Over-Consumption and Under-Consumption in Sucontracting.: Former Member
Over-Consumption and Under-Consumption in Sucontracting.: Former Member
Former Member
Jan 25, 2008 at 08:01 AM
Hi,
What are the related activities that must be done in this cases?
Best regards
Add a Comment
Alert moderator
Assigned Tags
MM (Materials Management)
SAP ERP
Similar Questions
4 Answers
Sort by:
Votes
Newest
Oldest
Best Answer
2
Vote up Vote down
Former Member
Jan 25, 2008 at 01:45 PM
Hi
For eg.) As per your BOM....you have sent 10kg. of Grease to your Sc-Vendor useing
M.Type:541....for assembling of your FG...Now after completion of the Assembling,you
found that only 7kg. of Grease only used by Sc-Vendor for your assembling and 3kg of
Grease is still lying at SC-Vendor's Place.......Now you have to do Subsequent
adjustment in MIGO and take back the balance under consumed Grease from SC-
Vendor...To Do this,
Goto -
> T.Code: MIGO...choose the transaction "Subsequent Adjustment" and ref. doc. as
your SC-PO...
And in Itm View,for the Line item Grease....you maintain the underconsumed qty( ie.
3kg) and Check the Under Consumption check box ....
Now if you execute the subsequent Adjustment....this 3kg of Grease will be regenerated
in 544 O- movement type as under consumed component and it will be Lying at Sc-
Vendor's place...and you have to get back this into Company's Stock separately in
MB1B useing M.Type:542...
Same this you can do for Over Consumption also....for this you should not Check the
Under Consumption Check Box....Here the Over consumed material will be consumed
in 543 O- movement type...and again you have to issue this Over Consumed qty to SC-
Vendor in M.Type:MB1B useing m.Type: 541...
The same subsequent Adjustment you can do for Scrap generation also....
Reward if useful
S.Baskaran
Add a Comment
Alert moderator
Share
Former Member
Jan 25, 2008 at 08:07 AM
then again come to migo select the display variant as subsequent settlement form in
place of good reciept and then give the po no. then in front of u r component u can give
thequantity and then there is a check box if u mark it means it is under consumption if u
leave it blank then it means it is over consumption (please press F1 on check box and
get the exact info)
SANTOSH POTE
Jan 25, 2008 at 08:12 AM
or
MB04
Add a Comment
Alert moderator
Share
Former Member
Jan 25, 2008 at 08:23 AM
Hi,
Please refer following thread.
Subsequent Adjustment
Ishu