Professional Documents
Culture Documents
15.7771
A 0.5245
1.4071 0.3000 1.2000 1.5057 1.2000 0.5204 2.3281 1.7850 2.2578 0.3000 1.1319 1.2000 0.9307 1.4127
0.3008 4.9814 0.3000 6.3468 0.3001 3.2677 0.2999
0.2989 0.3000
0.1183
1 1 1 1
0.4465
EXIT
1.9273
1.9464
1.9773
1.4771
SB
SB
1.7850
1.7850
1.7261
1.7850
7.1142
SB
SB
ACCOUNTS OFFICE HR DEPARTMENT
(7.5*6.8) (7.5*6.8)
2.5879
3.3669
3.3668
1.0196
1.4467
0.8170
0.8148
MAIN ENTRY
2 2 2 2
0.4502
0.8267
0.7895
CHANGE OVER SWITCH
2.3727
1.4178
0.8999
0.9000
ELECT. PANEL ROOM
(5*3.5)
0.8999
1.2617
1.2617
1.7850
1.2358
0.8999
0.9000
6.7733
DISTRIBUTION PANEL
ADMIN OFFICE
1.1841
1.1841
(6.5*6.5)
6.8 M COMPUTER CENTER
DRIVEWAY
(90 M2)
2.6516
0.8999
0.9000
0.8366
1.1364
3 3 3 3
0.4513
0.4500
1.0263
0.6984
6.6317
0.9341
LIFT LIFT LIFT LIFT
1950*1950 1950*1950 1950*1950 1950*1950
0.9000
0.5016
1.7850
0.9000
CORE
CORE
3.8647
2.0944
1.8 M
LEV. +0.00 LEV. +0.45 WIDE T = 300 LEV. +0.45 LEV. +3.00
R = 150
0.8727
35.4559
7.3698
6.7403
UP ENTRANCE
RECEPTION UP UP
1 GLASS RAILING 1
HAND RAILING
0.9000
2 2
1 2 3 3 3
4.0673
4 4
DROP OFF
0.6776
5 5
1.8000
6 6
0.9000
7 7
8 9 10 11 12 13 8 9 10 11 12 13 T = 300
LEV. +1.65 LEV. +2.70 R = 150
0.7642
0.6802
0.4500
0.5327
4 4 4 4
1.1761
1.1475
0.6986
0.6667
0.4995
0.3724
0.9000
0.9000
0.6667
0.6042
0.4505
1.2637
1.2644
0.6667
0.4362
6.8731
0.9000
0.9000
0.3476
4a
1.1899
1.1899
1.3810
BACK
2.1985
CONFERENCE ROOM
0.9000
0.9000
UP
LEV. +0.45
ENTRY
0.5529
0.8568
5 5 5 5
1.0453
0.7425
0.7450
18 M WIDE
0.3621
0.6855
2.8072
1.3892
ROAD
0.9000
2.5867
2.5864
1.7850
1.3251
5a
STAFF ROOM PANTRY
1.7850
1.7850
1.7850
4.2886
3.3792
1.4821
1.4825
(80 M2)
LEV. +0.45
1.9275
0.4500
0.4500
0.4528
6 6 6 6
0.8185 1.2000 1.5071 1.2000 0.3000 3.1394 1.1997 2.0137
UP 0.2915
0.8183 1.2000 1.5057 1.2000 0.5188 2.7915 3.8451 1.4668 1.2000 0.9307
0.2997 3.2873 0.3000
0.5114
15.7768
A A1 B C D E1 A B C D D1
A' DN
HT PANEL,
TRANSFORMER LT PANEL
18 M WIDE ROAD
1 1 1 1
MESS KITCHEN
ROOM 1 ROOM 2 ROOM 3
2 2 2 2
STORE
CAFETERIA (6.5*5) ROOM 4
(6.5 * 4.5) ROOM 5
3 3 3 3
LIFT LIFT LIFT LIFT
KITCHEN 1950*1950 1950*1950 1950*1950 1950*1950
(4.5*3.5)
CORE CORE
LEV. +6.00 LEV. +9.00
UP GUEST ROOM UP
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 9 10 11 12 13 8 9 10 11 12 13
4 4 4 4
ROOM 6 ROOM 7
MULTIPURPOSE GYM
HALL (6 *13)
(11*13)
5 5 5 5
EFX546 ROOM 9
ROOM 8 ROOM 10
EFX546
EFX546
6 6 6 6
A A1 B C D1 D A A1 B C D1 D
C1 C1 C1 C1
2.0000
0.3008 5.0685 1.0795 5.6266 3.5727 0.1291
0.1100
1 1
F1 F1 F2
7.0282
7.0395
7.1197
7.1197
C1 C1 C1 C1
2 2
F1
6.7811
6.7699
7.000
6.7679
6.7679
C1 C1 C1
C1
3 3
LIFT LIFT F1 F1 F1 F1
1950*1950 1950*1950
7.3539
7.3765
1 SLOPED FOOTING F1
7.00
7.3701
35.2263
7.3736
1
2
3
4
DROP OFF 5
6 2 COMBINED FOOTING F2
7
8 9 10 11 12 13
C1 C1 C1 C1
4 4
F1 F1 F1 F1
6.8884
4.2771
4.2771
4.2771
6.8658
7.00
6.8728
6.8728
C1 C1 C1
0.4500
0.3000
2.0000
5 5 C1
P.C.C ( 1:4:8) COMPACTED SOIL BASE
9.8608
6.9755
4.3696
4.3696
7.00
7.0958
7.0956
0.75 m
4.6481
5.5957
C1 C1 C1
0.15 0.3000 F2
0.4500
2.0000
1.9970
P.C.C ( 1:4:8)
5 6 C1
A A1 B C D1 D
0.75 m
0.15
P.C.C ( 1:4:8)
1.9464 0.6047
0.8148 1.4178 0.8999 1.2358 0.4500 1.7850 4.0673 0.5327 0.3724 0.4505 0.4362 0.3476 2.1985 1.0453 0.6855 1.7850
LEV. +2.70
UP
ELECT. PANEL ROOM
1950*1950
0.2999
LIFT
8 9 10 11 12 13
LEV. +0.45
LEV. +0.45
(5*3.5)
CORE
A
DISTRIBUTION PANEL
1950*1950
3.2677
LIFT
4
2
3
5
6
7
1
CHANGE OVER SWITCH
LEV. +1.65
R = 150
T = 300
UP
0.3001
WIDE
1.8 M
7.1436
RECEPTION
CONFERENCE ROOM
LEV. +0.45
ENTRANCE
5.5957
2 3
ADMIN OFFICE
C1 C1 C1 C1
1
UP
2.0000
LEV. +0.00
(6.5*6.5)
HAND RAILING
F1 F1 F2
7.0282
7.0395
2.5879 0.8170 0.7895 0.9000 1.2617 0.9000 1.1841 0.9000 0.8366 1.0263 3.8647 1.8000 0.6802 1.1475 0.9000 1.2644 0.9000 1.1899 0.9000 0.5529 0.7450 0.9000 1.3251
0.3621
DROP OFF
6.6481 6.6526 4.9308
35.4559
DRIVEWAY
5a
C1 C1 C1 C1
4
2
5
1
6.8 M
F1
6.7811
6.7699
7.000
C1 C1 C1
C1
F1 F1 F1 F1
7.00
ROOM ROOM
C1 C1 C1 C1
F1 F1 F1 F1 GYM
STORE
6.8884
4.2771
4.2771
4.2771
6.8658
7.00
CLASSROOM CLASSROOM
C1 C1 C1
0.4500
0.3000
2.0000
C1
ADMIN OFFICE PANTRY ELECTRIC RESIDENT MANAGER'S
PANEL ROOM HOUSE
9.8608
6.9755
4.3696
4.3696
7.00
BASEMENT
4.6481
5.5957
C1 C1 C1
0.3000 F2
0.4500
2.0000
1.9970
C1
SECTION A-A'
F1 F1
0.75 m
0.15
P.C.C ( 1:4:8)
C1 C1 C1 C1
2.0000
0.3008 5.0685 1.0795 5.6266 3.5727 0.1291
0.1100
1 1
F1 F1 F2
7.0282
7.0395
7.1197
7.1197
C1 C1 C1 C1
2 2
F1
6.7811
6.7699
7.000
6.7679
6.7679
C1 C1 C1
C1
3 3
LIFT LIFT F1 F1 F1 F1
1950*1950 1950*1950
7.3539
7.3765
1 SLOPED FOOTING F1
7.00
7.3701
35.2263
7.3736
1
2
3
4
DROP OFF 5
6 2 COMBINED FOOTING F2
7
8 9 10 11 12 13
C1 C1 C1 C1
4 4
F1 F1 F1 F1
6.8884
4.2771
4.2771
4.2771
6.8658
7.00
6.8728
6.8728
C1 C1 C1
0.4500
0.3000
2.0000
5 5 C1
P.C.C ( 1:4:8) COMPACTED SOIL BASE
9.8608
6.9755
4.3696
4.3696
7.00
7.0958
7.0956
0.75 m
4.6481
5.5957
C1 C1 C1
0.15 0.3000 F2
0.4500
2.0000
1.9970
P.C.C ( 1:4:8)
5 6 C1
A A1 B C D1 D
0.75 m
0.15
P.C.C ( 1:4:8)
1.3775
1.3775
1.3775
SB
SB
SB
SB
3.3462
3.5000
1.5420
1.5420
1.5420
1.5420
FAN/1200 mm FAN/1200 mm FAN/1200 mm
SB
SB
SB
SB
SB
UP 2.5049
1.8588
1.8588
3.0509
3.0509
3.2562
0.1183
EXIT 1
0.9150 2.2336
1.9464
SB SB
2.6889 SB
1.3775
1.3775
1.7850
ACCOUNTS OFFICE HR DEPARTMENT
COMPUTER
3.2201
SB
SB
(7.5*6.8)
FAN/1200 mm (7.5*6.8)
FAN/1200 mm
CENTER
1.5420
1.5420
FAN/1200 mm
FAN/1200 mm FAN/1200 mm
SB
SB
3.9179 3.8383 3.5502
1.0196
1.4467
1.8588
3.4400
3.3443
3.3293
0.8148
3.0509
MAIN ENTRY
2
0.4502
CHANGE OVER SWITCH
1.6558 SB 2.7939
1.4178
5.0946 5.2182
ELECT. PANEL ROOM
(5*3.5)
LIFT LIFT
0.8999
1950*1950 1950*1950
FAN/1200 mm
1.2358
DISTRIBUTION PANEL
2.0944
(6.5*6.5) LEV. +3.00
UP
GLASS RAILING 1
2
3
4
5
3
0.4500
6
7
8 9 10 11 12 13 T = 300
0.9341
LIFT LIFT R = 150
1950*1950 1950*1950
1.7850
SB SB
.60
.60
5.22 5.3673
CORE
3.8647
.60 .60
1.8 M
LEV. +0.00 LEV. +0.45 WIDE LEV. +0.45
UP ENTRANCE
2.7098
RECEPTION
HAND RAILING
1 2 3 FAN/1200 mm
4.0673
5.0770
5.5741
5.5700
5.5713
1.8000
2.5353 2.7012
3.0284
0.5327
4
1.1475
0.6667
.60 5.3686
0.60 4.9292 4.9297
0.60
0.3724
2.4827 2.9501
0.6667
SB SB
.60
4.6287 1.4083
.60 3.1483 3.2259 .60
0.4505
SB
0.6667
SB
SB
FAN/1200 mm FAN/1200 mm
0.4362
2.8241
2.8245
5.4319
FAN/790 mm
SB
PANTRY
0.3476
4a FAN/1200 mm
FAN/1200 mm
1.3810
BACK
2.1985
CONFERENCE ROOM
UP
ENTRY
2.8242
2.8243
0.60 4.9292 4.9297 0.60 LEV. +0.45
3.4355
4.3642 1.0404 4.7668
5 BALCONY
1.0453
3.2258
ROAD 0.6855
RESIDENT MANAGER
(80 M2)
LEV. +0.45
ELECTRICAL LEGEND
S. No. FIXTURE SIGN HEIGHT
0.4500
6
0.8185 1.2000 1.5071 1.2000 0.3000 3.1394 1.1997 2.0137
UP
0.5114
0.2997 3.2873 0.3000 1. WALL TUBE LIGHT 2.40 m
15.7768
A A1 B C D E1
A' DN 3. CEILING LED LIGHTS N.A.
Mentioned at
HT PANEL,
4. SWITCH BOARD SB Fixture
TRANSFORMER LT PANEL
5. COVE LIGHTS N.A.
LINETYPE LEGEND
S. No. LINE TYPE SYMBOL
18 M WIDE ROAD
1. ONE-WAY LINE
2. TWO-WAY LINE
3. CONNECTED SWITCH-BOARDS
GROUND FLOOR PLAN
FAN/1200 mm FAN/1200 mm
SB
FAN/1200 mm
SB
3.3299
.60 2.5268 2.5268 2.5268 2.5268 .60
ELECTRICAL LEGEND
SB
3.3254
0.75 SB 3.62
SB
SB
0.5858
SB
3.3337
SB
LIFT
1950*1950
LIFT
1950*1950
5. COVE LIGHTS N.A.
LIFT LIFT
1950*1950 1950*1950
FAN/790 mm
CORE
LEV. +9.00
CORE
SB
KITCHEN
UP
LEV. +6.00 UP
1
2
LINETYPE LEGEND
1 3
4
SYMBOL
2
3
4
5
5
6
7
S. No. LINE TYPE
6 8 9 10 11 12 13
7
8 9 10 11 12 13
1. ONE-WAY LINE
2. TWO-WAY LINE
3. CONNECTED SWITCH-BOARDS
ROOM 6 ROOM 7
FAN/1200 mm FAN/1200 mm
GYM
MULTIPURPOSE (6 *13) SB SB
SB
SB
HALL
FAN/1200 mm
SB
SB
ROOM 9
SB SB
ROOM 8 ROOM 10
FAN/1200 mm FAN/1200 mm
+20.35 M
PARAPET FLOOR
LEVEL
+19.35 M
ROOF FLOOR LEVEL
+16.20 M
FIFTH FLOOR
FLOOR LEVEL
+13.05 M
FOURTH FLOOR
LEVEL
+9.90 M
THIRD FLOOR
LEVEL
+6.75 M
SECOND FLOOR
LEVEL
+3.60 M
FIRST FLOOR LEVEL
+0.45 M
PLINTH LEVEL
+0.00 M
GROUND LEVEL
WEST ELEVATION
+24.15 M
CANOPY LEVEL
+22.95 M
MUMTY LEVEL
+20.35 M
PARAPET FLOOR
LEVEL
+19.35 M
ROOF FLOOR LEVEL
+16.20 M
FIFTH FLOOR
FLOOR LEVEL
+13.05 M
FOURTH FLOOR
LEVEL
+9.90 M
THIRD FLOOR
LEVEL
+6.75 M
SECOND FLOOR
LEVEL
+3.60 M
FIRST FLOOR LEVEL
+0.45 M
PLINTH LEVEL
+0.00 M
GROUND LEVEL
SOUTH ELEVATION
7 8 9 10 11 12 13 14
6 15
5 16
4 17
3 18
2 19
1 20
18 MM STONE ON
UP TREAD AS PER
T = 300 SPECIFICATION
R = 150
10 MM NOSING
A
15 MM STONE ON
RISER AS PER
SPECIFICATION
DETAIL AT A
DETAIL
AT A
SECTION A-A'