You are on page 1of 2

Project: ETAP Page: 1

Location: 16.0.0C Date: 04-13-2020


Contract: SN: 4359168
Engineer: Revision: Base
Filename: aku bisa~~~~~~~~~~~~~~ Study Case: ULF Config.: Normal

Alert-Basic Summary Report

% Alert Settings
Critical
Loading
Bus 100.0
Cable 100.0
Reactor 100.0
Line 100.0
Transformer 100.0
Panel 100.0
Generator 100.0
Inverter/Charger 100.0

Bus Voltage
OverVoltage 105.0
UnderVoltage 95.0

Generator Excitation
OverExcited (Q Max.) 100.0
UnderExcited (Q Min.) 100.0

Alert-Advanced Summary Report

% Alert Settings
Critical
Bus Voltage
Line Voltage Unbalanced Rate (LVUR) 3.0
Voltage Unbalanced Factor (VUF) Neg. Seq. 3.0
Voltage Unbalanced Factor (VUF) Zero Seq. 3.0

Branch Current
Line Current Unbalanced Rate (LIUR) 3.0
Current Unbalanced Factor (IUF) Neg. Seq. 3.0
Current Unbalanced Factor (IUF) Zero Seq. 3.0
Project: ETAP Page: 2
Location: 16.0.0C Date: 04-13-2020
Contract: SN: 4359168
Engineer: Revision: Base
Filename: aku bisa~~~~~~~~~~~~~~ Study Case: ULF Config.: Normal

Critical Report

Device ID Type Condition Rating/Limit Unit Operating A Operating B Operating C %Op. A %Op. B %Op. C

Bus17 Bus Under Voltage 0.400 kV 0.219 0.219 0.220 95.0 95.0 95.2

For buses and branches below center-tap transformers, Phases A, B, and C correspond to (1), (2), and (N) respectively.

You might also like