: PJ/01
self-weight of rib
=25[(0.225 x 0.12) +(0.5 x 0.075)]
=1.6125 KN /m/rib
Total dead load
a) Self-weight of rib =1.6125 KN/M/rib
b) Self-weight of pot =1.0 KN/m/rib
c) Finishes =1.2 KN/m2 x0.5 = 0.6 KN /m /rib
d) Partitions =1.5 KN /m2 x 0.5 =0.75 KN/m/rib
TOTAL =3.9625 KN/m/rib
3.9625 DL=7.925
As a UDL on plan = = 7.925 KN/m2
1 𝑥0.5 KN/m2
Live loads
Assume office block
1.25
Live load = =2.5 KN/m2 LL=2.5
1 𝑥0.5
KN/m2
For 150 HP mm +150 TOP mm
Total dead load
a) Self-weight of rib =25[(0.15x0.12)+(0.5x0.15)]=2.325 KN/m/rib
Distribution of loads
𝑀 44.017 𝑥 106
Ast= = = 377.7 mm2 /m Provide
0.95𝑓𝑦 𝑧 0.95 𝑥 460 𝑥 267
2T16
Provide 2T16 (As=402mm2)
Table 3.9
Check for deflection
𝑏𝑤
= 16
Table 3.10 𝑏
Equation 8 Fs=287.75
2𝑓𝑦 𝐴 𝑟𝑒𝑞 2 𝑥 460 𝑥 377.2
fs = = = 287.75 N/mm 2 N/mm2
3𝐴 𝑝𝑟𝑜𝑣 3 𝑥 402
𝑏𝑤
= 𝑏 𝑥 𝑀𝐹=16 x 0.939 = 15.024
Deflection is
Actual span to depth ratio OK
3600
=
267 = 13.48
Since permissible span depth ratio is greater than actual span depth ratio,
therefore beam is safe against deflection.
400 400
¼⇃ ( ) =¼⇃ (267)= 1.106
𝑑
3 𝑓𝑐𝑢 3 30
3.4.4.1 √ =√ =1.063
25 25
0.5 vc < v < vc + 0.4 hence minimum links for the whole length of beam is
𝐴𝑠𝑣
x 0.95 fyv = 0.4 b
𝑠𝑣
=0.4 x 500 =200
Provide
T8 links to be provided @150 mm c/c
T8@150 mm
2.continous hollow
slab
figure
Bending
a) Mid span of 1st and 3rd spans – design as T-section
M=0.09FL=0.09 x 5 = 27.35KNm
Z=0.95 x 264=250.8mm
𝑀 27.35 𝑥 106
Ast= =
0.95𝑓𝑦 𝑧 0.95 𝑥 460 𝑥 250.8
Z=0.95 x 264=250.8
𝑀 33.43 𝑥 106
Ast= = = 305.1 mm2/m
0.95𝑓𝑦 𝑧 0.95 𝑥 460 𝑥 250.8
Provide 2T16 (As=402 mm2/m)
Z=0.95d =250.8
21.27 𝑥 106
As= = 194.07 mm2 /m
0.95 𝑥 460 𝑥 250.8
Shear
Check max sheer stress
a) Max sheer of face of support is
𝑠𝑢𝑝𝑝𝑜𝑟𝑡 𝑤𝑖𝑑𝑡ℎ
V5=0.6F – Wu x
2
0.25
=(0.6 x 60.775) –(12.155 x ) = 34.95KN
2
𝑉𝑠 34.95 𝑥 103
v= = = 0.529 < 4𝑀𝑚𝑚2
𝑏𝑑 250 𝑥 264
nominal links
𝐴𝑠𝑣
Provide T8 links at = 0.56
𝐴𝑠
(0.264+0.125)
= (0.45 x 60.775) –12.155
2
V =22.62KN
𝑉𝑑 22.62 𝑥 103
Vs = = = 0.34 < 4
𝑏𝑑 250 𝑥 264