A. DIRECT COST
I.SITE WORKS
WBS and Particulars Qty. Unit U-Cost Total Cost
Sub-total…..Php 900.00
a. Material Cost
Sheet Fiber Cement (6mm thck x 4' x 8') 40.00 shts 400.00 16,000.00
2" x 3" x 20' x 1.0mm thk C Purlins pcs 1.00 lngth 518.00 518.00
Blind Rivets 1.00 box 75.00 75.00
Sub-total…..Php 16,593.00
Sub-total…..Php 12,000.00
Sub-total…..Php
ITEM IV DIRECT COST TOTAL…..Php
a. Material Cost
Sub-total…..Php -
Carpenter 2.00 1 gang composition, 2 carpenters & 4 3.00 days 400.00 2,400.00
Laborers @ 22.06 sq.m /day
Laborer 4.00 3.00 days 300.00 3,600.00
Sub-total…..Php 6,000.00
ITEM V DIRECT COST TOTAL…..Php 6,000.00
a. Material Cost
D1 - Swing Door 1.00 sets 3,500.00 3,500.00
D2 - Panel Door 2.00 sets 1,600.00 3,200.00
Lockset (high quality doorknob) 4.00 sets 750.00 3,000.00
( 3-1/2" x 3-1/2" ) loose pin hinges 12.00 pairs 350.00 4,200.00
Sub-total…..Php 13,900.00
Carpenter 2.00 1 gang composition, 2 Carpenters and 4 2.00 days 400.00 1,600.00
Helpers @ 5 sets/day
a. Material Cost
Sub-total…..Php -
Electrician 1.00 1 gang composition, 2 Carpenters and 4 1.00 days 350.00 400.00
Helpers @ 5 sets/day
Laborer 1.00 1.00 days 250.00 300.00
Sub-total…..Php 700.00
ITEM VI DIRECT COST TOTAL…..Php -
Republic of the Philippines
Department of Social Welfare and Development
KALAHI-CIDSS NCDDP
Barangay COLOSAS
City of DAVAO CITY
Province of DAVAO DEL SUR
Construction of 1 Unit 1-CLassroom School Building with CR, ceiling, Equipment Needed Dumptruck/ Sadam
plumbing fixtures , Electrical Fixtures, paintings, informative sign.
B.3
Republic of the Philippines
Department of Social Welfare and Development
Republic of the Philippines
Barangay
Municipality of
Province of
;;;;;;;;;;;8
2.55%
0.20%
2.75%
100.00%
86,250.00
1,570,914.00