You are on page 1of 1

PT.

SULFINDO ADI USAHA Date REVISION PREPARED APPROVED

SHUT DOWN PLANNING VCM PLANT 11 Oct 2019 0 Wahyu J Tedi N

DEPARTEMENT PRODUKSI EDC- VCM February 2020


TITTLE : DECOKING

TANGGAL 01/02/20 02/02/20 03/02/20 04/02/20 05/02/20 06/02/20 07/02/20 08/02/20 09/02/20 10/02/20 11/02/20 12/02/20 13/02/20 14/02/20 15/02/20 16/02/20 17/02/20 18/02/20 19/02/20 20/02/20 21/02/20 22/02/20 23/02/20

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Shift 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

TBO TBO

Steam STEAM

Hot Work HOT WORK PROCESS

Oil Out/Oil In Oil Out Oil In


H/U Charging
VR 511
stop

Dumping Cooling Down T/O Elbow Sparger, Cleaning Sparger, Cleaning Manifold, Replace Ram Valve, Cleaning Inside Inspection Leak Test S/U
Catalyst

L/T and N2
VT 201 L/O N2 Purging Replace Roof (Hot Work), Repair Anchor Bolt and Inspection
Purging
Filling

VS 211 L/O Pg Cleaning bottom, shypone line, blow down line, buffler level and Inspection L/T, S/B N2 Purging Cold Run Hot Run

VH211/ VH212 C/C Jet Cleaning L/T tube C/C L/T, S/B

Filling Hot
Hot oil L/O Flushing use Therminol FF L/O
Oil
Swin
C/D Swing M g Leak test Shock Heat
stop

VF 211 HCL stripping


Elbow Decocking + Air Burning CD
H Cleaning Burner, Repair Burner, Repair shell, Repair cerra blanket and Inspection elbo blow up
Hot run Small Cracking
w
cool Swing Swing
VH 221 AB
stop

HCL stripping
down elbow Jet Cleaning elbow

Blind, Blind, Hot run


VC 231 HCl stripping L/O N2 Purging Hot Water Cleaning Inspection L/T, S/B N2 Purging Cold Run
Blind, Open all Manhole, Inspection, Close Manhole

MH,Top MH VF211

VC 241 HCL stripping L/O N2 Purging Replace Packing L/T

VC 242

Open other manhole


HCL stripping L/O N2 Purging Replace Packing L/T

Install Manhole
Injection Nh3
open top MH

Open Blind

Open Blind
purging

Drying Cold Drying Hot VCM


VC 311

L/T
HCl Stripping L/O Hot water Cleaning Open Man way, Inspection, Repair Tray, Close Man Way L/T S/B Hot N2 Drying
Run Run Purific

VH 311 Jet Cleaning IRIS

Transfer Freon To
VG 920/VH 312
Open other manhole

Receiver
N2 Purging , Replace Pipe PSV, PG (OLS), Valve Drain Oil L/T System Vacuuming System Filling Freon

VC 321 L/O P/G Hot Water Cleaning Open Man Way, Inspection and Close Man Way L/T, S/B N2 Purging Cold Run Hot Run

VH 321 Jet Cleaning IRIS

Open Washing Packing , check top distributor when no problem check


VC 111 L/O P/G
OH chimney by take out all packing
L/T, S/B N2 Purging Drying

VH 111
Open other manhole

Jet Cleaning

VC 121 L/O P/G Hot Water Cleaning Open Man Way, Inspection, Repair Shell and Close Man Way L/T, S/B N2 Purging Cold Run Hot Run

L/T
VH 121 Jet Cleaning Tube

VH 122
Open other manhole

IRIS

VC 131 L/O P/G Hot Water Cleaning Open Man Way, Inspection and Close Man Way L/T, S/B N2 Purging Cold Run Hot Run

L/T
VH 131 Jet Cleaning Tube

VR 125/ VC 141 R/ Cl2 L/ O N2 Purging T/O Packing Cleaning shell, bottom piping Charging packing L/T, S/B N2 Purging Cold Run Hot Run

VH 141 Jet Cleaning

Take out Cleaning all nozzle, cleaning bottom


VC 711 L/ O N2 Purging
packing column+piping
Charging packing L/T, S/B N2 Purging Cold Run Hot Run

L/T
VH 711 Jet Cleaning Tube

UT 210 Cleaning Basin Pasivation

VC 561 Replace Stack and Inspection

Stop VG 510 VG 510 Install


VG 510 T/O Motor
Repair Motor to ABB Work Shop 12 Day → From 4th to 15 th
Motor

VG 510 Repair Compressor of VG 510 By FMM 12 Day (Fom 4th to 15 th )

VC 551 Repair VC 551

VC 631 HWC Replace line over head VC 631, replace VH 631 and repair VS 631

VC 825 Replace Buble tray

VC 826 Inspect Inside

VH 823 Chemical cleaning

VH 824 Chemical cleaning

PG Purging R/ Cl2 Removal chlorine

L/T Leak test Steam line repairmen Production Maintenance

S/ B Shock blow C/C Channel cover