TABLE 4.

9 SCHEDULE OF BEAMS FOR ROOF BEAM

DIMENSION
B D REBARS @ REBARS @ SIZE AND SPACING OF
MARK (mm) (mm) SUPPORT MIDSPAN STIRRUPS

Use 10 mm, 1 @ 50mm,


3 – 25 mm top bars 2 – 25 mm top bars 20 @ 100mm, rest @
RB-1 400 500 3 – 25 mm bot.bars 2 – 25 mm bot.bars 220 mm

Use 10 mm, 1 @ 50mm,


2 – 25 mm top bars 2 – 25 mm top bars 10 @ 100mm, rest @
RB-2 400 500 2 – 25 mm bot.bars 2 – 25 mm bot.bars 220 mm

TABLE 4.10 SCHEDULE OF BEAMS FOR TIE BEAM

DIMENSION
B D REBARS @ REBARS @ SIZE AND SPACING OF
MARK (mm) (mm) SUPPORT MIDSPAN STIRRUPS

Use 10 mm, 1 @
3 – 28 mm top bars 3 – 28 mm top bars 50mm, 20 @ 100mm,
TB-1 400 500 3 – 28 mm bot.bars 3 – 28 mm bot.bars rest @ 220 mm

Use 10 mm, 1 @
3 – 28 mm top bars 2 – 28 mm top bars 50mm, 10 @ 100mm,
TB-2 400 500 3– 28 mm bot.bars 2 – 28 mm bot.bars rest @ 220 mm

71
TABLE 4.11 SCHEDULE OF COLUMN FOOTING

DIMENSION FOOTING REINFORCEMENT

LENGTH WIDTH THICKNESS


FOOTING (mm) (mm) (mm) ALONG L (mm) ALONG B (mm)

FC1 2000 2000 350 8-20mm ∅ bars 8-20mm ∅ bars

TABLE 4.12 SCHEDULE OF COLUMNS

  DIMENSION REINFORCEMENTs

MAIN BARS REBARS AND SPACING OF


MARK B (mm) H (mm) (mm) STIRUPS

Use 12 mm, 1 @ 50mm, 13


C1 500 500 8 – 32 mm @ 100mm, rest @ 220 mm

72
73