DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00013

Cordillera Administrative Region Contract Name: Convergence and Special Support Program: Special Road Fund - Motor Vehicle
User's Charge (MVUC) as per R.A. 11239 - Preventive Maintenance of Road:
Engineer's Hill, Baguio City Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12MM) with Correction -
Benguet - Nueva Vizcaya Road K0288+000 - K0319+726

Contract Location: Bokod, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED


Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per Major
Dimensions
ID Location Address % Start Completion Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

100%
CONCRETING OF ABANG-QUIMLOONG LOCAL ROAD IN DPWH - Abra District Engineering
19PA0104 BUCAY, ABRA, ABANG-QUIMLOONG, BUCAY, ABRA
100% 06/28/19 03/17/21 Final Billing on 96.18% RCP 0.1 km ₱1,978,000.00
Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAMP DPWH - Abra District Engineering
19PA0106 100% 09/07/19 03/17/21 Final Billing on 95.70% Building 1 storey ₱1,942,883.91
JUAN VILLAMOR COVERED COURT), BANGUED, ABRA Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING (DUGONG DPWH - Abra District Engineering
19PA0107 COVERED COURT), BUCAY, ABRA
100% 03/07/19 03/17/21 Final Billing on 96.77% Building 1 storey ₱1,937,630.83
Office
Process

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND 100%


RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM: DPWH - Abra District Engineering
19PA0117 100% 03/09/19 05/06/21 Final Billing on 90.63% Bridges 20 m ₱15,416,451.62
REPLACEMENT OF PERMANENT WEAK BRIDGES, BIWENG Office
BRIDGE (B04733LZ), ALONG ABRA-CERVANTES ROAD Process

REHABILITATION/RECONSTRUCTION OF ROADS WITH Roads: Construction - Slope Protection


SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0117 100% 11/23/20 05/06/21 56.33% 55.15% 41 m ₱59,940,400.71
ROADS, ABRA-KALINGA ROAD, K0444+417-K0444+468, Office Revetment, Retaining Structures,
BARANGAY LINGAS, LICUAN-BAAY, ABRA Wirenet)

REHABILITATION/RECONSTRUCTION OF ROADS WITH Roads: Construction - Slope Protection


SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0118 ROADS, ABRA-ILOCOS NORTE ROAD, K0433+440-
100% 11/23/20 03/15/21 86.11% 80.53% Revetment, Retaining Structures,
300 m ₱86,065,447.79
Office
K0433+740, BARANGAY NAGAPARAN, DANGLAS, ABRA Wirenet)

REHABILITATION/ RECONSTRUCTION OF ROADS WITH


Roads: Construction - Slope Protection
SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY
DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0146 ROADS 100% 07/12/20 03/03/21 98.57% 95.74% 65 m ₱51,488,507.47
ABRA-KALINGA ROAD, K0474+365-K0474+430, LICUAN- Office Revetment, Retaining Structures,
Wirenet)
BAAY, ABRA

Asset Preservation-Rehabilitation/Reconstruction of National


DPWH - Quirino District Roads: Construction - Slope Protection
Roads with Slips, Slope Collapse and Landslide-Tertiary Roads-
using Structural Measures (e.g.
20BK0059 Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct. Victoria-Kasibu Engineering Office / Cabarroguis, 100% 12/03/20 08/12/21 22.91% 15.23% Revetment, Retaining Structures,
0.16 km ₱26,653,833.13
Bdry) - K0363+555-K0363+605, K0375+765-K0375+790, Quirino Wirenet)
K0382+525-K0382+605, K0382+675-K0382+715
BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - Bridges: Construction - Concrete
DPWH - Quirino District
20BK0062 CAJEL BR. ALONG CORDON-AURORA BDRY RD (ISABELA 100% 02/28/20 03/04/21 96.22% 97.04% (Superstructure) - with Cast-in-Place 30 m ₱57,894,040.52
BDRY-JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0021 LUKBAN BR. (B04905LZ) ALONG CORDON - AURORA BNDRY 100% 02/19/21 10/07/21 0.80% 1.30% (Superstructure) - with Cast-in-Place 0.89 kms ₱24,178,071.39
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0022 DISINABA BR. (B04906LZ) ALONG CORDON - AURORA BDRY 100% 02/19/21 09/07/21 0.00% 1.49% (Superstructure) - with Cast-in-Place 30 m ₱24,177,690.69
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QURINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


Bridges: Construction - Concrete
DUMATATA BR. (B01938LZ) ALONG CORDON - AURORA DPWH - Quirino District
21BK0023 BDRY RD (ISABELA BDRY - JCT DUMABATO) SAGUDAY,
100% 02/19/21 09/10/21 1.05% 1.47% (Superstructure) - with Cast-in-Place 30 m ₱26,151,926.30
Engineering Office Piles
QUIRINO

LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and
Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00032 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/20 07/20/21 46.77% 50.33% Revetment, Retaining Structures,
5 kms ₱144,725,875.00
ROADS ABRA - ILOCOS NORTE ROAD, KO431+710 - Administrative Region / Baguio
City Wirenet)
KO431+920
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00033 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/20 06/20/21 52.62% 55.93% Revetment, Retaining Structures,
4.4 kms ₱112,953,250.00
ROADS ABRA - ILOCOS NORTE ROAD, KO434+600 - Administrative Region / Baguio
City Wirenet)
KO434+870
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00034 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/20 06/20/21 55.22% 55.93% Revetment, Retaining Structures,
4.2 kms ₱120,697,375.00
ROADS ABRA - ILOCOS NORTE ROAD, KO446+030 - Administrative Region / Baguio
City Wirenet)
KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00035 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/20 06/20/21 59.80% 55.93% Revetment, Retaining Structures,
4 kms ₱107,462,400.00
ROADS ABRA - ILOCOS NORTE ROAD, KO447+540 - Administrative Region / Baguio
City Wirenet)
KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA
Organizational Outcome 1: Ensure Safe and Reliable Department of Public Works and
Bridges: Construction - Concrete
National Road Sysytem - Bridge Program - Replacement of Highways - Cordillera
20P00043 Permanent Weak Bridges - Soot Bridge (B00989LZ) along Abra - Administrative Region / Baguio
100% 11/26/20 11/10/23 2.38% 7.26% (Superstructure) - with Cast-in-Place 380.00 lm ₱530,757,818.36
Piles
Ilocos Norte Road City

Rehabilitation of Pasig Slaughterhouse (Phase I) at Ilugin St.,


N/A Brgy. Pinagbuhatan, Pasig City
City Government of Pasig 100% 12/12/18 03/10/21 93.00% 94.36% Rehabilitation/Building Works 1.00 storey ₱59,238,200.00

Armed Forces of the Philippines /


GB2-PB-03- Construction of the Four-Storey HAG and HTG Building at PMA,
Camp General Emilio Aguinaldo, 100% 09/25/20 11/24/21 20.84% 19.98% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
20 Fort Gregorio H. Del Pilar, Baguio City
Quezon City

BSU Project Construction of Two Storey Command Center Building in Batangas State University / Pablo
Batangas State University Pablo Borbon Main I
100% 11/09/20 06/06/21 17.19% 17.16% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
No. 2020-255 Borbon Main I

BSU Project Construction of Four Storey Student Services Center Building in Batangas State University / Pablo
100% 01/13/21 05/27/22 1.24% 0.63% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
No. 2020-260 Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0095 100% 09/17/20 05/14/21 66.30% 65.83% 0.5 kms ₱14,474,988.23
K0529+104 - K0529+192, Pinukpuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0096 100% 09/17/20 07/13/21 49.22% 52.67% 0.5 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0097 K0492+320-k0492+572, Tabuk City, Kalinga
100% 09/17/20 07/13/21 52.11% 52.67% Revetment, Retaining Structures,
0.5 kms ₱14,474,994.34
Engineering Office
Wirenet)

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS


WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO-
DPWH - Surigao Del Norte 2nd
20NG0060 DAVAO COASTAL ROAD, HAYANGGABON SECTION/BRGY. 100% 10/05/20 03/24/21 85.96% 81.87% Roads: Construction - Slope Protection 177 m ₱82,484,700.07
HAYANGGABON, CLAVER, SURIGAO DEL NORTE, District Engineering Office
K1195+570 - K1195+747

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS


WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO- DPWH - Surigao Del Norte 2nd
20NG0061 DAVAO COASTAL ROAD, BACUAG SECTION / BRGY. POB.,
100% 10/05/20 03/24/21 76.64% 81.87% Roads: Construction - Slope Protection 227 m ₱66,384,648.43
District Engineering Office
BACUAG, SURIGAO DEL NORTE, K1161+011 - K1161+238

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS


WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO-
DPWH - Surigao Del Norte 2nd
20NG0080 DAVAO COASTAL ROAD CAGDIANAO SECTION/ BRGY. 100% 10/05/20 03/21/21 89.17% 83.33% Roads: Construction - Slope Protection 218 m ₱81,382,084.34
CAGDIANAO, CLAVER, SURIGAO DEL NORTE K1195+867 - District Engineering Office
K1196+085

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0084 INFANTA ROAD (PACKAGE A) INFANTA, QUEZON,
100% 09/04/20 06/15/21 61.06% 60.00% Roads: Construction - Slope Protection 0.191 kms ₱45,153,499.98
Engineering Office
K0116+102-K0116+293

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0085 100% 09/04/20 06/15/21 56.75% 60.00% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, Engineering Office
K0116+642-K0116+950
RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,
SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0086 INFANTA ROAD (PACKAGE C) INFANTA, QUEZON,
100% 09/04/20 06/15/21 55.33% 60.00% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
Engineering Office
K0117+308-K0177+680

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0087 INFANTA ROAD (PACKAGE D) INFANTA, QUEZON,
100% 09/04/20 06/15/21 67.07% 60.00% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
Engineering Office
K0118+230-K0118+500

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 -
20EO0057 K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO
DPWH - Regional Office IV-B 100% 11/26/20 07/07/21 35.11% 39.29% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 (S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/20 07/03/21 41.22% 40.00% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 (S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/20 07/07/21 32.17% 39.29% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/20 07/10/21 40.08% 38.77% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/20 07/10/21 36.51% 38.77% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/20 07/03/21 39.77% 40.00% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/20 07/10/21 35.64% 38.77% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DPWH - Cotabato 2nd District
20MC0043 DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO
100% 11/24/20 08/14/21 34.13% 34.09% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
Engineering Office
K1640+341, PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 100% 11/24/20 05/24/21 52.78% 49.45% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
GREENFIELD RD (S00711MN) K1633+100 TO K1633+175, Engineering Office
MAGPET, NORTH COTABATO

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH - Cebu 5th District
20HI0026 CADARUHAN, BORBON, CEBU
100% 03/12/20 06/09/20 Final Billing on 100.00% Building 1 storey ₱3,361,050.00
Engineering Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DPWH - Cebu 5th District
20HI0029 100% 03/12/20 06/09/20 Final Billing on 100.00% Building 1 storey ₱3,361,050.00
LAAW, BORBON, CEBU Engineering Office
Process

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHABILITA DPWH - Cebu 5th District


20HI0057 TION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, CEBU
100% 11/25/20 05/18/21 50.20% 50.86% Building 0.5 km ₱14,108,500.00
Engineering Office

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DPWH - Cebu 5th District
20HI0068 100% 10/28/20 01/25/21 Final Billing on 100.00% Building 1 storey ₱1,901,196.98
CADARUHAN, BORBON, CEBU Engineering Office
Process
Key: WA = Work Accomplished TE = Time Elapsed
Total Outstanding Value of Work = ₱1,719,789,558.18

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : 22-Feb-21
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00043

Cordillera Administrative Region Contract Name: Organizational Outcome 1: Ensure Safe and Reliable National Road System -
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Engineer's Hill, Baguio City Benguet - Nueva Vizcaya Road KO254+(-372) - KO281+800 Benguet

Contract Location: Nueva Vizcaya Road, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED


Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per Major
Dimensions
ID Location Address % Start Completion Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

100%
CONCRETING OF ABANG-QUIMLOONG LOCAL ROAD DPWH - Abra District Engineering
19PA0104 100% 06/28/2019 03/17/2021 Final Billing on 96.18% RCP 0.1 km ₱1,978,000.00
IN BUCAY, ABRA, ABANG-QUIMLOONG, BUCAY, ABRA Office
Process

CONSTRUCTION OF MULTI-PURPOSE BUILDING 100%


DPWH - Abra District Engineering
19PA0106 (CAMP JUAN VILLAMOR COVERED COURT), BANGUED, 100% 09/07/2019 03/17/2021 Final Billing on 95.70% Building 1 storey ₱1,942,883.91
Office
ABRA Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING DPWH - Abra District Engineering
19PA0107 100% 03/07/2019 03/17/2021 Final Billing on 96.77% Building 1 storey ₱1,937,630.83
(DUGONG COVERED COURT), BUCAY, ABRA Office
Process

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND


RELIABLE NATIONAL ROAD SYSTEM BRIDGE 100%
DPWH - Abra District Engineering
19PA0117 PROGRAM: REPLACEMENT OF PERMANENT WEAK 100% 03/09/2019 05/06/2021 Final Billing on 90.63% Bridges 20 m ₱15,416,451.62
Office
BRIDGES, BIWENG BRIDGE (B04733LZ), ALONG ABRA- Process
CERVANTES ROAD

REHABILITATION/RECONSTRUCTION OF ROADS WITH


SLIPS, SLOPE COLLAPSE AND LANDSLIDE- Roads: Construction - Slope Protection
DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0117 SECONDARY ROADS, ABRA-KALINGA ROAD, 100% 11/23/2020 05/06/2021 56.33% 55.15% 41 m ₱59,940,400.71
Office Revetment, Retaining Structures,
K0444+417-K0444+468, BARANGAY LINGAS, LICUAN- Wirenet)
BAAY, ABRA

REHABILITATION/RECONSTRUCTION OF ROADS WITH Roads: Construction - Slope Protection


SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0118 100% 11/23/2020 03/15/2021 86.11% 80.53% 300 m ₱86,065,447.79
ROADS, ABRA-ILOCOS NORTE ROAD, K0433+440- Office Revetment, Retaining Structures,
K0433+740, BARANGAY NAGAPARAN, DANGLAS, ABRA Wirenet)

REHABILITATION/ RECONSTRUCTION OF ROADS WITH


SLIPS, SLOPE COLLAPSE AND LANDSLIDE- Roads: Construction - Slope Protection
DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0146 SECONDARY ROADS 100% 07/12/2020 03/03/2021 98.57% 95.74% 65 m ₱51,488,507.47
Office Revetment, Retaining Structures,
ABRA-KALINGA ROAD, K0474+365-K0474+430, LICUAN- Wirenet)
BAAY, ABRA

Asset Preservation-Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide- Roads: Construction - Slope Protection
DPWH - Quirino District
Tertiary Roads-Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd using Structural Measures (e.g.
20BK0059 Engineering Office / Cabarroguis, 100% 12/03/2020 08/12/2021 22.91% 15.23% Revetment, Retaining Structures,
0.16 km ₱26,653,833.13
(Jct. Victoria-Kasibu Bdry) - K0363+555-K0363+605,
Quirino Wirenet)
K0375+765-K0375+790, K0382+525-K0382+605,
K0382+675-K0382+715

BRIDGE PROGRAM - CONSTRUCTION OF NEW Bridges: Construction - Concrete


DPWH - Quirino District
20BK0062 BRIDGES - CAJEL BR. ALONG CORDON-AURORA BDRY 100% 02/28/2020 03/04/2021 96.22% 97.04% (Superstructure) - with Cast-in-Place 30 m ₱57,894,040.52
Engineering Office Piles
RD (ISABELA BDRY-JCT DUMABATO) DIFFUN, QUIRINO
BRIDGE PROGRAM - WIDENING OF PERMANENT
Bridges: Construction - Concrete
BRIDGES - LUKBAN BR. (B04905LZ) ALONG CORDON - DPWH - Quirino District
21BK0021 100% 02/19/2021 10/07/2021 0.80% 1.30% (Superstructure) - with Cast-in-Place 0.89 kms ₱24,178,071.39
AURORA BNDRY RD (ISABELA BDRY - JCT DUMABATO) Engineering Office Piles
DIFFUN, QUIRINO

BRIDGE PROGRAM - WIDENING OF PERMANENT


Bridges: Construction - Concrete
BRIDGES - DISINABA BR. (B04906LZ) ALONG CORDON DPWH - Quirino District
21BK0022 100% 02/19/2021 09/07/2021 0.00% 1.49% (Superstructure) - with Cast-in-Place 30 m ₱24,177,690.69
- AURORA BDRY RD (ISABELA BDRY - JCT DUMABATO) Engineering Office Piles
DIFFUN, QURINO

BRIDGE PROGRAM - WIDENING OF PERMANENT


Bridges: Construction - Concrete
BRIDGES - DUMATATA BR. (B01938LZ) ALONG DPWH - Quirino District
21BK0023 100% 02/19/2021 09/10/2021 1.05% 1.47% (Superstructure) - with Cast-in-Place 30 m ₱26,151,926.30
CORDON - AURORA BDRY RD (ISABELA BDRY - JCT Engineering Office Piles
DUMABATO) SAGUDAY, QUIRINO

LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEM
Department of Public Works and Roads: Construction - Slope Protection
ENT OF VARIOUS INFRASTRUCTURE INCLUDING
Highways - Cordillera using Structural Measures (e.g.
20P00032 LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - 100% 09/24/2020 07/20/2021 46.77% 50.33% Revetment, Retaining Structures,
5 kms ₱144,725,875.00
Administrative Region / Baguio
NATIONAL ROADS ABRA - ILOCOS NORTE ROAD, Wirenet)
City
KO431+710 - KO431+920
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEM
Department of Public Works and Roads: Construction - Slope Protection
ENT OF VARIOUS INFRASTRUCTURE INCLUDING
Highways - Cordillera using Structural Measures (e.g.
20P00033 LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - 100% 09/24/2020 06/20/2021 52.62% 55.93% 4.4 kms ₱112,953,250.00
Administrative Region / Baguio Revetment, Retaining Structures,
NATIONAL ROADS ABRA - ILOCOS NORTE ROAD, Wirenet)
City
KO434+600 - KO434+870
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEM
Department of Public Works and Roads: Construction - Slope Protection
ENT OF VARIOUS INFRASTRUCTURE INCLUDING
Highways - Cordillera using Structural Measures (e.g.
20P00034 LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - 100% 09/24/2020 06/20/2021 55.22% 55.93% Revetment, Retaining Structures,
4.2 kms ₱120,697,375.00
Administrative Region / Baguio
NATIONAL ROADS ABRA - ILOCOS NORTE ROAD, Wirenet)
City
KO446+030 - KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEM
Department of Public Works and Roads: Construction - Slope Protection
ENT OF VARIOUS INFRASTRUCTURE INCLUDING
Highways - Cordillera using Structural Measures (e.g.
20P00035 LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - 100% 09/24/2020 06/20/2021 59.80% 55.93% 4 kms ₱107,462,400.00
Administrative Region / Baguio Revetment, Retaining Structures,
NATIONAL ROADS ABRA - ILOCOS NORTE ROAD, Wirenet)
City
KO447+540 - KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA

Organizational Outcome 1: Ensure Safe and Reliable Department of Public Works and
Bridges: Construction - Concrete
National Road Sysytem - Bridge Program - Replacement of Highways - Cordillera
20P00043 100% 11/26/20 10/11/2023 2.38% 7.26% (Superstructure) - with Cast-in-Place 380.00 lm ₱530,757,818.36
Permanent Weak Bridges - Soot Bridge (B00989LZ) along Administrative Region / Baguio Piles
Abra - Ilocos Norte Road City

Rehabilitation of Pasig Slaughterhouse (Phase I) at Ilugin


N/A City Government of Pasig 100% 12/12/2018 03/10/2021 93.00% 94.36% Rehabilitation/Building Works 1.00 storey ₱59,238,200.00
St., Brgy. Pinagbuhatan, Pasig City

Armed Forces of the Philippines /


GB2-PB-03- Construction of the Four-Storey HAG and HTG Building at
Camp General Emilio Aguinaldo, 100% 09/25/2020 11/24/2021 20.84% 19.98% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
20 PMA, Fort Gregorio H. Del Pilar, Baguio City
Quezon City

BSU Project Construction of Two Storey Command Center Building in Batangas State University / Pablo
100% 11/09/2020 06/06/2021 17.19% 17.16% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
No. 2020-255 Batangas State University Pablo Borbon Main I Borbon Main I
BSU Project Construction of Four Storey Student Services Center Batangas State University / Pablo
100% 01/13/2021 05/27/2022 1.24% 0.63% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
No. 2020-260 Building in Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0095 100% 09/17/2020 05/14/2021 66.30% 65.83% Revetment, Retaining Structures,
0.5 kms ₱14,474,988.23
K0529+104 - K0529+192, Pinukpuk, Kalinga Engineering Office
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0096 100% 09/17/2020 07/13/2021 49.22% 52.67% 0.5 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0097 100% 09/17/2020 07/13/2021 52.11% 52.67% Revetment, Retaining Structures,
0.5 kms ₱14,474,994.34
K0492+320-k0492+572, Tabuk City, Kalinga Engineering Office
Wirenet)
REHABILITATION/RECONSTRUCTION OF NATIONAL
ROADS WITH SLIPS, SLOPE COLLAPSE AND
LANDSLIDE, SURIGAO-DAVAO COASTAL ROAD, DPWH - Surigao Del Norte 2nd
20NG0060 100% 10/05/2020 03/24/2021 85.96% 81.87% Roads: Construction - Slope Protection 177 m ₱82,484,700.07
HAYANGGABON SECTION/BRGY. HAYANGGABON, District Engineering Office
CLAVER, SURIGAO DEL NORTE, K1195+570 -
K1195+747

REHABILITATION/RECONSTRUCTION OF NATIONAL
ROADS WITH SLIPS, SLOPE COLLAPSE AND
DPWH - Surigao Del Norte 2nd
20NG0061 LANDSLIDE, SURIGAO-DAVAO COASTAL ROAD, 100% 10/05/2020 03/24/2021 76.64% 81.87% Roads: Construction - Slope Protection 227 m ₱66,384,648.43
District Engineering Office
BACUAG SECTION / BRGY. POB., BACUAG, SURIGAO
DEL NORTE, K1161+011 - K1161+238

REHABILITATION/RECONSTRUCTION OF NATIONAL
ROADS WITH SLIPS, SLOPE COLLAPSE AND
DPWH - Surigao Del Norte 2nd
20NG0080 LANDSLIDE, SURIGAO-DAVAO COASTAL ROAD 100% 10/05/2020 03/21/2021 89.17% 83.33% Roads: Construction - Slope Protection 218 m ₱81,382,084.34
District Engineering Office
CAGDIANAO SECTION/ BRGY. CAGDIANAO, CLAVER,
SURIGAO DEL NORTE K1195+867 - K1196+085

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG DPWH - Quezon 1st District
20DK0084 100% 09/04/2020 06/15/2021 61.06% 60.00% Roads: Construction - Slope Protection 0.191 kms ₱45,153,499.98
MARIKINA-INFANTA ROAD (PACKAGE A) INFANTA, Engineering Office
QUEZON, K0116+102-K0116+293

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG DPWH - Quezon 1st District
20DK0085 100% 09/04/2020 06/15/2021 56.75% 60.00% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
MARIKINA-INFANTA ROAD (PACKAGE B) INFANTA, Engineering Office
QUEZON, K0116+642-K0116+950

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSEAND LANDSLIDES ALONG DPWH - Quezon 1st District
20DK0086 100% 09/04/2020 06/15/2021 55.33% 60.00% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
MARIKINA-INFANTA ROAD (PACKAGE C) INFANTA, Engineering Office
QUEZON, K0117+308-K0177+680
RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,
SLOPE COLLAPSE AND LANDSLIDES ALONG DPWH - Quezon 1st District
20DK0087 100% 09/04/2020 06/15/2021 67.07% 60.00% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
MARIKINA-INFANTA ROAD (PACKAGE D) INFANTA, Engineering Office
QUEZON, K0118+230-K0118+500
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEM
ENT OF VIILP - CALAPAN NORTH ROAD (S00008MR)
20EO0057 DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 35.11% 39.29% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
K0022+500 - K0022+700; K0022+820 - K0022+857.50,
CALAPAN, MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 41.22% 40.00% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
(S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 32.17% 39.29% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
(S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 40.08% 38.77% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 36.51% 38.77% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868
CONSTRUCTION / REPAIR / REHABILITATION /
20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 39.77% 40.00% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 35.64% 38.77% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - DPWH - Cotabato 2nd District
20MC0043 100% 11/24/2020 08/14/2021 34.13% 34.09% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
JCT DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO Engineering Office
K1640+341, PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 100% 11/24/2020 05/24/2021 52.78% 49.45% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
GREENFIELD RD (S00711MN) K1633+100 TO Engineering Office
K1633+175, MAGPET, NORTH COTABATO

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH - Cebu 5th District
20HI0026 100% 03/12/2020 06/09/2020 Final Billing on 100.00% Building 1 storey ₱3,361,050.00
CADARUHAN, BORBON, CEBU Engineering Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH - Cebu 5th District
20HI0029 100% 03/12/2020 06/09/2020 Final Billing on 100.00% Building 1 storey ₱3,361,050.00
BRGY. LAAW, BORBON, CEBU Engineering Office
Process

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHAB
DPWH - Cebu 5th District
20HI0057 ILITATION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, 100% 11/25/2020 05/18/2021 50.20% 50.86% Building 0.5 km ₱14,108,500.00
Engineering Office
CEBU

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH - Cebu 5th District
20HI0068 100% 10/28/2020 01/25/2021 Final Billing on 100.00% Building 1 storey ₱1,901,196.98
BRGY. CADARUHAN, BORBON, CEBU Engineering Office
Process

Key: WA = Work Accomplished TE = Time Elapsed


Total Outstanding Value of Work = ₱1,719,789,558.18

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : 23-Feb-21
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00047

Cordillera Administrative Region Contract Name: Organizational Outcome 1: Ensure Safe and Reliable National Road System -
Asset Preservation Program - Rehabilitation/Reconstruction of Roads with
Engineer's Hill, Baguio City Slips, Slope Collapse, and Landslide - Secondary Roads Cong. Andres Acop
Cosalan Road K0355+100 - K0355+250
Contract Location: Buguias, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED

Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per Major
Dimensions
ID Location Address % Start Completion Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

100%
CONCRETING OF ABANG-QUIMLOONG LOCAL ROAD IN DPWH - Abra District Engineering
19PA0104 BUCAY, ABRA, ABANG-QUIMLOONG, BUCAY, ABRA
100% 06/28/2019 03/17/2021 Final Billing on 97.93% RCP 0.1 km ₱1,978,000.00
Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAMP DPWH - Abra District Engineering
19PA0106 100% 09/07/2019 03/17/2021 Final Billing on 97.67% Building 1 storey ₱1,942,883.91
JUAN VILLAMOR COVERED COURT), BANGUED, ABRA Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING (DUGONG DPWH - Abra District Engineering
19PA0107 COVERED COURT), BUCAY, ABRA
100% 03/07/2019 03/17/2021 Final Billing on 98.25% Building 1 storey ₱1,937,630.83
Office
Process

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND 100%


RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM: DPWH - Abra District Engineering
19PA0117 REPLACEMENT OF PERMANENT WEAK BRIDGES, BIWENG
100% 03/09/2019 05/06/2021 Final Billing on 92.03% Bridges 20 m ₱15,416,451.62
Office
BRIDGE (B04733LZ), ALONG ABRA-CERVANTES ROAD Process

REHABILITATION/RECONSTRUCTION OF ROADS WITH Roads: Construction - Slope Protection


SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0117 100% 11/23/2020 05/06/2021 60.15% 61.82% 41 m ₱59,940,400.71
ROADS, ABRA-KALINGA ROAD, K0444+417-K0444+468, Office Revetment, Retaining Structures,
BARANGAY LINGAS, LICUAN-BAAY, ABRA Wirenet)

REHABILITATION/RECONSTRUCTION OF ROADS WITH Roads: Construction - Slope Protection


SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY DPWH - Abra District Engineering using Structural Measures (e.g.
20PA0118 ROADS, ABRA-ILOCOS NORTE ROAD, K0433+440-
100% 11/23/2020 03/15/2021 96.67% 90.27% Revetment, Retaining Structures,
300 m ₱86,065,447.79
Office
K0433+740, BARANGAY NAGAPARAN, DANGLAS, ABRA Wirenet)

Asset Preservation-Rehabilitation/Reconstruction of National


Roads: Construction - Slope Protection
Roads with Slips, Slope Collapse and Landslide-Tertiary Roads- DPWH - Quirino District
using Structural Measures (e.g.
20BK0059 Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct. Victoria-Kasibu Engineering Office / Cabarroguis, 100% 12/03/2020 08/12/2021 22.91% 15.23% Revetment, Retaining Structures,
0.16 km ₱26,336,128.00
Bdry) - K0363+555-K0363+605, K0375+765-K0375+790, Quirino Wirenet)
K0382+525-K0382+605, K0382+675-K0382+715

BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
20BK0062 CAJEL BR. ALONG CORDON-AURORA BDRY RD (ISABELA 100% 02/28/2020 03/04/2021 99.05% 100.00% (Superstructure) - with Cast-in-Place 30 m ₱57,894,040.52
BDRY-JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles
BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete
DPWH - Quirino District
21BK0021 LUKBAN BR. (B04905LZ) ALONG CORDON - AURORA BNDRY 100% 02/19/2021 10/07/2021 5.99% 6.06% (Superstructure) - with Cast-in-Place 0.89 kms ₱24,178,071.39
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0022 DISINABA BR. (B04906LZ) ALONG CORDON - AURORA BDRY 100% 02/19/2021 09/07/2021 6.51% 6.97% (Superstructure) - with Cast-in-Place 30 m ₱24,177,690.69
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QURINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


Bridges: Construction - Concrete
DUMATATA BR. (B01938LZ) ALONG CORDON - AURORA DPWH - Quirino District
21BK0023 BDRY RD (ISABELA BDRY - JCT DUMABATO) SAGUDAY,
100% 02/19/2021 09/10/2021 6.73% 6.86% (Superstructure) - with Cast-in-Place 30 m ₱26,151,926.30
Engineering Office Piles
QUIRINO

LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and
Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00032 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 07/20/2021 55.89% 54.00% 30 m ₱144,725,875.00
ROADS ABRA - ILOCOS NORTE ROAD, KO431+710 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO431+920
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00033 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 61.55% 60.00% Revetment, Retaining Structures,
5 kms ₱112,953,250.00
ROADS ABRA - ILOCOS NORTE ROAD, KO434+600 - Administrative Region / Baguio
City Wirenet)
KO434+870
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00034 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 59.32% 60.00% 4.4 kms ₱120,697,375.00
ROADS ABRA - ILOCOS NORTE ROAD, KO446+030 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00035 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 63.90% 60.00% Revetment, Retaining Structures,
4.2 kms ₱107,462,400.00
ROADS ABRA - ILOCOS NORTE ROAD, KO447+540 - Administrative Region / Baguio
City Wirenet)
KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA

Organizational Outcome 1: Ensure Safe and Reliable Department of Public Works and
Bridges: Construction - Concrete
National Road Sysytem - Bridge Program - Replacement of Highways - Cordillera
20P00043 Permanent Weak Bridges - Soot Bridge (B00989LZ) along Abra - Administrative Region / Baguio
100% 11/26/2020 10/11/2023 2.42% 7.26% (Superstructure) - with Cast-in-Place 380.00 lm ₱530,757,818.36
Piles
Ilocos Norte Road City

Rehabilitation of Pasig Slaughterhouse (Phase I) at Ilugin St.,


N/A Brgy. Pinagbuhatan, Pasig City
City Government of Pasig 100% 12/12/2018 03/10/2021 83.00% 94.36% Rehabilitation/Building Works 1.00 storey ₱59,238,200.00
Armed Forces of the Philippines /
GB2-PB-03- Construction of the Four-Storey HAG and HTG Building at PMA,
Fort Gregorio H. Del Pilar, Baguio City
Camp General Emilio Aguinaldo, 100% 09/25/2020 11/24/2021 10.84% 19.98% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
20
Quezon City

BSU Project Construction of Two Storey Command Center Building in Batangas State University / Pablo
100% 11/09/2020 06/06/2021 17.19% 17.16% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
No. 2020-255 Batangas State University Pablo Borbon Main I Borbon Main I

BSU Project Construction of Four Storey Student Services Center Building in Batangas State University / Pablo
100% 01/13/2021 05/27/2022 1.24% 0.63% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
No. 2020-260 Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0095 100% 09/17/2020 05/14/2021 71.60% 70.42% 0.5 kms ₱14,474,988.23
K0529+104 - K0529+192, Pinukpuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0096 100% 09/17/2020 07/13/2021 55.90% 56.33% 0.5 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0097 K0492+320-k0492+572, Tabuk City, Kalinga
100% 09/17/2020 07/13/2021 58.27% 56.33% Revetment, Retaining Structures,
0.5 kms ₱14,474,994.34
Engineering Office
Wirenet)

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS


WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO-
DPWH - Surigao Del Norte 2nd
20NG0060 DAVAO COASTAL ROAD, HAYANGGABON SECTION/BRGY. 100% 10/05/2020 03/24/2021 91.78% 88.30% Roads: Construction - Slope Protection 177 m ₱82,484,700.07
HAYANGGABON, CLAVER, SURIGAO DEL NORTE, District Engineering Office
K1195+570 - K1195+747

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS


WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO- DPWH - Surigao Del Norte 2nd
20NG0061 100% 10/05/2020 03/24/2021 90.13% 88.30% Roads: Construction - Slope Protection 227 m ₱66,384,648.43
DAVAO COASTAL ROAD, BACUAG SECTION / BRGY. POB., District Engineering Office
BACUAG, SURIGAO DEL NORTE, K1161+011 - K1161+238

REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS


WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SURIGAO-
DPWH - Surigao Del Norte 2nd
20NG0080 DAVAO COASTAL ROAD CAGDIANAO SECTION/ BRGY. 100% 10/05/2020 03/21/2021 91.00% 89.88% Roads: Construction - Slope Protection 218 m ₱81,382,084.34
CAGDIANAO, CLAVER, SURIGAO DEL NORTE K1195+867 - District Engineering Office
K1196+085

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0084 100% 09/04/2020 06/15/2021 66.74% 63.86% Roads: Construction - Slope Protection 0.191 kms ₱45,153,499.98
INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, Engineering Office
K0116+102-K0116+293

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0085 100% 09/04/2020 06/15/2021 64.95% 63.86% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, Engineering Office
K0116+642-K0116+950

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0086 INFANTA ROAD (PACKAGE C) INFANTA, QUEZON,
100% 09/04/2020 06/15/2021 62.19% 63.86% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
Engineering Office
K0117+308-K0177+680

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0087 100% 09/04/2020 06/15/2021 65.96% 63.86% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
INFANTA ROAD (PACKAGE D) INFANTA, QUEZON, Engineering Office
K0118+230-K0118+500
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 -
20EO0057 K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 44.25% 44.20% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 (S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 47.22% 45.00% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 (S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 46.87% 44.20% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 43.94% 43.61% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 44.28% 43.61% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 45.78% 45.00% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 44.65% 43.61% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DPWH - Cotabato 2nd District
20MC0043 100% 11/24/2020 08/14/2021 39.12% 38.26% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO Engineering Office
K1640+341, PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 GREENFIELD RD (S00711MN) K1633+100 TO K1633+175,
100% 11/24/2020 05/24/2021 57.06% 55.49% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
Engineering Office
MAGPET, NORTH COTABATO

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH - Cebu 5th District
20HI0026 CADARUHAN, BORBON, CEBU
100% 03/12/2020 06/09/2020 Final Billing on 100.00% Building 1 storey ₱3,361,050.00
Engineering Office
Process

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DPWH - Cebu 5th District
20HI0029 100% 03/12/2020 06/09/2020 Final Billing on 100.00% Building 1 storey ₱3,361,050.00
LAAW, BORBON, CEBU Engineering Office
Process

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHABILITA DPWH - Cebu 5th District


20HI0057 TION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, CEBU
100% 11/25/2020 05/18/2021 58.17% 57.14% Building 0.5 km ₱14,108,500.00
Engineering Office

100%
CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DPWH - Cebu 5th District
20HI0068 100% 10/28/2020 01/25/2021 Final Billing on 100.00% Roads: Construction - Slope Protection 0.50 km ₱1,901,196.98
CADARUHAN, BORBON, CEBU Engineering Office
Process

Key: WA = Work Accomplished TE = Time Elapsed


Total Outstanding Value of Work = ₱1,607,313,406.24

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : 05-Mar-21
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00081

Cordillera Administrative Region Contract Name: CLUSTER: ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National
Road System - Asset Preservation Program - Rehabilitation / Reconstruction of
Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads Gov. Bado
Engineer's Hill, Baguio City Dangwa National Road (1) K0342 + 770 - K0342+857, K0343 + 107 - K0343 + 215,
K0347+055 - K0347+150, (2) K0341+104 - K0341+314, K0341+798 - K0341+910, (3)
K0337+621 - K0337+706, K0337+909 - K0337+995

Contract Location: Bakun, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED

Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per
Dimensions
ID Location Address % Start Completion Major Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND Roads: Construction - Slope


RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM: DPWH - Abra District Engineering Protection using Structural Measures
19PA0117 REPLACEMENT OF PERMANENT WEAK BRIDGES, BIWENG
100% 11/23/2020 05/06/2021 82.64% 81.21% 41 m ₱59,940,400.71
Office (e.g. Revetment, Retaining
BRIDGE (B04733LZ), ALONG ABRA-CERVANTES ROAD Structures, Wirenet)

REHABILITATION/RECONSTRUCTION OF ROADS WITH Roads: Construction - Slope


SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY DPWH - Abra District Engineering Protection using Structural Measures
20PA0117 ROADS, ABRA-KALINGA ROAD, K0444+417-K0444+468,
100% 11/23/2020 05/06/2021 80.65% 81.21% 300 m ₱86,065,447.79
Office (e.g. Revetment, Retaining
BARANGAY LINGAS, LICUAN-BAAY, ABRA Structures, Wirenet)

Asset Preservation-Rehabilitation/Reconstruction of National


DPWH - Quirino District Roads: Construction - Slope Protection
Roads with Slips, Slope Collapse and Landslide-Tertiary Roads-
using Structural Measures (e.g.
20BK0059 Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct. Victoria-Kasibu Engineering Office / Cabarroguis, 100% 12/03/2020 08/12/2021 22.91% 15.23% Revetment, Retaining Structures,
0.16 km ₱26,336,128.00
Bdry) - K0363+555-K0363+605, K0375+765-K0375+790, Quirino Wirenet)
K0382+525-K0382+605, K0382+675-K0382+715

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0021 LUKBAN BR. (B04905LZ) ALONG CORDON - AURORA BNDRY 100% 02/19/2021 10/07/2021 20.14% 19.91% (Superstructure) - with Cast-in-Place 0.89 kms ₱24,178,071.39
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0022 DISINABA BR. (B04906LZ) ALONG CORDON - AURORA BDRY 100% 02/19/2021 09/07/2021 23.28% 22.89% (Superstructure) - with Cast-in-Place 30 m ₱24,177,690.69
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QURINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


Bridges: Construction - Concrete
DUMATATA BR. (B01938LZ) ALONG CORDON - AURORA DPWH - Quirino District
21BK0023 100% 02/19/2021 09/10/2021 23.87% 22.55% (Superstructure) - with Cast-in-Place 30 m ₱26,151,926.30
BDRY RD (ISABELA BDRY - JCT DUMABATO) SAGUDAY, Engineering Office Piles
QUIRINO
LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and
Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00032 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 07/20/2021 65.32% 64.67% 30 m ₱144,725,875.00
ROADS ABRA - ILOCOS NORTE ROAD, KO431+710 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO431+920
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00033 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 70.66% 71.85% 5 kms ₱112,953,250.00
ROADS ABRA - ILOCOS NORTE ROAD, KO434+600 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO434+870
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00034 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 71.37% 71.85% 0.16 kms ₱120,697,375.00
ROADS ABRA - ILOCOS NORTE ROAD, KO446+030 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00035 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 72.49% 71.85% Revetment, Retaining Structures,
0.89 kms ₱107,462,400.00
ROADS ABRA - ILOCOS NORTE ROAD, KO447+540 - Administrative Region / Baguio
City Wirenet)
KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA

Organizational Outcome 1: Ensure Safe and Reliable Department of Public Works and
Bridges: Construction - Concrete
National Road Sysytem - Bridge Program - Replacement of Highways - Cordillera
20P00043 Permanent Weak Bridges - Soot Bridge (B00989LZ) along Abra - Administrative Region / Baguio
100% 11/26/2020 10/11/2023 4.67% 7.26% (Superstructure) - with Cast-in-Place 380.00 lm ₱530,757,818.36
Piles
Ilocos Norte Road City

Armed Forces of the Philippines /


GB2-PB-03- Construction of the Four-Storey HAG and HTG Building at PMA,
Camp General Emilio Aguinaldo, 100% 09/25/2020 11/24/2021 10.84% 19.98% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
20 Fort Gregorio H. Del Pilar, Baguio City
Quezon City

BSU Project Construction of Two Storey Command Center Building in Batangas State University / Pablo
100% 11/09/2020 06/06/2021 17.19% 17.16% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
No. 2020-255 Batangas State University Pablo Borbon Main I Borbon Main I

BSU Project Construction of Four Storey Student Services Center Building in Batangas State University / Pablo
100% 01/13/2021 05/27/2022 1.24% 0.63% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
No. 2020-260 Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0095 100% 09/17/2020 05/14/2021 84.11% 83.75% 0.32 kms ₱14,474,988.23
K0529+104 - K0529+192, Pinukpuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0096 100% 09/17/2020 07/13/2021 67.92% 67.00% 0.37 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0097 100% 09/17/2020 07/13/2021 66.20% 67.00% 0.27 kms ₱14,474,994.34
K0492+320-k0492+572, Tabuk City, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0084 INFANTA ROAD (PACKAGE A) INFANTA, QUEZON,
100% 09/04/2020 06/15/2021 75.02% 75.09% Roads: Construction - Slope Protection 0.191 kms ₱45,153,499.98
Engineering Office
K0116+102-K0116+293
RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,
SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0085 INFANTA ROAD (PACKAGE B) INFANTA, QUEZON,
100% 09/04/2020 06/15/2021 76.33% 75.09% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
Engineering Office
K0116+642-K0116+950

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0086 INFANTA ROAD (PACKAGE C) INFANTA, QUEZON,
100% 09/04/2020 06/15/2021 77.18% 75.09% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
Engineering Office
K0117+308-K0177+680

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0087 100% 09/04/2020 06/15/2021 76.05% 75.09% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
INFANTA ROAD (PACKAGE D) INFANTA, QUEZON, Engineering Office
K0118+230-K0118+500
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 -
20EO0057 K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 59.41% 58.48% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 (S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 60.82% 59.55% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 (S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 60.77% 58.48% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 59.41% 57.71% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 58.03% 57.71% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 61.32% 59.55% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 58.44% 57.71% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DPWH - Cotabato 2nd District
20MC0043 100% 11/24/2020 08/14/2021 51.74% 50.38% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO Engineering Office
K1640+341, PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 GREENFIELD RD (S00711MN) K1633+100 TO K1633+175,
100% 11/24/2020 05/24/2021 72.88% 73.08% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
Engineering Office
MAGPET, NORTH COTABATO

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHABILITA DPWH - Cebu 5th District


20HI0057 TION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, CEBU
100% 11/25/2020 05/18/2021 74.18% 75.43% Roads: Construction - Slope Protection 0.5 km ₱14,108,500.00
Engineering Office

Key: WA = Work Accomplished TE = Time Elapsed


Total Outstanding Value of Work = ₱1,374,448,502.23

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : 6-Apr-21
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00048

Cordillera Administrative Region Contract Name: Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network
Development Program Construction of Missing Links/New Roads Baguio-La Trinidad -
Engineer's Hill, Baguio City Itogon - Sablan - Tuba and Tublay, Asin - Nangalisan Jct. - Bayabas - Monglo Jct.
(Section 1 of BLISTT Outer Ring Circumferential Road) Package 1, Benguet

Contract Location: Sablan, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED


Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per Major
Dimensions
ID Location Address % Start Completion Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

Asset Preservation-Rehabilitation/Reconstruction of National


Roads with Slips, Slope Collapse and Landslide-Tertiary Roads- Roads: Construction - Slope Protection using
DPWH - Quirino District Engineering
20BK0059 Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct. Victoria-Kasibu 100% 12/03/2020 08/12/2021 22.91% 15.23% Structural Measures (e.g. Revetment, Retaining 0.16 kms ₱26,653,833.13
Office / Cabarroguis, Quirino
Bdry) - K0363+555-K0363+605, K0375+765-K0375+790, Structures, Wirenet)
K0382+525-K0382+605, K0382+675-K0382+715

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


DPWH - Quirino District Engineering Bridges: Construction - Concrete
21BK0021 LUKBAN BR. (B04905LZ) ALONG CORDON - AURORA BNDRY 100% 02/19/2021 10/07/2021 36.22% 35.06% 0.89 kms ₱24,178,071.39
Office (Superstructure) - with Cast-in-Place Piles
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QUIRINO

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


DPWH - Quirino District Engineering Bridges: Construction - Concrete
21BK0022 DISINABA BR. (B04906LZ) ALONG CORDON - AURORA BDRY 100% 02/19/2021 09/07/2021 39.82% 40.30% 30 m ₱24,177,690.69
Office (Superstructure) - with Cast-in-Place Piles
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QURINO

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


DUMATATA BR. (B01938LZ) ALONG CORDON - AURORA DPWH - Quirino District Engineering Bridges: Construction - Concrete
21BK0023 100% 02/19/2021 09/10/2021 45.10% 39.71% 30 m ₱26,151,926.30
BDRY RD (ISABELA BDRY - JCT DUMABATO) SAGUDAY, Office (Superstructure) - with Cast-in-Place Piles
QUIRINO

LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL Department of Public Works and Roads: Construction - Slope Protection using
20P00032 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL Highways - Cordillera 100% 09/24/2020 07/20/2021 74.87% 76.33% Structural Measures (e.g. Revetment, Retaining 5 kms ₱144,725,875.00
ROADS ABRA - ILOCOS NORTE ROAD, KO431+710 - Administrative Region / Baguio City Structures, Wirenet)
KO431+920
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL Department of Public Works and Roads: Construction - Slope Protection using
20P00033 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL Highways - Cordillera 100% 09/24/2020 06/20/2021 86.11% 84.81% Structural Measures (e.g. Revetment, Retaining 4.4 kms ₱112,953,250.00
ROADS ABRA - ILOCOS NORTE ROAD, KO434+600 - Administrative Region / Baguio City Structures, Wirenet)
KO434+870
DANGLAS, ABRA
LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL Department of Public Works and Roads: Construction - Slope Protection using
20P00034 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL Highways - Cordillera 100% 09/24/2020 06/20/2021 89.21% 84.81% Structural Measures (e.g. Revetment, Retaining 4.2 kms ₱120,697,375.00
ROADS ABRA - ILOCOS NORTE ROAD, KO446+030 - Administrative Region / Baguio City Structures, Wirenet)
KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL Department of Public Works and Roads: Construction - Slope Protection using
20P00035 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL Highways - Cordillera 100% 09/24/2020 06/20/2021 83.90% 84.81% Structural Measures (e.g. Revetment, Retaining 4 kms ₱107,462,400.00
ROADS ABRA - ILOCOS NORTE ROAD, KO447+540 - Administrative Region / Baguio City Structures, Wirenet)
KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA

Organizational Outcome 1: Ensure Safe and Reliable


Department of Public Works and
National Road Sysytem - Bridge Program - Replacement of Bridges: Construction - Concrete
20P00043 Highways - Cordillera 100% 11/26/2020 11/10/2023 6.82% 15.37% 380.00 lm ₱530,757,818.36
Permanent Weak Bridges - Soot Bridge (B00989LZ) along Abra - (Superstructure) - with Cast-in-Place Piles
Administrative Region / Baguio City
Ilocos Norte Road

Armed Forces of the Philippines /


Construction of the Four-Storey HAG and HTG Building at PMA,
GB2-PB-03-20 Camp General Emilio Aguinaldo, 100% 09/25/2020 11/24/2021 10.84% 53.52% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
Fort Gregorio H. Del Pilar, Baguio City
Quezon City

BSU Project No. Construction of Two Storey Command Center Building in Batangas State University / Pablo
100% 11/09/2020 06/06/2021 17.19% 87.14% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
2020-255 Batangas State University Pablo Borbon Main I Borbon Main I

BSU Project No. Construction of Four Storey Student Services Center Building in Batangas State University / Pablo
100% 01/13/2021 05/27/2022 1.24% 23.60% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
2020-260 Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection using


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District
20PL0095 100% 09/17/2020 05/14/2021 99.20% 98.33% Structural Measures (e.g. Revetment, Retaining 0.5 kms ₱14,474,988.23
K0529+104 - K0529+192, Pinukpuk, Kalinga Engineering Office
Structures, Wirenet)

Roads: Construction - Slope Protection using


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District
20PL0096 100% 09/17/2020 07/13/2021 75.10% 78.67% Structural Measures (e.g. Revetment, Retaining 0.5 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office
Structures, Wirenet)

Roads: Construction - Slope Protection using


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District
20PL0097 100% 09/17/2020 07/13/2021 81.09% 78.67% Structural Measures (e.g. Revetment, Retaining 0.5 kms ₱14,474,994.34
K0492+320-k0492+572, Tabuk City, Kalinga Engineering Office
Structures, Wirenet)

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0084 100% 09/04/2020 06/15/2021 90.11% 87.37% Roads: Construction - Slope Protection 0.191 k,s ₱45,153,499.98
INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, K0116+102- Engineering Office
K0116+293

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0085 100% 09/04/2020 06/15/2021 93.45% 87.37% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, K0116+642- Engineering Office
K0116+950

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0086 100% 09/04/2020 06/15/2021 85.76% 87.37% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
INFANTA ROAD (PACKAGE C) INFANTA, QUEZON, Engineering Office
K0117+308-K0177+680
RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,
SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0087 100% 09/04/2020 06/15/2021 83.91% 87.37% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
INFANTA ROAD (PACKAGE D) INFANTA, QUEZON, Engineering Office
K0118+230-K0118+500

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 -
20EO0057 DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 67.90% 74.11% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO
ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 77.32% 75.45% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
(S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 78.10% 74.11% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
(S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 72.50% 73.13% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 78.21% 73.13% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 82.60% 75.45% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 77.30% 73.13% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DPWH - Cotabato 2nd District
20MC0043 100% 11/24/2020 08/14/2021 58.80% 63.64% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO K1640+341, Engineering Office
PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 100% 11/24/2020 05/24/2021 96.87% 92.31% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
GREENFIELD RD (S00711MN) K1633+100 TO K1633+175, Engineering Office
MAGPET, NORTH COTABATO

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHABILITAT DPWH - Cebu 5th District Engineering


20HI0057 100% 11/25/2020 05/18/2021 99.95% 95.43% Roads: Construction - Slope Protection 0.5 km ₱14,108,500.00
ION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, CEBU Office

Key: WA = Work Accomplished TE = Time Elapsed


Total Outstanding Value of Work = ₱1,107,267,563.07

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : 7-May-21
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00021

Cordillera Administrative Region Contract Name:


Convergence and Special Support Program: Special Road Fund - Motor Vehicle
User's Charge (MVUC) as per R.A. 11239-Installation of Road Safety Devices
Engineer's Hill, Baguio City along Cong. Andres Acop Cosalan Road K0301+(-905) - K0304+024 (S00386LZ)
K0312+000 - K0317+533 (S00386LZ) K0318+(-466) - K0342+000 (S00379LZ)

Contract Location: Bokod & Kabayan, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED

Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per Major
Dimensions
ID Location Address % Start Completion Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

Asset Preservation-Rehabilitation/Reconstruction of National


DPWH - Quirino District Roads: Construction - Slope Protection
Roads with Slips, Slope Collapse and Landslide-Tertiary Roads-
using Structural Measures (e.g.
20BK0059 Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct. Victoria-Kasibu Engineering Office / Cabarroguis, 100% 12/03/2020 08/12/2021 22.91% 15.23% Revetment, Retaining Structures,
0.16 kms ₱26,653,833.13
Bdry) - K0363+555-K0363+605, K0375+765-K0375+790, Quirino Wirenet)
K0382+525-K0382+605, K0382+675-K0382+715

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0021 LUKBAN BR. (B04905LZ) ALONG CORDON - AURORA BNDRY 100% 02/19/2021 10/07/2021 36.22% 35.06% (Superstructure) - with Cast-in-Place 0.89 kms ₱24,178,071.39
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0022 DISINABA BR. (B04906LZ) ALONG CORDON - AURORA BDRY 100% 02/19/2021 09/07/2021 39.82% 40.30% (Superstructure) - with Cast-in-Place 30 m ₱24,177,690.69
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QURINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


Bridges: Construction - Concrete
DUMATATA BR. (B01938LZ) ALONG CORDON - AURORA DPWH - Quirino District
21BK0023 100% 02/19/2021 09/10/2021 45.10% 39.71% (Superstructure) - with Cast-in-Place 30 m ₱26,151,926.30
BDRY RD (ISABELA BDRY - JCT DUMABATO) SAGUDAY, Engineering Office Piles
QUIRINO

LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and
Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00032 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 07/20/2021 74.87% 76.33% Revetment, Retaining Structures,
5 kms ₱144,725,875.00
ROADS ABRA - ILOCOS NORTE ROAD, KO431+710 - Administrative Region / Baguio
City Wirenet)
KO431+920
DANGLAS, ABRA
LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00033 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 86.11% 84.81% 4.4 kms ₱112,953,250.00
ROADS ABRA - ILOCOS NORTE ROAD, KO434+600 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO434+870
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00034 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 89.21% 84.81% Revetment, Retaining Structures,
4.2 kms ₱120,697,375.00
ROADS ABRA - ILOCOS NORTE ROAD, KO446+030 - Administrative Region / Baguio
City Wirenet)
KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00035 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 83.90% 84.81% 4 kms ₱107,462,400.00
ROADS ABRA - ILOCOS NORTE ROAD, KO447+540 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA

Organizational Outcome 1: Ensure Safe and Reliable Department of Public Works and
Bridges: Construction - Concrete
National Road Sysytem - Bridge Program - Replacement of Highways - Cordillera
20P00043 Permanent Weak Bridges - Soot Bridge (B00989LZ) along Abra - Administrative Region / Baguio
100% 11/26/2020 10/11/2023 6.82% 15.37% (Superstructure) - with Cast-in-Place 380.00 lm ₱530,757,818.36
Piles
Ilocos Norte Road City

Armed Forces of the Philippines /


GB2-PB-03- Construction of the Four-Storey HAG and HTG Building at PMA,
Camp General Emilio Aguinaldo, 100% 09/25/2020 11/24/2021 10.84% 53.52% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
20 Fort Gregorio H. Del Pilar, Baguio City
Quezon City

BSU Project Construction of Two Storey Command Center Building in Batangas State University / Pablo
Batangas State University Pablo Borbon Main I
100% 11/09/2020 06/06/2021 17.19% 87.14% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
No. 2020-255 Borbon Main I

BSU Project Construction of Four Storey Student Services Center Building in Batangas State University / Pablo
100% 01/13/2021 05/27/2022 1.24% 23.60% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
No. 2020-260 Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0095 K0529+104 - K0529+192, Pinukpuk, Kalinga
100% 09/17/2020 05/14/2021 99.20% 98.33% Revetment, Retaining Structures,
0.5 kms ₱14,474,988.23
Engineering Office
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0096 100% 09/17/2020 07/13/2021 75.10% 78.67% 0.5 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0097 K0492+320-k0492+572, Tabuk City, Kalinga
100% 09/17/2020 07/13/2021 81.09% 78.67% Revetment, Retaining Structures,
0.5 kms ₱14,474,994.34
Engineering Office
Wirenet)

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0084 100% 09/04/2020 06/15/2021 90.11% 87.37% Roads: Construction - Slope Protection 0.191 k,s ₱45,153,499.98
INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, Engineering Office
K0116+102-K0116+293

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0085 100% 09/04/2020 06/15/2021 93.45% 87.37% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, Engineering Office
K0116+642-K0116+950
RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,
SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0086 100% 09/04/2020 06/15/2021 85.76% 87.37% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
INFANTA ROAD (PACKAGE C) INFANTA, QUEZON, Engineering Office
K0117+308-K0177+680

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0087 INFANTA ROAD (PACKAGE D) INFANTA, QUEZON,
100% 09/04/2020 06/15/2021 83.91% 87.37% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
Engineering Office
K0118+230-K0118+500
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 -
20EO0057 K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 67.90% 74.11% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 (S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 77.32% 75.45% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 (S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 78.10% 74.11% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 72.50% 73.13% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 78.21% 73.13% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 82.60% 75.45% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 77.30% 73.13% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DPWH - Cotabato 2nd District
20MC0043 100% 11/24/2020 08/14/2021 58.80% 63.64% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO Engineering Office
K1640+341, PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 GREENFIELD RD (S00711MN) K1633+100 TO K1633+175,
100% 11/24/2020 05/24/2021 96.87% 92.31% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
Engineering Office
MAGPET, NORTH COTABATO

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHABILITA DPWH - Cebu 5th District


20HI0057 TION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, CEBU
100% 11/25/2020 05/18/2021 99.95% 95.43% Roads: Construction - Slope Protection 0.5 km ₱14,108,500.00
Engineering Office

Key: WA = Work Accomplished TE = Time Elapsed


Total Outstanding Value of Work = ₱1,107,267,563.07

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : May 10, 2021
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Contract ID: 21P00074

Cordillera Administrative Region Contract Name: CONVERGENCE AND SPECIAL SUPPORT PROGRAM: Special Road Fund -
Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Asset Preservation -
Preventive Maintenance - Asphalt Overlay (Instapave) along Asin (KM 8) -
Engineer's Hill, Baguio City Nangalisan-Sn Pascual, Tuba, Benguet-La Union Bdry Road K0258+(-351) -
K0282+540

Contract Location: Tuba, Benguet

LIST OF ALL ONGOING CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED

Business Name: PHESCO, INCORPORATED

Business Address: 491 - 495 Quezon Avenue, Quezon City

Contract Date Percent


Contract Contract Name Owner's Name Participation Major Categories of Work Code Estimated Total Cost per Major
Dimensions
ID Location Address % Start Completion Work Category
WA TE
mm/dd/yy mm/dd/yy Refer to Attachment A

Asset Preservation-Rehabilitation/Reconstruction of National


DPWH - Quirino District Roads: Construction - Slope Protection
Roads with Slips, Slope Collapse and Landslide-Tertiary Roads-
using Structural Measures (e.g.
20BK0059 Jct. Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct. Victoria-Kasibu Engineering Office / Cabarroguis, 100% 12/03/2020 08/12/2021 22.91% 15.23% Revetment, Retaining Structures,
0.16 kms ₱26,653,833.13
Bdry) - K0363+555-K0363+605, K0375+765-K0375+790, Quirino Wirenet)
K0382+525-K0382+605, K0382+675-K0382+715

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0021 LUKBAN BR. (B04905LZ) ALONG CORDON - AURORA BNDRY 100% 02/19/2021 10/07/2021 36.22% 35.06% (Superstructure) - with Cast-in-Place 0.89 kms ₱24,178,071.39
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QUIRINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - Bridges: Construction - Concrete


DPWH - Quirino District
21BK0022 DISINABA BR. (B04906LZ) ALONG CORDON - AURORA BDRY 100% 02/19/2021 09/07/2021 39.82% 40.30% (Superstructure) - with Cast-in-Place 30 m ₱24,177,690.69
RD (ISABELA BDRY - JCT DUMABATO) DIFFUN, QURINO Engineering Office Piles

BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -


Bridges: Construction - Concrete
DUMATATA BR. (B01938LZ) ALONG CORDON - AURORA DPWH - Quirino District
21BK0023 100% 02/19/2021 09/10/2021 45.10% 39.71% (Superstructure) - with Cast-in-Place 30 m ₱26,151,926.30
BDRY RD (ISABELA BDRY - JCT DUMABATO) SAGUDAY, Engineering Office Piles
QUIRINO

LOCAL PROGRAM
-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and
Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00032 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 07/20/2021 74.87% 76.33% Revetment, Retaining Structures,
5 kms ₱144,725,875.00
ROADS ABRA - ILOCOS NORTE ROAD, KO431+710 - Administrative Region / Baguio
City Wirenet)
KO431+920
DANGLAS, ABRA
LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00033 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 86.11% 84.81% 4.4 kms ₱112,953,250.00
ROADS ABRA - ILOCOS NORTE ROAD, KO434+600 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO434+870
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00034 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 89.21% 84.81% Revetment, Retaining Structures,
4.2 kms ₱120,697,375.00
ROADS ABRA - ILOCOS NORTE ROAD, KO446+030 - Administrative Region / Baguio
City Wirenet)
KO446+080, KO446+615 - KO446+840
DANGLAS, ABRA

LOCAL PROGRAM -
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT Department of Public Works and Roads: Construction - Slope Protection
OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL
Highways - Cordillera using Structural Measures (e.g.
20P00035 PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL 100% 09/24/2020 06/20/2021 83.90% 84.81% 4 kms ₱107,462,400.00
ROADS ABRA - ILOCOS NORTE ROAD, KO447+540 - Administrative Region / Baguio Revetment, Retaining Structures,
City Wirenet)
KO447+700, KO448+960 - KO449+100
DANGLAS, ABRA

Organizational Outcome 1: Ensure Safe and Reliable Department of Public Works and
Bridges: Construction - Concrete
National Road Sysytem - Bridge Program - Replacement of Highways - Cordillera
20P00043 Permanent Weak Bridges - Soot Bridge (B00989LZ) along Abra - Administrative Region / Baguio
100% 11/26/2020 10/11/2023 6.82% 15.37% (Superstructure) - with Cast-in-Place 380.00 lm ₱530,757,818.36
Piles
Ilocos Norte Road City

Armed Forces of the Philippines /


GB2-PB-03- Construction of the Four-Storey HAG and HTG Building at PMA,
Camp General Emilio Aguinaldo, 100% 09/25/2020 11/24/2021 10.84% 53.52% Buildings: Construction - Low Rise 4.00 storey ₱156,032,720.54
20 Fort Gregorio H. Del Pilar, Baguio City
Quezon City

BSU Project Construction of Two Storey Command Center Building in Batangas State University / Pablo
Batangas State University Pablo Borbon Main I
100% 11/09/2020 06/06/2021 17.19% 87.14% Buildings: Construction - Low Rise 2.00 storey ₱32,637,486.71
No. 2020-255 Borbon Main I

BSU Project Construction of Four Storey Student Services Center Building in Batangas State University / Pablo
100% 01/13/2021 05/27/2022 1.24% 23.60% Buildings: Construction - Low Rise 4.00 storey ₱111,866,216.80
No. 2020-260 Batangas State University, ARASOF-Nasugbu Borbon Main I

Roads: Construction - Slope Protection


Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0095 K0529+104 - K0529+192, Pinukpuk, Kalinga
100% 09/17/2020 05/14/2021 99.20% 98.33% Revetment, Retaining Structures,
0.5 kms ₱14,474,988.23
Engineering Office
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0096 100% 09/17/2020 07/13/2021 75.10% 78.67% 0.5 kms ₱14,474,998.88
K0492+136-k0492+320, Tabuk, Kalinga Engineering Office Revetment, Retaining Structures,
Wirenet)
Roads: Construction - Slope Protection
Mt. Province Bondary - Calanan - Pinukpuk - Abbut Road, DPWH - Lower Kalinga District using Structural Measures (e.g.
20PL0097 K0492+320-k0492+572, Tabuk City, Kalinga
100% 09/17/2020 07/13/2021 81.09% 78.67% Revetment, Retaining Structures,
0.5 kms ₱14,474,994.34
Engineering Office
Wirenet)

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0084 100% 09/04/2020 06/15/2021 90.11% 87.37% Roads: Construction - Slope Protection 0.191 k,s ₱45,153,499.98
INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, Engineering Office
K0116+102-K0116+293

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0085 100% 09/04/2020 06/15/2021 93.45% 87.37% Roads: Construction - Slope Protection 0.32 kms ₱45,525,900.00
INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, Engineering Office
K0116+642-K0116+950
RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,
SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0086 100% 09/04/2020 06/15/2021 85.76% 87.37% Roads: Construction - Slope Protection 0.37 kms ₱46,345,180.00
INFANTA ROAD (PACKAGE C) INFANTA, QUEZON, Engineering Office
K0117+308-K0177+680

RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,


SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA- DPWH - Quezon 1st District
20DK0087 INFANTA ROAD (PACKAGE D) INFANTA, QUEZON,
100% 09/04/2020 06/15/2021 83.91% 87.37% Roads: Construction - Slope Protection 0.27 kms ₱46,131,049.99
Engineering Office
K0118+230-K0118+500
CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT
OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 -
20EO0057 K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 67.90% 74.11% Roads: Construction - Slope Protection 0.3575 kms ₱92,106,348.69
ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0058 (S00008MR) K0024+375.00 - K0024+556.10, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 77.32% 75.45% Roads: Construction - Slope Protection 0.181 kms ₱90,207,527.56
MINDORO ORIENTAL
CONSTRUCTION / REPAIR / REHABILITATION /
IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD
20EO0059 (S00008MR) K0036+180.00 - K0036+302.20, CALAPAN,
DPWH - Regional Office IV-B 100% 11/26/2020 07/07/2021 78.10% 74.11% Roads: Construction - Slope Protection 0.122 kms ₱92,107,090.15
MINDORO ORIENTAL

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0060 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 72.50% 73.13% Roads: Construction - Slope Protection 0.173 kms ₱93,056,219.25
(S00008MR), K0037+300.00 - K0037+473.10

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0061 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 78.21% 73.13% Roads: Construction - Slope Protection 0.168 kms ₱93,056,498.65
(S00008MR), K0039+700.00 - K0039+868

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0062 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/03/2021 82.60% 75.45% Roads: Construction - Slope Protection 0.175 kms ₱90,207,283.22
(S00008MR), K0043+625.00 - K0043+800.40

CONSTRUCTION / REPAIR / REHABILITATION /


20EO0063 IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD DPWH - Regional Office IV-B 100% 11/26/2020 07/10/2021 77.30% 73.13% Roads: Construction - Slope Protection 0.141 kms ₱93,056,553.90
(S00008MR), K0057+800.00 - K0057+941.80

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DPWH - Cotabato 2nd District
20MC0043 100% 11/24/2020 08/14/2021 58.80% 63.64% Roads: Construction - Slope Protection 0.24 kms ₱15,711,141.02
DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO Engineering Office
K1640+341, PRES. ROXAS, NORTH COTABATO

CONSTRUCTION OF ROAD SLOPE PROTECTION


STRUCTURE - ALONG MAGPET-NOWA-DORULUMAN- DPWH - Cotabato 2nd District
20MC0078 GREENFIELD RD (S00711MN) K1633+100 TO K1633+175,
100% 11/24/2020 05/24/2021 96.87% 92.31% Roads: Construction - Slope Protection 0.075 kms ₱48,951,000.00
Engineering Office
MAGPET, NORTH COTABATO

CONCRETING/CONSTRUCTION/IMPROVEMENT/REHABILITA DPWH - Cebu 5th District


20HI0057 TION OF LOCAL ROAD, BRGY. LANIPGA, CARMEN, CEBU
100% 11/25/2020 05/18/2021 99.95% 95.43% Roads: Construction - Slope Protection 0.5 km ₱14,108,500.00
Engineering Office

Key: WA = Work Accomplished TE = Time Elapsed


Total Outstanding Value of Work = ₱1,107,267,563.07

Submitted by :
Name of Authorized Representative : ROBERT T. YNSON, JR.
Position : President / Authorized Managing Officer
Name of Bidder : PHESCO, Incorporated
Date : May 11, 2021