KEY PLAN

BARRIER & PROTECTION

ACCESS ROAD (Al Mawaqid St)

FOOT PATH TILES FOOT PATH TILES


1.5M 1.5M 19.00M TO 20.00M
07.00M

0.80M
1.20M
PROPOSED DU CHAMBER GRASS AREA ROAD CENTER LINE UNMADE AREA

TYPICAL CROSS SECTION -1:1

2.00
STREET LIGHT POLE

1.00
HDD Entry Pit
HDD Exit Pit
0.0 GRASS AREA GRASS AREA GRASS AREA GRASS AREA
FOOT PATH TILES FOOT PATH TILES
ASPHALT ROAD ASPHALT ROAD
05.00M 09.00M 05.00M

1.50M

1.50M
-1.00

2.50M
2.00M 2.00M
-2.00

-3.00
4Way 110mm HDPE du
Telecom Pipe
-4.00

CENTER LINE
-5.00

-6.00

BARRIER & PROTECTION HDD PROFILE - CROSSING LOCATION -2:2

2.00
STREET LIGHT POLE

1.00
HDD Entry Pit
HDD Exit Pit
0.0
GRASS AREA GRASS AREA FOOT PATH TILES FOOT PATH TILES ASPHALT AREA ASPHALT AREA
ASPHALT ROAD ASPHALT ROAD
05.00M 07.00M 05.00M

1.50M

1.50M
-1.00

2.50M
2.00M 2.00M
-2.00

ACCESS ROAD (Al Mawaqid St) -3.00


4Way 110mm HDPE du
Telecom Pipe
-4.00

CENTER LINE
-5.00

FOOT PATH TILES FOOT PATH TILES -6.00

1.5M 1.5M 19.00M TO 20.00M HDD PROFILE - CROSSING LOCATION -3:3


07.00M

0.80M
1.20M
PROPOSED DU CHAMBER GRASS AREA ROAD CENTER LINE UNMADE AREA

TYPICAL CROSS SECTION -1:1

2.00
STREET LIGHT POLE

1.00
HDD Entry Pit
HDD Exit Pit
0.0 GRASS AREA GRASS AREA GRASS AREA GRASS AREA
FOOT PATH TILES FOOT PATH TILES
ASPHALT ROAD ASPHALT ROAD
05.00M 09.00M 05.00M
1.50M

1.50M
-1.00

2.50M
2.00M 2.00M
-2.00

-3.00
4Way 110mm HDPE du
Telecom Pipe
-4.00

CENTER LINE
-5.00

-6.00

TYPICAL CROSS SECTION


HDD PROFILE - CROSSING LOCATION -2:2

REV.NO. DESCRIPTION BY CHKD. DATE


2.00
STREET LIGHT POLE CONTRACTOR CONSULTANT

1.00
HDD Entry Pit
HDD Exit Pit
0.0
GRASS AREA GRASS AREA FOOT PATH TILES FOOT PATH TILES ASPHALT AREA ASPHALT AREA
ASPHALT ROAD ASPHALT ROAD
05.00M 07.00M 05.00M
1.50M

1.50M
-1.00
2.50M

2.00M 2.00M
-2.00

-3.00 Emirates Integrated Telecommunication


4Way 110mm HDPE du Company (EITC)
Telecom Pipe PROJECT:
-4.00
CENTER LINE

DUCTING INFRASTRUCTURE WORKS


-5.00
DRAWING TITLE:
TELECOM SITES
(Al Dhafrah East-Route Plan )
-6.00 du INFRASTRUCTURE NETWORK
DRAWN BY: NIKHIL CHKD. BY: APPD. BY:

SCALE @ A1: AS SHOWN DATE: 01/07/2021

HDD PROFILE - CROSSING LOCATION -3:3 DRAWING NO:

d u 1 1 1 1 P 2 0 0 - - - - - 0 1 2 0 2 6 A
THIS DRAWING IS A PROPERTY OF du NO PART OR WHOLE SHOULD BE
REV.

REPRODUCE OR COPIED WITHOUT PRIOR PERMISSION FROM AUTHORITY.