Abstract
Deign document that details SCBE2 card upgrade process in the Juniper MX90 Chassis.
Table of Contents
About............................................................................................................................................... 3
Document History ........................................................................................................................3
Contributors .................................................................................................................................3
Introduction ..................................................................................................................................... 4
Scope ............................................................................................................................................... 4
Requirements .................................................................................................................................. 4
SCBE2 Upgrade Process................................................................................................................. 4
Face Plate .....................................................................................................................................4
SCBE2......................................................................................................................................4
Current State ................................................................................................................................5
MX 960 ....................................................................................................................................5
Power Off MX960 Chassis ..........................................................................................................6
Replacing CB 0 ............................................................................................................................7
Replacing CB 1 ............................................................................................................................9
Replacing CB 2 ............................................................................................................................9
Power on MX960 Chassis ............................................................................................................9
Final State ....................................................................................................................................9
References ..................................................................................................................................... 10
Page | 2
About
Document History
This section describes the document changes.
Version Date Author Comment
Contributors
This section lists the contributors to this document.
Name Email
Page | 3
Introduction
To support higher capacity and port density, the next-generation fabric chip card, as known as Switch
Control Board (SCBE2), is introduced for current Juniper MX960 chassis. SCBE2 can support a bandwidth
of up to 340 Gbps per slot with redundant fabric support and 480 Gbps per slot without redundancy.
The detail description can be found on Juniper support document as:
http://www.juniper.net/techpubs/en_US/release-independent/junos/topics/concept/scbe2-mx960-
desc.html
Scope
The scope of this document is to define the upgrade procedure from current SCBE to SCBE2 card over
Juniper MX960 chassis.
Requirements
The SCBE2 only support on 2 following conditions:
Face Plate
SCBE2
Page | 4
Current State
MX 960
SCBE LED
RE0 RE1
CB 0
RE LED
CB 1
CB 2
Page | 5
Power Off MX960 Chassis
1. Engineer should observe LED light off from both routing engine.
2. Move the AC input switch on the chassis above the AC power supply or the DC circuit
breaker on each DC power supply faceplate to the off (O) position.
Page | 6
Replacing CB 0
3. Remove Routing Engine from SCBE card. All connected cables should be removed
before RE swap out.
Page | 7
6. Insert Routing Engine on SCBE2 card and connect management device cables back to
routing engine.
Page | 8
Replacing CB 1
7. Repeat the similar process from Replacing CB 0.
Replacing CB 2
8. Repeat the similar process from Replacing CB 0. No Routing Engine replacement from
this slot. Only SCBE to SCBE2 replacement required.
Power on MX960 Chassis
9. Move the AC input switch on the chassis above the AC power supply or the DC circuit
breaker on each DC power-supply faceplate to the off (—) position.
Final State
10. All routing-engine and SCBE2 cards should be active and management cables are
connected.
Page | 9
References
Upgrading an MX960 SCB or SCBE to SCBE2. Retrieved from
http://www.juniper.net/techpubs/en_US/release-independent/junos/topics/task/installation/scb-
mx960-replacing.html#jd0e1000