Professional Documents
Culture Documents
346
0.075 Pan Total
372.7 371.3 6087.0
Grading Curve
100
90
Test
80 Result
Lower
70
Limit
% Passing
60
50
40
30
20
10
0
10 7 4 1
Sieves (mm)
Remarks:
Lab. Technicians
For: Materials Engineer For: The Contractor
MOMBASA - NAIROBI - ADDIS ABABA ROAD CORRIDOR DEVELOPMENT PROJECT PHASE III
UPGRADING OF TURBI - MOYALE (A2) ROAD PROJECT
Grading Curve
100
90
Test
80
Result
70
60
% Passing
50
40
30
20
10
0
0.01 0.1 1 10 100
Sieves (mm)
Lab. Technicians
For: Materials Engineer For: The Contractor