Professional Documents
Culture Documents
2. Leakage Test
• Open valve inlet air slowly and close after 2 kgf/cm2
• Check each connection with bubble soap
• Hold pressure until 1 hour
3. Release Pressure
• Open release valve slowly
Note:
Compressed air without contaminant oil & grease (PT. Sulfindo Adiusaha)