Threats Opportunities
Very 5 10 15 20 25 25 20 15 10 5 Very
high (Moderate) (Moderate) (High) (High) (High) (High) (High) (High) (Moderate) (Moderate) high
5 5
High 4 8 12 16 20 20 16 12 8 4 High
4 (Low) (Moderate) (Moderate) (High) (High) (High) (High) (Moderate) (Moderate) (Low) 4
Probability
Probability
Moderate 3 6 9 12 15 15 12 9 6 3 Moderate
3 (Low) (Low) (Moderate) (Moderate) (High) (High) (Moderate) (Moderate) (Low) (Low) 3
Low 2 4 6 8 10 10 8 6 4 2 Low
2 (Low) (Low) (Low) (Moderate) (Moderate) (Moderate) (Moderate) (Low) (Low) (Low) 2
Very low Low Moderate High Very High Very High High Moderate Low Very Low
1 2 3 4 5 5 4 3 2 1
1.4.1 Lack of 5 3 15
communication due
to disorganized
communication plan
resulting in lack of
clarity and
confusion between
the stakeholders and
project team.
Risk Response
RBS Risk Statement Score Risk Risk Risk Response Types of Risk
ID Prioritization Response
Strategy
1.1.1 Product unqualified 12 Moderate Mitigation Seek advice from Negative
to obtain license probability, the experts that
from the authority High Impact are experience in
due to not meeting the field and
the requirements modify according
and regulations of to the guidelines
the local authorities and regulations
resulting delay in from the
launching the Organizational
product. Process Assets
(OPA).
1.2.1 Huge market for 6 Low Enhancement Scale up the Positive
the product due to Probability, manufacturing
an increase number Moderate process and
of wheelchair users Impact increase the
increase over the production rate to
years resulting in meet the market
the raise of demand demand.
and sales on the
product.
1.2.2 The material 8 Low Avoid Replace the Negative
needed to build the Probability, current supplier
Extended Arm is High Impact with another that
unavailable due to has a better
supplier prioritizing management and
other projects over experience in the
us resulting delay related field.
in manufacturing Evaluate the
process. supplier service
before giving
them the project.
1.3.1 A delay in the 16 High Acceptance Resume the Negative
project timeline due Probability, project as soon as
unpredictable High Impact possible when the
external changes lockdown is
like lockdown in lifted.
the country
resulting in
jeopardizing to
meet the finish
date.