Professional Documents
Culture Documents
(Sub-)systems Process
(Sub-)systems Process
(Sub-)systems Process
(Sub-)systems Process
(Sub-)systems Process
(Sub-)systems Process
(Sub-)systems Process
(Sub-)systems Process
PRODUCT STORAGE, HANDLING AND LOADING FACILITIES // ENG-LA: ???; ENG-CS: Astfalk/ECH
1200 71 UREA BULK HANDLING AND DISTRIBUTION
1210 73 BAGGING AND TRUCK LOADING Material
A6G A0G
1220 70 UREA PROCESS PLANT EXPORT / BULK STORAGE IMPORT Handling
1260 EMPTY BAG STORAGE
1360 51 AMMONIA STORAGE
Ammonia Storage
AMMONIA STORAGE (THIS CONSTRUCTION UNIT DESCRIBES THE AMMONIA REFRIGERATION AREA AND A6F A0F
1370 51 & Refrigeration
THE FLARE AREA ONLY)
NON-PROCESS-BUILDINGS
OPERATOR'S ROOM AND INSTRUMENT RACK ROOM AT UREA BAGGING AND LOADING Material Handling A6G A0G
1400 MAIN CONTROL BUILDING WITH LABORATORY Overall A6B A0B
1410 MAIN SUBSTATION Overall A6B A0B
1720 JETTY OPERATION BUILDING Jetty & Shiploading A6H A0H
ELECTRICAL UTILITIES
1420 SUBSTATION O&U Balance of Plant A6E A0E
1430 SUBSTATION TRUCK LOADING Material Handling A6G A0G
PIPE RACKS
1501 NH3 MAIN STRUCTURE INCL. VENT STACK AND AMMONIA FLARE Ammonia A6C A0C
1503 PIPE RACK TO OFFSITE AND UTILITIES Balance of Plant A6E A0E
1504 PIPE RACK /SLEEPER OFFSITE AND UTILITIES Balance of Plant A6E A0E
1505 PIPE RACK / SLEEPER RAW WATER TREATMENT Balance of Plant A6E A0E
1506 CO2 REMOVAL MAIN STRUCTURE Ammonia A6C A0C
1507 PIPE RACK TO UTILITIES Ammonia A6C A0C
1508 PIPE RACK RECOVERY Ammonia A6C A0C
Ammonia Storage &
1509 PIPE RACK / SLEEPER TO REFRIGERATION A6F A0F
Refrigeration
Ammonia Storage &
1510 PIPE RACK TO NH3- TANK A6F A0F
Refrigeration
1511 PIPE RACK / SLEEPER WATER TREATMENT DEMINERALIZATION Balance of Plant A6E A0E
1520 SLEEPER NH3 COOLING WATER Balance of Plant A6E A0E
1525 SLEEPER UREA COOLING WATER Balance of Plant A6E A0E
JETTY SYSTEM
1700 CONVEYOR GALLERY
Jetty
1710 SUBSTATION JETTY & A6H A0H
Shiploading
1730 75 UREA SHIP LOADING
IN-PLANT FACILITIES
40 ANALYZER SYSTEM