Over period of time, various advancements have taken piace in the field of track
maintenance. Manual packing of track has altogether been replaced with machine packing. Life
of rails has improved with use of rail grinding to remove surface flaws and increasing the contact
area. Therefore, with the improvement of technology of track, review of norms of track
maintenance and renewal criteria has been done to suit to the changing conditions of increased
axle load, increased speed of trains and constraints of manpower etc, after discussion in 10th
Extra Ordinary meeting of Track Standards Committee held on 220 June, 2021
Revised norms of track maintenance and criteria of track renewal duly approved by
Board (MI) is given below:
purpose.(Para 702(1)() of
IRPWM 2020)
Service life of| 14 years/400 GMT or on 1) Service life of galvanized
Channel Sleeper condition basis. (RDSO letter channel sleeper 14 years / 800
no. CT/PTX/TSC dated GMT or on condition basis as
07.12.18) decided by Chief Track
Engineer of the Railway,
whichever is earlier, with
replacement of fittings as and
when necessary.
2) Service life of
rubber
components of
galvanized
channel sleeper shall however
be kept as 400 GMT or on
condition basis as decided by
Chief Track Engineer of the
Railway, whicheveris earlier.
The above revision in norms of maintenance and renewal criteria shall come into force
with immediate effect. Zonal Railways are advised to plan track maintenance and renewal based
on above.
CPradeep N a b l l 4
Director Civil Engg. (Plg.)
Railway Board
Copy to: CAO(Con)/All Zonal Railways for information and necessary action please.