vessel,
automatic backwash filters, stainless steel pipework, level and pressure instruments, control panel,
cables etc for the continuous automatic operation.
• 2 nos. of 1000 kVA diesel generator for the current stage and diesel fuel system including 2 nos. of 9,000
Liters diesel fuel tank and fuel supply pumps.
• Hand railing, flooring, walkways and access ladders as required.
• Access covers for the openings in the screen chamber, wet well and valve/flowmeter chambers.
• Air conditioning for the MCC room, administration and operator rooms.
• Ventilation for the transformer, screen building, pump room and toilets.
• Fire fighting for the screen building, pump room, MCC room and transformer room.
• All plumbing and sanitary requirements for the toilets.
• Site drainage for the plot.
1.3 Pumps
1.3.1 General
The Contractor shall provide the pumps as per the performance requirements. The pumps shall be of the dry
installed submersible close-coupled centrifugal type installed in dry well (pump room). The pumps shall be
supplied with suction bends suitable for the suction piping.
The pumps shall be selected in accordance with the requirements of Sharjah Municipality specification and this