You are on page 1of 1

N

9.14 SITE NO 5
9.14

E
1.50

1.50

1.50
1 1 1

S
1.00

1.00
1.00

SITE NO 9
PROPOSED

SITE NO 7
FIRST FLOOR
13.72

13.72

ON EXISTING
GROUND
A A A A FLOOR

SITE NO 8
1.5

1.55
1.5

FOR FIRST FLOOR AND ON EXISTING


GROUND FLOOR

( DATED:-08-01-1987)

COLUMN REINFORCEMENT
VENTILATING COVERS.

RCC COLUMN (M25)

COARSE SAND
0.85

RCC COLUMN PEDESTAL (M25)


1

RCC COLUMN FOOTING (M25)


0.75

AGGREGATES.
PCC
FOOTING REINFORCEMENT
20MM STONE
SECTION B-B
2.82

FOOTING REINFORCEMENT
0.60
B B
2.82

0.45

AGGREGATES.
40MM STONE
RCC COLUMN PEDESTAL (M25)
RCC COLUMN (M25)
PLAN
TYPICAL CONCENTRIC COLUMN C/S OF RAIN WATER HARVESTING PIT
AND FOOTING DETAILS
NOT TO SCALE.
NOT TO SCALE.

RAIN WATER HARVESTING

You might also like