Professional Documents
Culture Documents
MECH4012
Module#3
Tutorial#9
Manufacturing Engineering
1
MANUFACTURING ENGINEERING
42.3 Identify some of the details and decisions that are included within the scope of
process planning.
42.5 What is the difference between a basic process and a secondary process?
42.7 In the make or buy decision, why is it that purchasing a component from a
vendor may cost more than producing the component internally, even though the
quoted price from the vendor is lower than the internal price?
42.8 Identify some of the important factors that should enter into the make or buy
decision.
42.9 Name three of the general principles and guidelines in design for
manufacturability?
42.10 What is concurrent engineering and what are its important components?
Answer. Enabling technologies mentioned in the text are CAD/CAM, electronic mail,
the Internet, and rapid prototyping.
2
engineers, (c) management, (d) product designers, (e) production supervisors, or (f)
technical staff function?
42.2 Which of the following are the usual responsibilities of the manufacturing
engineering department (four best answers): (a) advising on design for
manufacturability, (b) facilities planning, (c) marketing the product, (d) plant
management, (e) process improvement, (f) process planning, (g) product design, (h)
solving technical problems in the production departments, and (i) supervision of
production workers?
42.5 Which of the following are operations to enhance physical properties (three
correct answers): (a) annealing, (b) anodizing, (c) die casting, (d) drilling, (e)
electroplating, (f) rolling of nickel alloys, (g) sheet metal drawing, (h) sintering of
pressed ceramic powders, (i) surface grinding of hardened steel, (j) tempering of
martensitic steel, (k) turning, and (l) ultrasonic cleaning?
42.6 A route sheet is a document whose principal function is which of the following
(one best answer): (a) continuous improvement, (b) design for manufacturability, (c)
provides authorization for material handlers to move the part, (d) quality inspection
procedure, (e) specifies the process plan, or (f) specifies the detailed method for a
given operation?
42.8 Which one of the following types of computer-aided process planning relies on
parts classification and coding in group technology: (a) generative CAPP, (b)
retrieval CAPP, (c) traditional process planning, or (d) none of the preceding?