This document provides a costing summary for a 600mm diameter, 10m long gate culvert including item descriptions, quantities, unit rates and total amounts. The main materials are rebar, concrete, excavation, backfilling, formwork and hardcore. The total cost before profit is KSh 679,780 and including a 20% profit margin, the total amount is KSh 815,736.
This document provides a costing summary for a 600mm diameter, 10m long gate culvert including item descriptions, quantities, unit rates and total amounts. The main materials are rebar, concrete, excavation, backfilling, formwork and hardcore. The total cost before profit is KSh 679,780 and including a 20% profit margin, the total amount is KSh 815,736.
This document provides a costing summary for a 600mm diameter, 10m long gate culvert including item descriptions, quantities, unit rates and total amounts. The main materials are rebar, concrete, excavation, backfilling, formwork and hardcore. The total cost before profit is KSh 679,780 and including a 20% profit margin, the total amount is KSh 815,736.
1 rebar T16 rebar 2 2 concrete C25 7.1 3 excavation Inclusive of 30m on inlet side and 150m on outlet 172 4 backfilling 10.6 5 formwork 54 6 Hardcore 9 add 20% for profits Total Amount in KSh Total Units Unit rate Amount in KSh MT 145000 290,000.00 m3 28000 198,800.00 m3 600 103,200.00 m3 300 3,180.00 m2 1200 64,800.00 T 2200 19,800.00 679,780.00 815,736.00 815,736.00 Total