Panel Placement
Panel Placement
SLOOP A
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sa 1 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
2 Sa 2 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
3 Sa 3 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
4 Sa 4 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
5 Sa 5 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
6 Sa 6 0.15 12.07 0.00 2.00 14.22 7.85 0.15 8.00 113.76
7 Sa 7 0.15 3.79 0.00 2.00 5.94 5.60 0.15 5.75 34.16
TOTAL 851.76
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP B
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sb 1 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
2 Sb 2 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
3 Sb 3 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
4 Sb 4 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
5 Sb 5 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
6 Sb 6 0.15 12.07 0.00 2.00 14.22 7.85 0.15 8.00 113.76
7 Sb 7 0.15 3.79 0.00 2.00 5.94 5.60 0.15 5.75 34.16
TOTAL 824.16
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP C
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sc 1 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
2 Sc 2 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
3 Sc 3 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
4 Sc 4 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
5 Sc 5 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
6 Sc 6 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
7 Sc 7 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
8 Sc 8 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
9 Sc 9 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
10 Sc 10 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
11 Sc 11 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
12 Sc 12 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
13 Sc 13 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
14 Sc 14 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
15 Sc 15 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
16 Sc 16 0.15 13.65 1.00 2.00 16.80 7.85 0.15 8.00 134.40
17 Sc 17 0.15 5.38 1.00 2.00 8.53 7.85 0.15 8.00 68.24
TOTAL 2,506.08
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP D
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sd 1 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
2 Sd 2 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
3 Sd 3 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
4 Sd 4 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
5 Sd 5 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
6 Sd 6 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
7 Sd 7 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
8 Sd 8 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
9 Sd 9 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
10 Sd 10 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
11 Sd 11 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
12 Sd 12 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
13 Sd 13 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
14 Sd 14 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
15 Sd 15 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
16 Sd 16 0.15 13.65 1.00 2.00 16.80 7.85 0.15 8.00 134.40
17 Sd 17 0.15 5.38 1.00 2.00 8.53 7.85 0.15 8.00 68.24
TOTAL 2,506.08
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
Dasar
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Dk 1 90.85 0.15 0.00 0.00 0.00 91.00 7.85 0.15 8.00 728.00
2 Dk 2 90.85 0.15 0.00 0.00 0.00 91.00 7.85 0.15 8.00 728.00
TOTAL 1,456.00
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP E
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Se 1 0.15 3.79 0.00 2.00 5.94 5.60 0.15 5.75 34.16
2 Se 2 0.15 12.07 0.00 2.00 14.22 7.85 0.15 8.00 113.76
3 Se 3 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
4 Se 4 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
5 Se 5 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
6 Se 6 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
7 Se 7 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
TOTAL 824.16
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP F
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sf 1 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
2 Sf 2 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
3 Sf 3 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
4 Sf 4 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
5 Sf 5 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
6 Sf 6 0.15 12.07 0.00 2.00 14.22 7.85 0.15 8.00 113.76
7 Sf 7 0.15 3.79 0.00 2.00 5.94 5.60 0.15 5.75 34.16
TOTAL 851.76
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP G
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sg 1 0.15 2.27 0.00 2.00 4.42 4.15 0.15 4.30 19.01
2 Sg 2 0.15 10.54 0.00 2.00 12.69 7.85 0.15 8.00 101.52
3 Sg 3 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
4 Sg 4 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
5 Sg 5 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
6 Sg 6 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
7 Sg 7 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
8 Sg 8 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
9 Sg 9 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
10 Sg 10 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
11 Sg 11 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
12 Sg 12 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
13 Sg 13 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
14 Sg 14 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
15 Sg 15 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
16 Sg 16 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
17 Sg 17 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
18 Sg 18 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
19 Sg 19 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
20 Sg 20 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
21 Sg 21 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
22 Sg 22 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
23 Sg 23 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
24 Sg 24 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
TOTAL 3,550.13
PERHITUNGAN PANEL PLACEMENT INSTALASI GEOMEMBRANE
SLOOP H
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Sh 1 0.15 7.54 0.00 2.00 9.69 7.85 0.15 8.00 77.52
2 Sh 2 0.15 15.81 0.00 2.00 17.96 7.85 0.15 8.00 143.68
3 Sh 3 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
4 Sh 4 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
5 Sh 5 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
6 Sh 6 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
7 Sh 7 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
8 Sh 8 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
9 Sh 9 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
10 Sh 10 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
11 Sh 11 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
12 Sh 12 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
13 Sh 13 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
14 Sh 14 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
15 Sh 15 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
16 Sh 16 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
17 Sh 17 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
18 Sh 18 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
19 Sh 19 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
20 Sh 20 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
21 Sh 21 0.15 15.81 2.15 2.00 20.11 7.85 0.15 8.00 160.88
22 Sh 22 0.15 15.81 1.00 2.00 18.96 7.85 0.15 8.00 151.68
23 Sh 23 0.15 10.54 0.00 2.00 12.69 7.85 0.15 8.00 101.52
24 Sh 24 0.15 2.27 0.00 2.00 4.42 4.15 0.15 4.30 19.01
TOTAL 3,550.13
PERHITUNGAN PANEL PLACMENT INSTALASI GEOMEMBRANE BUKIT TUJUH
Dasar
PANJANG LEBAR
NO PANEL PANJANG LEBAR TOTAL AREA
DASAR WASTE SAMBUNGAN SLOPE TANGGUL ANCHOR LEBAR PANEL WASTE SAMBUNGAN
A B C D E F G H=C+D+E+F+G I J K=I+J L=HXK
1 Dk 3 142.85 0.15 1.50 144.50 0.15 7.85 8.00 1,156.00
2 Dk 4 142.85 0.15 1.50 144.50 0.15 7.85 8.00 1,156.00
TOTAL 2,312.00
Akumulasi Installasi Geomembrane = Slop A+Slop B+Slop C+Slop D+Dasar+Slop E+Slop F+Slop G+Slop H+Dasar2
Akumulasi = 19,232.23 m2
Waste Installasi Geomembrane (7%)
Waste = 1346.2562 m2