Project: Periodic Maintenance of Chilkaluripet - Nellore section of NH-5 from km 1182.802 to km 1366.547 (length-183.620 km) in the State of Andhra Pradesh
Independent Engineer : AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS PVT. LTD.
6-Aug-20 1226+605 1226+832 R1&R2 0.04 BC-II 4.94 2.655 2.779 4.46 15.05 399.2 13.63 3.15
7-Aug-20 1226+537 1227+000 L1&L2 0.04 BC-II 4.9 2.655 2.777 4.42 15.03 70.63 13.99 3.02
8-Aug-20 1227+000 1227+400 L1&L2 0.04 BC-II 5.01 2.653 2.778 4.5200 15.2 70.47 14.16 3.10
1299+040 1299+400 R1&R2 0.05 BC-I 4.69 2.673 2.777 3.77 14.75 74.48 12.87 2.90
17-Aug-20
1299+850 1299+875 R1&R2 0.04 BC-II 4.90 2.655 2.772 4.22 15.01 71.88 13.86 2.95
1301+058 1301+200 R1&R2 0.04 BC-II 4.99 2.654 2.769 4.16 15.13 72.53 13.82 2.92
1301+800 1301+950 R1 0.04 BC-II 5.02 2.652 2.769 4.23 15.22 72.25 15.85 3.12
30-Aug-20 1302+370 1302+400 R1&R2 0.04 BC-II 4.96 2.652 2.762 4.01 15.18 73.62 15.22 3.12
30-Aug-20 1303+015 1303+100 L1&L2 0.05 BC-I 4.84 2.656 2.778 4.40 15.41 71.48 15.89 2.99
1-Sep-20 1304+140 1304+400 L1&L2 0.05 BC-I 4.80 2.650 2.770 4.32 15.56 72.21 15.20 3.00
3-Sep-20 1304+000 1304+400 R1&R2 0.04 BC-II 4.91 2.645 2.765 4.33 15.34 71.78 14.90 3.01
1305+000 1305+052 L1&L2 0.05 BC-I 4.80 2.648 2.770 4.43 15.66 71.75 15.11 3.07
9/7/2020 1306+240 1306+282 L1&L2 0.04 BC-II 4.88 2.657 2.776 4.29 15.42 72.21 15.84 3.65
1306+400 1306+422 R2 0.04 BC-II 5.00 2.630 2.751 4.40 15.90 72.36 14.58 3.00
10-Sep-20
1306+357 1306+377 R2 0.04 BC-II
1306+282 1306+300 L1&L2 0.05 BC-I 4.80 2.646 2.765 4.31 15.7 72.6 15.49 3.65
11-Sep-20 1307+027 1307+050 L2 0.05 BC-I 4.96 2.640 2.760 4.37 16.05 72.91 14.56 3.00
1307+569 1307+800 L1&L2 0.05 BC-I 4.84 2.650 2.767 4.25 15.62 72.82 14.87 3.04
18-Sep-20 1309+937 1309+960 R1&R2 0.04 BC-II 4.81 2.64 2.76 4.27 15.43 72.36 15.45 3.32
1307+535 1307+569 L1&L2 0.05 BC-I 4.72 2.651 2.765 4.14 15.48 73.26 15.98 3.38
21-Sep-20
1310+730 1311+084 R1&R2 0.04 BC-II 4.95 2.640 2.759 4.33 15.56 72.17 15.17 3.37
Date of Chainage Density Air Stability Density at site
Side Depth Layer OBC Gmm VMA VFB Flow
Laying From To g/cc Voids (KN) g/Cc
1310+556 1310+593 R2 0.04 BC-II
4.94 2.640 2.761 4.40 15.55 71.70 15.34 3.37
1311+084 1311+100 R1&R2 0.04 BC-II
1266+200 1266+300 L1&L2 0.05 BC-I 4.78 2.669 2.782 4.08 15.01 72.81 13.52 3.15 2.752
1265+253 1265+400 L2 0.05 BC-I 2.725
Date of Chainage Density Air Stability Density at site
Side Depth Layer OBC Gmm VMA VFB Flow
Laying From To g/cc Voids (KN) g/Cc
1265+200 1265+253 L2 0.05 BC-I 2.737
4.72 2.670 2.785 4.13 14.86 72.21 14.42 3.38
1265+050 1265+100 L2 0.05 BC-I 2.713
1266+750 1266+800 R1&R2 0.04 BC-II
1315+690 1315+750 R2 0.04 BC-II 4.94 2.649 2.762 4.09 15.24 73.14 14.05 3.50
5-Oct-20 1265+550 1265+610 R1 0.04 BC-II 4.95 2.649 2.770 4.38 15.26 71.30 13.62 3.40
1317+300 1317+440 L1&L2 0.05 BC-I 4.76 2.6695 2.782 4.045 14.91 72.87 14.59 3.34
1263+350 1263+500 L2 0.05 BC-I 4.76 2.674 2.785 4.00 14.78 72.95 14.35 3.42 2.684
7-Oct-20 1263+003 1263+070 L2 0.05 BC-I 2.773
1263+070 1263+100 L1&L2 0.05 BC-I 2.773
1263+200 1263+292 R1&R2 0.04 BC-II
4.92 2.652 2.770 4.37 15.22 71.29 13.78 3.57
1263+292 1263+367 R2 0.04 BC-II
14-Oct-20 1261+500 1261+600 L2 0.05 BC-I 4.77 2.668 2.782 4.10 14.97 72.63 14.15 3.52 2.733
1262+230 1262+350 L1 0.05 BC-I 2.694
1262+230 1262+350 L2 0.05 BC-I 2.774
1261+700 1261+706 L1&L2 0.05 BC-I
1260+600 1260+650 R1&R2 0.04 BC-II 4.95 2.639 2.760 4.38 15.57 71.87 14.50 3.37
20-Oct-20 1325+200 1325+350 R2 0.04 BC-II 4.94 2.643 2.768 4.55 15.44 70.52 14.33 3.35
22-Oct-20 1324+270 1324+300 R1&R2 0.04 BC-II 4.90 2.642 2.760 4.26 15.42 72.36 14.92 3.41
1319+900 1320+000 R1 0.058 BC-I 4.73 2.651 2.778 4.57 15.48 70.49 15.22 3.40
1257+400 1257+440 R2 0.04 BC-II 4.96 2.638 2.763 4.52 15.61 71.03 15.34 3.35
1272+600 1272+700 R2 0.044 BC-II 5.00 2.641 2.765 4.5 15.57 71.1 14.99 3.39
1336+300 1336+450 R1&R2 0.0535 BC-II 4.96 2.638 2.76 4.44 15.63 71.65 14.59 3.44
31-Oct-20
1336+150 1336+300 R2 0.05 BC-II