CONCRETE Table 1-2 CONCRETE PROPORTIO

Mixture
Vol. 3.5 cu.m. Proportion
Class
AA 1:1.5:3
A 1:2:4
B 1:2.5:5
C 1:3:6

Table 2-1 QUANTITY OF CEMENT AND SAND FOR CH


MASONRY MORTAR
Size of CHB
AREA 81 sq.m. Number per sq.m.
in cm.
10x20x40 12.5
CHB 1012.50 pcs
15x20x40 12.5
20x20x40 12.5
SAY 1063 pcs

QUANTITY OF CEMENT AND SAND FOR PLA


Table 2-4
MASONRY PLASTER SQUARE METER AREA
Mixture Cement in Bags/Thickness of Plaste
area 20.05 sq.m. Class 8mm 12mm
A 2.8872 4.3308
B 1.9248 2.8872
C 1.4436 2.1654
D 1.203 1.8045
Sand 0.1604 0.2406

RIPRAP QUANTITY OF CEMENT AND SAND FOR


Table 2-12
Volume 1 cu.m. PLASTER PER SQUARE METER AREA
Cement in Bags
Stone Class Grout Mixture
A B
A 2.574 1.716
B 2.448 1.62
C 2.232 1.488
D 1.944 1.296

COLUMN TIES NUMBER OF LATERAL TIES IN ONE STEEL B


Table 3-8
LENGTH 140 M LENGTH OF COL
NO. OF No. of Lat. L of ties
20 Lat. Ties
LAT TIES ties per w/ hook &
Spacing
M.ht bend
15 938 60
70
20 721 80
85
25 578.2 90
95
30 480.2 100
105
35 420 110
115
40 369.6 120
125
45 330.4 130
135
50 299.6 140
145
55 274.4 150
160
60 253.4 170
180
190
200

SLAB QUANTITY OF RSB IN A ONE-WAY


Table 3-10
AREA 37.44 sq.m. REINFORCED CONCRETE SLAB
Number of RSB per sq.m.
Bar Sp cm.
6m 7.5m
10 140.92416 109.96128
12.5 114.64128 89.14464
15 96.74496 75.02976
17.5 83.56608 64.62144
20 74.1312 57.20832
22.5 66.86784 51.25536
25 60.91488 46.8

TIE WIRE IN A ONE-WAY REINFORCED CO


Table 3-11
ME
Length of
Bar Splicing
6m
in cm.
0.3 0.4
10 17.74656 23.66208
12.5 11.83104 15.79968
15 8.53632 11.34432
17.5 6.28992 8.38656
20 4.94208 6.552
22.5 4.1184 5.50368
25 3.33216 4.41792

CEILING NUMBER OF BOARD FOOT OF STUDS AND


Table 4-3
AREA 644 sq.m. JOIST PER SQUARE METER
Lumber size Center to Center (cm)
(in.) 30x30 30x60
PLYWOOD 1x2 2642.332 2026.668
AREA 644 sq.m. 2x2 5279.512 4052.692
No. 223.61111 pcs 2x3 7910.896 6079.36
2x4 10570.616 8109.248

BOARD FOOT OF WOOD FRAME FOR


Table 5-1
COLUMN AND BEAM PER PLYWOOD FORM
Size of Thickness of Plywood Form
Wood post
Frame 6mm(1/4") 12mm(1/2")
2"x2" 6634.5417 4546.0139
2"x3" 9950.6944 6820.1389

SCAFFOLDING
Table 5-3 QUANTITY OF LUMBER F0R SCAFFOLDI
Length 178 m
Column
Lumber size Board Ft. per M. ht.
vert. hor.
2"X2" 836.6 3738
2"X3" 1246 5637.26
2"x4" 1664.3 7520.5

ROOFING
Table 6-2 EFFECTIVE COVERING OF G.I. ROOFING S
Length(GUTTER) 5 m 9 pcs
pcs 9.9 Length Eff.Cov. Side Lapping
Ft-Meter 1 1/2 2 1/2
5'-1.50 7.1428571 8.3333333
6'-1.80 7.1428571 8.3333333
7'-2.10 7.1428571 8.3333333
8'-2.40 7.1428571 8.3333333
9'-2.70 7.1428571 8.3333333
10'-3.00 7.1428571 8.3333333
12'-3.60 7.1428571 8.3333333

RIVETS
NO. 624 pcs Table 6-3 QUANTITY OF ROOF ACC. IN KG
Materials kg
G.I ROOF NAILS 5.2
G.I.RIVETS 3.46666666666667
G.I.WASHERS 4.95238095238095
LEAD WASHERS 8.32
UMBRELLA NAILS 5.2

SHEEETS FOR STRAP Table 6-4 QUANTITY OF STRAPS IN ONE PLAIN G.I
NO. 2880 pcs Size of G.I. Strap in
Size of Purlin inches
Inches
cw.nail 12.431655 2"X3" 1"X9"
2"X4" 1"X10"
2"X5" 1"X11"
2"X6" 1"X12"

Table 8-10 QUANTITY OF N

Material per

flor joist & bridging at


30cm. On center

Tt&G WOOD BOARD


1"X4"
1"X6"
Siding wood board on
studs at 60cm. OC
1"x6"
1"x8"
studs/Nailing strips
at 40cm OC
at 60cm OC

scaffolding per

PLYWOOD BOARD 4'x8'


ft
Nailed at 0.15cm OC
224
joist at 40x60 cm dist.

On studs at 40x40 cm
Spacing distance

Rafters, purlins at 0.70


dist.
Ceiling joist at .4x.6 644
spacing distance

PAINTING
AREA 22 sq.m.
gal 0.628571428571429
CONCRETE PROPORTION
Cement in Bag Sand Gravel
40kg. 50.kg cu.m. cu.m.
42 33.25 1.75 3.5
31.5 24.5 1.75 3.5
26.25 21 1.75 3.5
21 17.5 1.75 3.5

TY OF CEMENT AND SAND FOR CHB MORTAR PER SQUARE METER Table 3-5 LENGTH OF REINFORCING BARS FOR CHB IN

Bags Cement Mixture Vertical Reinf. Length


Spacing of bars (m) Spacing
A B C D Sand cu.m.
cm. Layer
64.152 42.282 31.914 26.568 3.5235 per block per sq.m.
123.606 82.458 61.803 51.273 6.8364 40 19.035 237.33 2
183.06 121.5 91.125 75.978 10.125 60 13.851 172.53 3
80 10.368 129.6 4

Y OF CEMENT AND SAND FOR PLASTER PER No. 16 GI TIE WIRE FOR CHB
Table 3-6
SQUARE METER AREA REINFORCEMENT PER SQ.M.
Cement in Bags/Thickness of Plaster Vertical Hor. Lyr Kg per sq.m.
16mm 20mm 25mm Spacing Spacing 25cm 30cm
5.7744 7.218 9.0225 40 2 4.374 5.265
3.8496 4.812 6.015 40 3 3.159 3.807
2.8872 3.609 4.51125 40 4 1.944 2.349
2.406 3.0075 3.7694 60 2 2.916 3.564
0.3208 0.401 0.50125 60 3 2.106 2.592
60 4 1.62 1.944
80 2 2.187 2.673
80 3 1.62 1.944
80 4 1.215 1.458
TY OF CEMENT AND SAND FOR
ER PER SQUARE METER AREA
ement in Bags
Sand in
rout Mixture
cu.m.
C
1.287 0.143
1.214 0.135
1.116 0.124
0.972 0.108

R OF LATERAL TIES IN ONE STEEL BAR AND QUANTITY PER METER TIE WIRE
LENGTH OF COLUMN NO. OF CONNECTIONS 12276
Number of Cut in One Steel Bar Length

5m 6m 7.5m 9m 12m 25cm 30cm 40cm


2 1.3333333 1 kg 57.90566 69.486792 92.649057
2.8571429 1.1764706
3.3333333 1.8181818 1.3333333
2.8571429 1.4285714
2.5 2 1.5384615
4
4 3.3333333 2.2222222 1.6666667
2.8571429
2.5
4
5 4 2
5 3.3333333
2.2222222

5
5 4 3.3333333
5 4 3.3333333 2.5
6.6666667
4 2.8571429
5 4
6.6666667 3.3333333
6.6666667 3.3333333

NTITY OF RSB IN A ONE-WAY QUANTITY OF RSB IN A TWO-WAY


Table 3-12
NFORCED CONCRETE SLAB REINFORCED CONCRETE SLAB
Number of RSB per sq.m. Bar Sp Number of RSB per sq.m.
9m 12m cm. 6m 7.5m 9m 12m
90.64224 66.23136 10 163.57536 0 0 0
72.40896 53.42688 12.5 114.64128 0 0 0
61.25184 44.81568 15 96.74496 0 0 0
52.67808 38.67552 17.5 0 0 0 0
47.09952 34.22016 20 0 0 0 0
41.52096 30.3264 22.5 0 0 0 0
37.96416 27.55584 25 0 0 0 0

E IN A ONE-WAY REINFORCED CONCRETE SLAB IN KILOGRAMS PER SQUARE TIE WIRE IN A TWO-WAY REINFO
Table 3-13
METER
Length of Steel Bars Bar
7.5m 9m 12m Splicing in 6m
0.3 0.4 0.3 0.4 0.3 0.4 cm. 0.3 0.4
17.29728 23.06304 17.2224 22.98816 16.77312 22.38912 10 17.74656 23.66208
11.49408 15.31296 11.0448 14.75136 10.96992 14.63904 12.5 0 0
8.12448 10.82016 8.01216 10.6704 7.75008 10.33344 15 0 0
6.06528 8.08704 5.91552 7.8624 5.72832 7.63776 17.5 0 0
4.71744 6.28992 4.68 6.25248 4.4928 5.9904 20 0 0
3.81888 5.0544 3.70656 4.94208 3.5568 4.71744 22.5 0 0
3.21984 4.26816 3.03264 4.04352 2.88288 3.85632 25 0 0

Table 4-4 QUANTITY OF CEILING BOARD PER SQUARE METER


R OF BOARD FOOT OF STUDS AND NAILING Effective Covering per Number of pieces per
Board Size (cm)
JOIST PER SQUARE METER Board sq.m.
Center to Center (cm) 30x30 57.96 7155.484
40x40 40x60 60x60 40x40 103.04 4025
2053.716 1729.784 1460.592 40x60 154.56 2683.548
4108.076 3460.212 2958.536 60x60 231.84 1789.032
6162.436 5190.64 4442.312 60x120 463.68 894.516
8216.152 6920.424 5921.58 90x180 1043.28 397.348
120x240 1854.72 223.468
D FOOT OF WOOD FRAME FOR
AND BEAM PER PLYWOOD FORM
hickness of Plywood Form
beam
6mm(1/4") 12mm(1/2")
5603.6944 4172.5833
8407.7778 6261.1111
3.58 3
3.67 2.05
1.72 1.16
NTITY OF LUMBER F0R SCAFFOLDING OR STAGGING
0.51 1.17
Column Beam Flooring 1.96 1.04
rd Ft. per M. ht. Board Ft. per M. ht. Board Ft. 11.44 1.93 92.47
brace vert. hor. per M. ht. 1.52 178.1208
2082.6 712 836.6 1085.8 1.1
3115 1068 1246 1619.8 2.6
4156.3 1424 1664.3 2171.6 15.57
92.5 108 270
740 185 378
Table 6-5 COMBINATION OF G.I. ROOF SHEETS ON
TIVE COVERING OF G.I. ROOFING SHEETS
RAFTER LENGTH
Purlins SP Combination of Ro
Rivets RAFTER No. of
(m) Meters Feet Meters
LENGTH Sheet
0.6 126
0.75 126 3 1 3 10'
0.6 162 3.3 1 3.3 11'
0.7 162 3.6 1 3.6 12'
0.6 217.8
0.67 198 3.9 2 2.1 7' and 2.1
0.66 234 4.2 2 2.4 8' and 2.1
4.5 2 2.4 8' and 2.4
4.8 2 3 10' and 2.1
Y OF ROOF ACC. IN KG 5.1 2 3 10' and 2.4
kg 5.4 2 3 10' and 2.7
5.2 5.7 2 3 10' and 3
3.46666666666667 6 2 3.6 12' and 2.7
4.95238095238095 6.3 2 3.6 12' and 3
8.32 6.6 2 3.6 12' and 3.3
5.2 6.9 2 3.6 12' and 3.6

7.2 3 3 10' and 2.4


TITY OF STRAPS IN ONE PLAIN G.I. SHEET 7.5 3 3 10' and 3
Size of G.I. Strap in Number of Strap on 7.8 3 3 10' and 3
Inches one plain sheet 8.1 3 3.6 12' and 3
1"X9" 7.5 8.4 3 3.6 12' and 3
1"X10" 8.42105263157895 8.7 3 3.6 12' and 3.6
1"X11" 9.23076923076923 9 3 3.6 12' and 3.6
1"X12" 10

QUANTITY OF NAILS

per kg req'd size kind of nail

sq.m. 0 30d CWN

sq.m. 0 6d Flooring Brad


sq.m. 0 6d Flooring Brad

sq.m. 0 6d Casing Brad


sq.m. 0 6d Casing Brad

sq.m. 0 8d CWN
sq.m. 0 8d CWN
M height
0 20d CWN
of post
per sheet 12.32 2d Finishing nail

per sq.m. 0 2d Finishing nail

sq.m. 0 20d CWN

sq.m. 35.42 8d Finishing nail


CING BARS FOR CHB IN METERS

Horizontal Reinf.
Length of bars (m)
per block per sq.m.
21.384 267.3
13.932 174.15
11.178 139.32

WIRE FOR CHB


ENT PER SQ.M.
Kg per sq.m.
40cm
6.966
5.103
3.159
4.617
3.402
2.592
3.564
2.592
1.944
E IN A TWO-WAY REINFORCED CONCRETE SLAB IN KILOGRAMS PER SQUARE
METER
Length of Steel Bars
7.5m 9m 12m
0.3 0.4 0.3 0.4 0.3 0.4
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0

OF G.I. ROOF SHEETS ON A GIVEN RAFTER LENGTH


RAFTER LENGTH
Combination of Roof Sheet Length
Meters Feet Meters Feet
and 2.1 7'
and 2.1 7'
and 2.4 8'
and 2.1 7'
and 2.4 8'
and 2.7 9'
and 3 10'
and 2.7 9'
and 3 10'
and 3.3 11'
and 3.6 12'

and 2.4 8' and 2.4 8'


and 3 10' and 2.1 7'
and 3 10' and 2.4 8'
and 3 10' and 2.1 7'
and 3 10' and 2.4 8'
and 3.6 12' and 2.1 7'
and 3.6 12' and 2.4 8'

You might also like