Contractor Company
NIGERBLOSSOM DRILLING COMPANY LIMITED
Table of Content
1. Objective of the Contract HSE Plan…………………………………………………………………………………..
2. Scope of the Work……………………………………………………………………………………………………………
3. Schedule pf Work…………………………………………………………………………………………………………….
4. HSSE Management System……………………………………………………………………………………………...
4.1 Leadership & Commitment………………………………………………………………………………………..
4.2 Policy & Strategic Objectives……………………………………………………………………………………..
4.3 Organization, Resources and Responsibilities……………………………………………………………
4.4 Risk Management……………………………………………………………………………………………………..
4.5 HSE Planning & Procedures……………………………………………………………………………………….
4.6 Implementation, Monitoring and Reporting……………………………………………………………..
4.7 Assurance (audits/inspections) …………………………………………………………………………………
4.8 Management review…………………………………………………………………………………………………
4.9 Remedial Actions Tracking………………………………………………………………………………………..
5. Appendices…………………………………………………………………………………………………………………….
5.1 Retainership/HMO agreement…………………………………………………………………………………
5.2 Other attachments…………………………………………………………………………………………………..
It is the objective of TECON in this contract to conduct his activities in such a way as to:
Consider first the health and safety of its employees, contractors, and third parties who may be affected.
Protect the environment, prevent pollution, and seek improvements in the efficient use of natural resources.
Ensure that health, safety, and environment (HSE) matters have priority among business objectives.
TECON will carry out this policy through the HWU project action plans supported by management. We shall always require the commitment of all employee in this project to achieve these
objectives.
All our managers and supervisors connected tp this HWO contrat are accountable for the health and safety of those working under their control and are responsible for the promotion
and implementation of all SPDC and TECON policies to the later.
Our goal thrughout this project is to eliminate any form of accidents, injuries and job related illnesses..
HSE objective
On Health, TECON seeks to conduct its activities in such a way as to ensure the health of employees,contractors and third parties.Our management will continually update and implement the
measures necessary to maintain good health of personnels involved in this project.
On Safet,TECON believes that all injuries are preventable and we s h a l l actively promote high standards of safety consciousness through out this contract. We are also committed to
providing high quality equipment, training, and quality PPEs. There are adequate emergency plans to be employed for on various HSE protection.
On Environmental Impact, TECON shall:reduce all emissions and discharges of wastes which have negative impact on the environment. We shall adopt improved technical procedures to ensure
safe operations of all equipments and protect the environment in compliance with relevant l o c a l & international regulations
Our targets in this contract is that; All personnel involved in this project, including sub-contractors shall target of “Zero LTI & Zero leak To Our Environment (Goal Zero target)
The HSE performance during this project shall be monitored continuously by all personnel on board to be championed by Our dedicated HSE Coordinators and HWU supervisors who shall be taking a
statistical records of all HSE Key performance indicators (Kpi) both lead amd lag kpi to monitor and evaluate the status of safety impact throughout the contract
.
2. Scope of the Work
Provide a short description of the scope of works for the contract.
(A diagram to explain the scope may also be provided)
This plan is written for contractor works completed by CONTRACTOR A and their sub-contractors (CONTRACTOR B and CONTRACTOR C). The scope of work covered by this HSE plan includes…The work will
take place at ….The expected number of contractors working on site is…
PROVISION OF THE HWU/ CJU FOR WORK OVER / D & R SERVICES AT LAND OR SWAMP LOCATION IN THE NIGERDELTA REGION
A TYPICAL HAC LAYOUT DIAGRAM OF THE HWOU ON A LAND LOCATION
1
Site visit for wellhead inspection/route survey SPDC/TECON Team
2
Community MOU / FTO settlemet -SPDC CRO/ TECON reps
3
Route / Site Preparation - TECON/spdc team
4
Hotel accomodation / camp setup arrangement- SPDC apprroved hotel/Cateerer Prims cruisons
Equipment premob & certification validation for equipment and personnel(process safety)- SPDC Acredicted Third Party
5
Inspectors/SPDC Premob Teram
6
Mobilse the TECON Cew to the location with a roubust security escort of lead & chase- C&i leasing logistics services
7
Mobilse the TECON Cew to the location with a roubust security escort of lead & chase-C&i leasing logistics services
8
Rig move from TECON base to spdc rigsite(land or swamp by TECON/SPDC approved Rig mover Contractor
13
Function test unit ok for acceptance by spdcteam- HWO Crew
14
Check wellhead pressures and carry out wellhead integrity. Prepare & Mix well kill Brine. HWO Crew
15 ND Xmas Tree, NU BOP / Hanger Landing Joint c/w Kelly Cork /TIW. Test wellhead/BOP connection.
16 Test BOPs.
17 Retrieve CT in hole.
Perimeter Fencing
11
Laying of duramat
12
Camp site preparation
C
Transfer of duramat
13
Manual clearing of location
14
Mechanical stripping of top soil
15
Sand supply, grading and compacting
16
Perimeter Fencing for location
17
18 Laying of duramat
Maintance activities
C well 015 site preparation
Transfer of duramat
13
Manual clearing of location
14
Mechanical stripping of top soil
15
Sand supply, grading and compacting
16
Perimeter Fencing for location
17
Laying of duramat
18
Maintance activities
well 018 site preparation
C
4.0 HSSE Management System (Plan, Do, Check, Adjust Improvement cycle)
The contractor has a documented process, including Procedures and work instructions or an HSSE management system which shows that the Contractor can manage the HSSE
Risk.
This contains information on each of the following 8 elements:
Tecon has a lot of documented process like the HSE CASE, THE HSE MANUAL, THE HSE MS (which contains the 8 elements of theTECON HSE MS) as well as various Standard Operating
Procedures (SOPs) . Also, various Work Instructions Contained in Well Program and specific wort instruction from Shell technical Team are alsoavailable at the work site
Which elements of Leadership & Commitment that you provide to the company would you apply in this contract?
In this HWU PROJECT WEATHER LAND OR SWAMP, the management of Tecon shall provide a visible leadership and commitment to HSE management of the project.
This shall be demonstrated through the participation of various management in our various routine HSE meetings, emergency drill exercise, inspection,Audit as well incident investigation exercise both
at the rig site and base. Other aspects such as briefing and provision of adequate resources for HSE management. L
How will your leadership review HSSE performance data for the contract?
Q3 Q4
EHS MS KEY PERFORMANCE 2020 Q1 Q2
FOCUS AREA TEAM ACTIONS UNIT ACTION PARTY REMARKS
ELEMENT INDICATORS (KPI) TGTS TGT TGT
TGT TGT
Management rig visit Quarterly visit to rigs No. 2 1 1 1 1 EHS Manager/Operations Manager
Incident Management:
Fatality 0, SIC 0; MTC 0; RWC
There shall be ZERO % 100 100 100 100 100 Team Lead and EHSQ Rep.
0, be Zero Incident
Hazards and incident in HWO operations
6 Effects
Management HWO team to develop
Share lessons with Base once
Lesson learnt from Incident No. 8 2 2 2 2 Team Lead and EHSQ Rep.
every Half year
in operations
Review/update Emergency %
7 Response plan for HWO Sign off by EHS manager by Q4 100 100 Team Lead and EHSQ Rep.
activity
Planning
--8
FTW FFD Medical checks %
with approved Hospital for 100% compliance for HWO team 100 Team Lead and EHSQ Rep.
all team members
11 Management Hold bi-annual SQ Review SQ feedback follow-up of actions. No. 8 2 2 2 2 Team Lead and EHSQ Rep.
Review with Client Cascade learnings to field
operations
Leadership shall review the HSSE performance on this contract during the periodic Business Performance Review meetings with SPDC as well as reviewing critical issues during tool box neetings or
pre job safety meetings with all project personnel including sub contractors and shell staff.
How will your leadership commit to safety in this contract and how will you engage staff around Shell’s HSSE rules?
Tecon Oil Services Ltd. is committed to providing and maintaining a safe and healthy work environment for all workers including its contractors, clients, visitors and the public.
All health and safety risk will be assessed, eliminated, or controlled as far as it is reasonably practicable. Our statement of general policy is as follows:
The Health and Safety of workers is first priority in Tecon oil services Ltd. hence accountable for preventing workplace incidents, injuries and illnesses.
Managers and supervisors will be held accountable for the health and safety of staff under their control.
There will be consultations between management and employees for effective implementation of the policies.
Management will provide information, instruction and training in CASHES matters to all categories of staff so as to enhance the awareness of their safety responsibilities
and ensure strong individual commitments and contribution to the health, Safety and Protection of the Environment.
Management will ensure that unsafe conditions, which contribute to injury, damage or operation interruptions, are promptly, reported, corrected and action take to prevent
their recurrence, and all accidents are reported and investigated so that immediate corrective action can be taken.
The company is committed to complying with all national health, safety and environmental laws and regulations applicable to its operations as well as complying with
cliental and organizations requirement to which it subscribes.
All employees, contractors and other persons are expected to perform their duties and responsibilities in a safe and healthy manner and should take reasonable care for the
health and safety of themselves and others to achieve an accident free workplace.
Management will assure adequate resources are available to implement her policy programs.
Management will ensure continual improvement through review and revision of the policies as necessary and at periodic intervals.
Tecon Oil Services Ltd. Has established these HSE policies for the safety of all Tecon stakeholders. All workers, contractors and other persons are to comply with these policies
and participate in health and safety program activities to achieve her goal of zero accident.
CASIMIR MADUAFOKWA
PRESIDENT/CEO
o How will you actively communicate your HSSE Commitment and Policy in the Contract?
Tecon strategic objective and HSSE target for this HWU contract
The strategy for implementation of Tecon Oil Services Ltd HSE policy includes the writing and implementation of annual HSE Plan. The HSE plan implementation is
monitored and serves as tool for continuous improvement process.
Audits, inspections site visits, reviews etc, shall be conducted in a structured manner so as to provide on the spot indication of HSE status of the company at any point in
time.
Our targets is that; all tecon personnels involved in this project, including sub-contractors and xisitors shall attain a target of “Zero LTI & Zero leak to the
The roles of Key officers of Tecon with respect to individuals job responsibilities are outlined in the first Edition of Tecon Oil Services Ltd HSE manual. The organizational structure is as shown
Ensure staff complies with HSE Policies and procedures while on duty
Holding monthly HSE meetings with subordinates.
Conducting site/field inspections and visits.
Arranging competency training for subordinates
Attending monthly HSE meeting with SPDC.
Ensuring that all HSE related information is cascaded down to all staff and subcontractors.
Ensuring that HSE targets against plans are achieved
Ensuring that safe work procedures are followed in execution of jobs.
Tecon contractors are expected to comply with the requirements of our CASHES policy and Manual as they may from time to time be exposed to similar hazards while executing our jobs.
Every subcontractor must:
QHSE MANAGER
The Head of TECON HSE team and provides support to TECON Operations/Project Manager on the HWOU HSE matters.
HWOU Supervisor:
The HWOU Supervisor must possess a current and valid Well Control Certificate.
The HWOU Supervisor will ensure that all HWOU Personnel understand their Well Control Roles & Responsibilities before the Daily Job Work Scope starts - every day/every shift - during the
PTSM. During a well control event, the HWOU Supervisor will be in direct communication
with the Company Representative. The HWOU Supervisor will provide instruction to the HWOU Work Basket Operator (Driller equivalent) and provide guidance to the entire HWOU crew
throughout the well control event. The HWOU Supervisor (or his designate) will operate the choke, during a well control event, as instructed by the client representative onsite.
The HWOU Supervisor will recheck Manifold Valve alignment, with the assistance of the Well
Watch Floorman to monitor for flow through the Choke Manifold/Gas Buster at the Mud Tank.
1) Upon completions of the well kill operations, if flow is detected, the HWOU Supervisor will close the manifold valves and continue Monitoring & Recording Well
Pressures and notify the Chevron WSR.
If no flow is detected, the HWOU Supervisor will notify the Chevron site supervisor.
The HWOU Work Basket Operator must possess a current and valid Well Control Certificate. On noticing a well control situation, the HWOU Work Basket Operator will sounds the Alarm/Horn/Verbal Alarm
with Hand Held Radio and positions the work string box connection at working height in the Work Basket (to be able to stab FOSV & Close). After the FOSV has been installed & closed the HWOU Work
Basket Operator will reposition the work string connection above/below the appropriate BOP Ram and close the BOP Ram using the Work Basket BOP Aux Remote Closing Panel.
The HWOU Assistant Operator must possess a current, valid, Well Control Certificate. HWOU Assistant Operator will assist with lifting, installing & making-up FOSV and standby to follow
instructions from HWOU Work Basket Operator.
The HSE Officer is responsible for identifying relevant environmental legislative requirements and ensuring site activities remain compliant through regular auditing on site.
Facilitate the increase in the level of awareness and commitment to HSE issue s amongst staff
Improve the quality and standard of contractor HSE management
Monitor the implementa tion of the waste management system according to the corporate guide- lines.
Tecon HWU Organizational charts with names and positions for delivering this contract
The CEO of Tecon is respobxible and will ensure that adequate resources are produced for effevtive operation of the project in HSSE competency training, upgrade of
procedures and wprk process to comply with standards requied emergency response capability, audits review and follow up as well as an effective reward xyxtem
HSE Communnication
Communication of HSE issues between the workforce and the line management is done through QHSE meetings, Newsletters, posters, stickers, safety statistics Boards,
Annual HSE Plan and Programs, emergency alarm systems and signals videos, E-mails etc.
Some HSE communication meetings is as scheduled are as shown is the table below
Toolbox Meeting All crew members Daily Pre-job commencement hazard HWO
HWO/marine Crews analysis to ensure inherent hazards Operators/Captain
base Workshop are identified ad controls put in Work Shop Supervisors.
personnel place to ensure accident /incidents
do not occur.
Daily Operations Meeting All Department Daily Discuss daily operations, previous Managing Director
Head / controllers days performance and plans for the
new day. CASHES requirements
with respect to the days job etc
Crew CASHES meeting All crew members One per shift Forums for highlight of CASHES HWO Operators Captain
HWO Marine issues. Dissemination f ILSE /Supervisor
information and cross-fertilization
of ideas amongst individual crews.
Management/sub contractors All sub Bi-annual Review of HSE performance. Managing Director
contractors/Managem Ensure HSE standards and
CASHES
ent advertise improvement strategies
Communication
Forum
TECON mgt is responsible for ensuring that all its equipment used during te HWU operation are tested and certified fit for purpose.
All equipment shall be subject to routine inspection and certification as required.me, “Use of mobile diesel equipment in hazardous area”, and equipment manufacrers specifications.
1. Overloading above
truck tonnage
2. Bad
weather/reduced
visibility
C.1.1. No Overloading of
3. Slippery surface truck, equipment tonnage
Heavy 80% of deck capability
equipment 4. Manual handling
C.1.2. Used Certified trucking
Asset crews with good Behaviour &
5. Un-pre-mobbed
damage Attitude
equipment in use
Community C.2.2. Stop work during bad
unrest / 1.Truck break Injury, M weather/reduced
Loading 6. Improper securing Trucking
issues down
equipment on of load on truck Fatality crew,
P4D C3.1 Good house keeping
Rig Supervisor
Truck/ offloading Theft & 2.Truck hitting (traffic truck,
of equipment on Pilferage 7. Incompetent E3C and contracts,
Accident) Equipment C3.2 Use appropriate safety
other road A3C 1. All truck
trucks operators.
onboard Contractor
users shoe occupants wear
R2D Supv, Truck
Lifting / 8 Dropping objects. seat belts
3.Trip and fall C4.1 Use CERTIFIED crane to driver,
overhead lift heavy equipment. 2. First Aid Kit in
equipment 9. Unconsolidated each craft
land surface. 4. Strain
C.5&8.1. Use certified crane 3. Follow Tecon
for lifting heavy equipment ER Plans
10. Unauthorized 5.Loss of
personnel. C.6.1 Ensure that the load is 4. Flag men
equipment
correctly rigged and secured available at
control with the sling before lifting.
11. Interaction with recommended
Hostile community, C.7.1 Review competency of posts.
6. Drop load
Legacy community personnel.
issues
C.9.1. Consolidate land with
Duramats
C.10.1 Ensure proper access
control.
C.11.1 Ensure FTO is effective
and functional
Printed copies are
uncontrolled
Who / what
Hazard / Recovery
Task steps Threats Top event Consequences may be Inh. Risk Barriers/Controls Action Party
Source harmed measures
Rig Supervisor
C.1 Ensure that all the
and other
equipment on the deck is
Contractors
secured by heavy duty ropes.
Supv Truck
Unsecured loads on Captain,
Truck C.2 Assure no free lines or
hoses attached to the truck.
Loosed hoses/lines
attached to barge
Heavy C.4.1 Only essential
equipment Walkway personnel to be around
Wrong position of Drop equipment loading area.
Restricted personnel relative to
other equipments, Collision C4.2 Condon off hazardous R.1 1st Aider/
space
lines/hoses. Equipment area and station warning sign MEDEVAC
Asset capability to be
Lifting Uncontrolled Equipment on truck.
approach, non damage C.5.1 Ensure proper access strategically
Spotting of unavailable
observance of safety control positioned on site
equipment Equipment Personnel
warnings, negligence, Injury for quick response.
Failure lack of site visit,
Loss of on board C.6.1 Ensure effective PMS,
unavailable location containment R.2 ER plan in
map. C.6.2 Use Go-No-Go gauge place
Poor maintenance, and walk the line.
Hydrocarbon equipment mismatch,
under pressure incompetent operator, C.6.3 Review competency of
crane failure. operators.
Collision with Xmas
tree & flow lines. C.7.1 Condon off work area
Make up lines and High pressure 1. Use of wrong Flying pipe- Injury/fatali Personnel C.1.1 Use of 1502 connection 1. Adequate first Rig Supervisor
pressure test connections works ty C.1.2 Securing of pipe-works
aid Ambulance
Equipment for no movement 2. MEDEVAC Contractor
Leaks Equipment Supv
2. Improper C.1.3 Use of separate 3. Activate ECR
damage
isolation of walkway for pressure lines
valves and hoses,
C.1.4 Only certified
equipment to be used, all
3. Human error pressure lines to be properly
secured in the event of line
failure.
C.2.1 Hold pre-job talk on
release of pressure
C.2.2 Proper positioning of
personnel relative to line of
pressure release.
C.2.3 Properly isolate all
pressure sources before
installing or removing
gauges.
C.3.1 Competent WI
personnel to carryout task
Use of hand 1. Using the wrong Strain, Harm to Injury Personnel Low 1. Follow established work R1 1st Aid by a Rig Supervisor
tools. tool for a job personnel carrying P1-D procedures/methods. trained 1st Aider
2. Worn out or out job. 1, 2 & 4. Check tools among crew. Contractor
defective tools inventory for R2. MEDEVAC Supv
3. Incompetence on quality/adequacy before
correct application mobilisation to worksite.
of the particular tool 3. Only competent
being used personnel to be deployed on
4. Non-availability job.
of required tools
Hydro-carbon 1· Ignition sources - Fire and Major Personnel High C.1.1 Make available and use
at surface and from unsafe explosion Injury/Fatal carrying P4-D gas testers & stop work when
on cellar pit. cameras/ lighters ities, out the A3-C not safe to continue.
and use of hand tools
Environme various E2-C
etc. C.1.2 All potential sources of
ntal Impact activities R2-C
2. Metal to metal ignition - GSM, unsafe
on cameras not allowed on site.
contact. R1 1st Aid by a
Asset.
trained 1st Aider
3. Valve/Equipment C.2.1 Only use non-spark
among crew. Rig Supervisor,
failure· hand tools, and rubber apron,
hand gloves. Handle tools
R2. MEDEVAC
4. Human error· Contractor
firmly to avoid metal to metal
R3. Spill Supv,
contact.
Response Plan in
C.3.1 Proper isolation of place.
valves and pre-mobbed
equipment should be use. R4. Tested fire
fighting
C.4.1 Ensure Operators equipment on
competence / Competent site.
supervision.
Mixing of Spill
Loss of
chemicals and Personnel
containment
Cement Chemical spill
C.1&2.1 Use certified
1. Incompetence Burns competent operator R1. Contain spill Pumping
Assets C.3.1 Inspect tanks before with boom Operator/Rig
2. Human error. Corrosion mobilization
Supervisor
R2. Provide eye
C.4.1 Condon off the
3. Hole in tank wash / shower
hazardous area and restrict Contractor
movement to essential
4. Presence of R3 1st Aider Supv Barge
personnel.
unauthorised person among crew. Captain,
Dust inhalation
R4. Provide and
use Hand-gloves,
goggles and
coverall
R5. Use
neutralisers to
reduce corrosive
chemical as low as
reasonable
practicable
Pumping
/Wireline
C.1.1. Ensure all guards are
Operator /Rig
in place and secure.
R1 1st Aid by a Supervisor
Personnel C.1.2 Barriers and warning
Moving parts Personnel trained 1st Aider
1. Unrestricted contact with Injury signs displayed, Contractor
of HWU unit access trapping among crew.
moving parts Supv
R2. MEDEVAC.
Wireline
R1 1st Aid by a Operator / Rig
Personnel
C.1.1 Pre-mob of CT Unit. trained 1st Aider SUpervisor
injury Crew
Implement preventive among crew.
Wireline under Wireline unit members
maintenance plan R2. MEDEVAC. Contractor
tension and hydraulic failure Parted coil Asset
Coiled Supv
high pressure damage
Operator error C.2.1 Only competent R3. Spill
tubing operator to operate CT Unit. Response Plan in
place
C.1.1. Competent
Operators
Bleeding down N2 Noise above Loss of Injury to
Noise 1. Bleeding down
gas from CT too fast 85db hearing personnel
C.1.2 Enforce use of Ear
muff by all operators.
Crane
Rigging down operations & 1. Use of un-pre- Dropped Fatality/dro Personnel C.1.1. Use pre mobbed crane R1. Use CSR
lifting of heavy mobbed crane objects wning appropriate
C.1.2 Detailed plan for Rig Supervisor
loads. PPEs – hard hat,
spotting lifts and identifying
2. Incorrect use of Equipment safety
routines for awkward areas Crane Operator
Working at Slipping / Injury shoes/boot
crane of rig down
height tripping
HSE officer
Damaged C.2.1. Use of certified crane
3. Slippery Man over asset operator.
surface(oily) R2. All personnel
Adverse board swim certified
weather C.2.2. Regular inspection of
conditions slings
4. Damaged rails
C.3.1 Good house keeping R3. First aider to
Heaving of 5. Unstable platform
tides be onsite
6. Negligence or C.4.1 Hazardous area
Dizziness R4. Wearing of
cordoned off with signs and
certified work
barriers.
7. Multiple signalling vest
C.5.1 Stable / strong
during lifting protected work platform
operation R5. MEDEVAC
(having firm /strong floor &
guard rails), otherwise
provide moveable gratings &
secure stabber with safety
Printed copies are
uncontrolled
Who / what
Hazard / Recovery
Task steps Threats Top event Consequences may be Inh. Risk Barriers/Controls Action Party
Source harmed measures
Harness.
C.6.1 Avoid standing under
suspended loads and ensure
intermittent breaks
R.6 Use of
C.7.1 Only qualified banks-
adequate PPE-
man to control all lifting Hardhat
operations
RIH & make-up Slip-Trip 1. Slippery surface Fall on same Injury Personnel Medium C.1.1 Immediate clean-up of > MER Capability HWU Site
of landing joint hazards 2. Poor house keeping level on work oil spills on work areas. > Proper Supervisor
platform C.1.2 Use of slip-resistant Housekeeping. Client Rep
safety shoes/workboats.
C.1.3 Equipment maintenance
to prevent oil leaks.
C.2.1 Good Housekeeping.
C.2.2 HSE Intervention culture
for UA/UC.
C.2.3 Pre-start worksite
inspection by crew leads.
Flammable 1. Loss of well control Fire / Explosion Explosion, > Personnel High C.1.1 Maintain Well Control > Ensure presence Rig Supervisor
hydrocarbon Fatality carrying out according to Workover of first aider & OH Client Rep
gas in 2. Ignition Sources
Asset task Program and full compliance nurse on site.
atmosphere. 3. Built up pressure in damage > Assets - with the DWPM. > Medevac
annulus Well, MVs. C.1.2 Gas detectors and capability.
alarms. > Fire fighting
C.1.3 Competent Personnel - capability on site.
IWCF/WIPC Certification for > Facility
Break-up and Manual 1. Poor Lifting Physical strain Injury Personnel Medium C.1.1 Strict adherence to > First Aid Rig Supervisor
laying down of handling of techniques. & stress, loss of manual handling procedure > Medivac Client Rep
hanger/ tubings materials & 2. Ill health control C.2.1 Personnel to posses Procedure
Equipment
Medium
Injury to Personnel,
Dropped personnel, Well
Dropped Objects damage to C.1.1 Loose hand tools lanyard
Object (hand Use of wrong / faulty equipment,
tools in hole, to user
tools injury to C.1.2 Loose hand tools
hanger/tubing
from height) 2. Lifting Equipment Well maintained on user in a
failure > Proper
carrying bag.
personnel
C.1.3 HSE Intervention culture
positioning
for UA/UCs
relative to defined
C.1.4 Covers for holes on work
drop zone. Rig Supervisor
floor.
> MER Capability. Client Rep
C.2.1 Certified lifting
> Covers for holes
equipment. / Pre-use
on work floor.
inspection program.
> HSE Intervention
C.2.2 Pre-star audit of rig-up &
culture for UA/UCs
all P1 actions from prestart
audits closed before start-up.
C.2.3 Competent service
personnel.
Overhead 1. Failed hydraulic Dropped Pipe / Injury to Injury to Medium C.1.1 Valid equipment > Proper Rig Supervisor
tool
power pack personnel, personnel, personnel Client Rep
damage to damage of positioning
2. Poorly strapped pipe
equipment equipment equipment relative to defined
certification / Pre-use drop zone.
inspection program. > MER Capability.
C.1.2 Up-to-date maintenance > HSE Intervention
service record. culture for UA/Ucs
C.2.1 Competent Riggers /
Supervision and Competent
operators.
C.2.2 Procedures for carrying
out activity.
Lifting Operations
Lifting operations Lifted Load 1. Adverse Weather Equipment Dropped WI C.1.1 Use of Lifting Plan Personnel Rig Supervisor
Instability load. Personnel positioning away Client Rep Crane
Lifting
carrying out C.1.2 Fuctional lifting safety from potential Operator
equipment
activity / critical equipment on cranes / drop zones.
Asset lifting devices.
Restriction of
C.1.3 Procedure for lifting access to drop
operations in adverse weather zone.
conditions.
MER capability
Pressure Injury to
discharge personnel Personnel C.1.1 Wash valve with hose
carrying keeping off from the line of Proper
Pull ball valve to Trapped Debris on top of valve. out the fire. positioning of Rig Supervisor
work window and pressure task. personnel, Client Rep
connect TIW C.2.1 Ensure key for TIW
valve Unable to pump valve valve is handy to close valve First aid,
open
C.3.1 Lower string below Medivac
surface and retrieve valve
with slickline
Unable to retrieve
valve with slick line C.3.2 Work string and allow
pressure to release gradually.
Allow for some time to
achieve th
Provide a list of any specific operational procedures that act as controls and recovery measures identified in “Risk Management” section above.
BELOW IS A List of operational procedures to be employd as control and recovery measures to identify Risk Mangement in this cotract are as follow:
list of available Task Risk Assessment’s relevant for the scope of work to be done?
Provide details of Shell procedures that you utilize in work planning and your role in the application of these – such as PtW.
The SHELL PTW system is used for all work that may adversely affect the safety of personnel, the environment or the HWU unit. It is used for activities that may
require some form of safe job analysis prior to work commencing. The PTW system is used where 2 or more individuals or groups need to coordinate the activities in
order to work safely or where there is transfer of work and responsibility from one group to another.
HSE COMMUNICATIONS Communications is an important part of having a well-trained, well-managed company. Everything in the HSE-MS has a communication
component. For example. Permit to work, Stop card system, Manuals & Procedures, Documents, Quality Management System, Contracts terms, Reports. Direct
Communication, Audit, Employee Contract, HSE Meetings, HSE Committee Meeting,Weekly HSE Meeting, Pre Job Meeting,Daily Supervisor and Client Meeting:
List of equipment for the job and their premob status were applicable
How security will be managed via approved security plan for the project.
SECURITY PLAN
All Tecon business continuity is sensitive to the security of employees and assets. Within the framework of Tecon security plan, Tecon has a robust process for Security
management in its operations.
An annual security plan is developed and maintained throughout the year. Complimentary activity specific security plans are prepared to address realities that exist now
but were not anticipated in the masterplan.
P A R
Provide details for Emergency Response during the work or flow process with emergency contact numbers as well as drill plans to test effectiveness of the Emergency Response procedure
EMERGENCY RESPONSE DURING THE WORK OR FLOW PROCESS WITH EMERGENCY CONTACT NUMBERS AS WELL AS DRILL PLANS
1. Raise alarm by shouting “fire and the location” thrice to alert others.
2. Activate the nearest fire alarm.
3. Contact the emergency response coordinator, THE BASE MANAGER (08033169758) or THE GROUP HSE MANAGER (0803212579)
4. Fight the fire with an extinguisher only if you are trained and if it is a small fire, else shut the door, and exit the building.
5. All personnel should close the door, leave the building and assemble at their respective muster area and wait until the emergency response team member announces that it is safe to re-enter.
6. The fire emergency response team will take control of the scene and initiate the following fire fighting procedures:-
i. Call external fire services for help;
ii. Disconnect utilities and equipment unless safety will be jeopardized
iii. Coordinate an orderly evacuation of all personnel to the muster area.
iv. Fight the fire with appropriate extinguisher using the PASS (Pull, Aim, Squeeze, and Sweep) method.
v. Perform an accurate head count of personnel and visitors at the muster area.
vi. Provide external fire station with the necessary information about the location.
vii. Call first aiders if injury is sustained and activate Medevac if required.
viii. Call the retainership company clinic ( Ponyx Hospitals Ltd. on 08120958409, 08131630959 )
ix. Prepare report and review the emergency response.
Remain calm.
Assess the scene for danger; first ensure your safety then that of the casualty.
Put on suitable personal protective equipment before coming in contact with the victim.
Assess casualty for verbal or tactile response.
Call the company hospital / clinic.
If he is breathing, place him in recovery position and wait for the ambulance.
If casualty is unresponsive or unconscious. Place your hand near the victim’s breathing zone to check for respiration. Do not move the person’s head or neck in the process.
Check the casualty’s airway and open it by tilting head back.
Check for serious bleeding, shock, fractures, or dislocation.
If casualty is not breathing commence cardiopulmonary resuscitation (CPR) i.e. 30 chest compressions followed by 2 breaths.
Immediately breathing is established place casualty in recovery position and monitor continuously.
Keep the injured person calm and warm to conserve body temperature.
Do not attempt to give any liquid or food to the casualty.
As soon as the ambulance arrives, move (3 persons supporting the head, back and legs) casualty to the hospital for further assessment.
Contact victim’s relation as soon as possible.
Ponyx Hospitals Limited. Plot 26 Presidential Estate GRA III. OPP 08120958409, 08131630959 Dr. & Dr. Mrs. Obi Pius Umeh
NDDC Head Quarters, Aba Rd. PH
No. 3 Tombra Close off Airport Road. Warri, 07031546777, 08112914441
Winners Clinic Delta State
Printed copies are
uncontrolled
CONTINGENCY PLAN FOR ENVIRONMENTAL INCIDENTS
Conduct accident debriefing / safety meeting and document meeting on daily logs and safety meeting logs.
Bridging document for the Interface document of the Contractor and Shell Management systems during the project duration (ONLY FOR MODE 2 MEDIUM/HIGH RISK CONTRACTS)
BRIDGING DOCUMENT BETWEEN MARINE SERVICE PROVIDER SPDC & TECON SHALL BE PROVIDED FOR MARINE
OPERATION
Fat
ality
0 Injury
Loss Time
0
Restricted Work Case
0
Medical Treatment Case
2
First Aid Case
2
Motor Vehicle Accident
2
Fire Incident
0
Near Miss
6
Safety Observations (STOP Cards)
11,172
.
2019 TECON GROUP INCIDENT TRIANGLE
Incident Reporting:
Incident Report provides a format for reporting vital information gathered during the incident investigation procedure, and the recommendations for the corrective and preventive
clear and concise way. The incident report shall be submitted with all the evidence such as photographs, witness statement and other relevant documents.
Incident Database:
the HWU Rig site shall update and maintain the incident database or tracker for their operations at TECON base.. the overall incident database shall be updated and maintained by the HS
at the base. This database shall be reviewed for statistical analysis in order to determine the areas of improvement.
How will you report, and close out unsafe situations and actions identified during work completion on the contract?
Printed copies are
uncontrolled
Unsafe situations are track our STOPCARDS and they are identified through Auditing during work completion in the following way
TECON recognises that a high proportion of accidents results from unsafe acts by individuals. The unsafe act indicates lack of training of the individual, improper work practice
procedures or improper implementation of the Management System. It is very important that TECON installation management are proactive to identify the unsafe act, conduct audit on
implement corrective actions on it
The aim of the unsafe act auditing are to:• Reduce the potential accidents • Improve communication and understanding of the work activity• Improve the cultural attitude towar
Reaffirm and approve the accepted standards of safet• Identify the need of training requirements to individuals• Identify the need of change in work procedures
How will you report each incident with a consequence (injury, product loss, asset damage) related
In this contract, Tecon shall employ a 100% incident reporting policy (as well as involving SPDC/TECON Mana
i r e s p e c t i v e o f t h e c o n s e q u e n c e r e l a t e d u s i n g t h e Incident Notification, Investigation, Reporting and Review approach .
How will you investigate each incident with a consequence, and will you allow Shell to be involved in the investigation especially
In this contract,, the level of the investigation is based on the incident's potential rather than the actual consequences
.The SPDC DSV/ HWU SUPV shall assign investigation team to investigate any incident with consequencce, All serious accidents
and potentially serious incidents shall be investigated and analysed, and lessons learned from those investigations shall
be communicated and corrective actions implemented.
The Investigation team shall include the SPDC DSV, HSE COACH, HWU SUPV, Line Supervisor, Safety Officer, All Investigations shall be
conducted as per TECON Incident Notification, Investigation, Reporting and Review Standards. An incident investigation shall follow logical
process starting with the evidence gathering in order to determine the Critical Factors, which in turn are used to establish the immediate and root
cause of the incident.
Once the root cause has been established, the immediate action plan shall be formed and put in place to reduce the possibility of reoccurrence to
as low as possible, Once all the root causes are identified and analysed, it is imperative that the corrective and preventive actions are identified
and an action plan is developed. The corrective and preventive actions should be specific, measurable, achievable, realistic and time bonded
Incident Review and Follow-Up:
Incident Review for all incident having high potential to cause a serious injury or fatality, shall be held for all TECON installations. The report of the review meeting shall
be submitted to the TECON management by the HWU SUPV.
Below is a typical incident invvestigated using the tecon tree why approach to proffer the root cause of the incident
;
5 Why Investigation
Problem Statement/Critical Event: Ambulance suddenly had brake failure in an attempt to move IP to retainership clinic.
Estimated Total Business-Wide Cost:
Recommended Solution: There should be a weekly vehicle check on the ambulance with documented evidence.
Latent Issues: Observed no documented evidence to show weekly checks carried out on the ambulance.
Why Questions 3W2H Answers Evidence Solution
(with what, when, where, how, how much)
1. Why did the ambulance brakes suddenly fail Because the hydrualic hose for the brake system burst The brakes did not work Hydrualic hose should be replaced
2. Why Did the hydrualic hose burst Because the ABS system is fualty No documented eveidence Ensure daily checks and test run on the ambulance.
5. Why did Management not respond promptly to the Management claimed it took a while to order the parts A maintanance store should be created for spares so
The ordered parts did not arrive early
request to repair the faulty ABS system with which to work on the faulty ABS system. response time will be reduced
A case of a Medical Treatment Case, HiPo incidents, a product release > 10 kg or important asset damage?
Which proactive and reactive KPI’s will you track on the contract to demonstrate effective HSSE control and performance?
.
HSE Performance Monitoring
TECON HSE performance monitoring Indicators (others could be added as applicable)
Emergency Response Exercises / Drills Participation On The Rig Per/Schedule 100% Every 2weeks
Equipment Inspection And Certification Per/ equip 100% Per project campaign
Fitness To Work Tests For All Onshore/Offshore Based Personnel All Personnel 100% Yearly
LAGGING INDICATORS
Total Recordable Occupational Illness Frequency (TROIF) Per project campaign 0 Yearly
Competence Assurance:
During the execution of the work, TECON must monitor the continued competence of the Service Provider, Contractor or Supplier. This refers to any associated
training commitment undertaken.
TRAINING RECORDS FOR DRIVERS DDC& OTHER COMPETENCY CERTIFICATIONS SHALL BE SHOWN TO SPDC CONTRACT OWNER ON QUATERLY BASIS
How will you assure effective “learning from incidents” towards all operational staff (including to sub-contractors) with as a minimum the “learning from incidents”
supplied by Shell or provided from other companies?
BY CASCADING SUCH INCIDENT & DISCUSING LEARNING FROM SUCH INCIDENT TO THE OPERATING STAFFS THROUGH HSE ALERTS AND OTHER SAFETY BULLETTINS
EG THE APALACHIA SINGLE POINT OF FAILURE WITH HWU OPERATION INCIDENT IN 2018 AT CANADA
How will you provide competence assurance around critical positions identified on the contract?
BY CLOSE Monitoring TO include a verification that the Service Provider complies with his management system that may include:
Competence and Close monitoring of the replacement of personnel.
How often will this be and which elements will you review to drive continuous improvement in your HSSE performance?
Bi-annualy we intend orgamising a business performance review (BPR) of the project with SPDC
The forum at which the whole project management system is discussed with a view to:
Management shall provide strong visible commitment, leadership and personal involvement in Health Safety and the Environment. Management shall make available the resources
necessary to achieve our HSE objectives.
1.1 Commitment
management system
LEVEL 3 Managers are fully aware of the high Senior managers are not visibly involved in HSE meetings.
priority areas for improvement and status
This particular aspect of the of action plans. Investment is HSE seen Resources are not generally available.
management system is being as good business sense. Resources
addressed systematically. generally available. Importance of HSE is properly communicated
Reaching the respective targets.
Employees actively participate.
Integration with other activities
initiated Write stop cards and encourage their subordinates to do so
ED says, Include action points in the HSE meetings to be reviewed @ management meetings at the
end of the year.
SCORE: 3
1.2 Leadership
management system
ED says that we are working on making our present environment properly laid out to properly
encourage the HSE culture.
SCORE:3
Develop and communicate policies demonstrating a commitment to HSE that is consistent with, and at least equal to other business aims. Supporting objectives shall be
defined, deployed and maintained at all organizational levels.
2.1 Policies
LEVEL 3 Good awareness and sensible Work force should be properly inducted, on HSE policies on regular basis.
This particular aspect of the application of all policies. Department HSE meetings should he carried out to pass on the knowledge.
management system is being
addressed systematically. There should be controlled copies of the HSE MS containing the polies of HSE held by all managers and
Reaching the respective heads of departments, where once there are new polies the previous ones should be returned and the
targets. new copies distributed again.
Integration with other activities Inductions should be carried out, e.g. by clients
initiated
HSE guidelines should be pasted in various areas as can be seen in MFS office, or previously in
cooperate office. This should be placed at the new work shop after the completion.
Even though we have a good percentage of our staff as field enabled and the field staff get proper HSE
policy trainings meaning we are generally having a good percentage of staff working eith good policy
review
SCORE: 3
Tecon Oil Services ©2017
2.2 Objectives
Integration with other activities Mr Jude said that the managers are fully aware but the problem is that the rest of the staff are
initiated not aware.
Even though the staff don’t know the objectives, the managers. Who are their leaders are
aware and can lead to the target accordingly.
SCORE: 3
Tecon Oil Services ©2017
3. Organisation, Resources, and Documentation
Define, document, and communicate the roles, responsibilities, and accountabilities to enable every individual to fulfil their role in improving Health, Safety and Environmental
performance.
LEVEL 4 HSE responsibilities accepted and acted All managers should properly include job descriptions concerning HSE
upon by all line managers throughout
Division/site recognized every management level. Job descriptions HSE responsibilities are not written in the various job descriptions.
prepared, match actual responsibilities and
as a leader in the clearly communicated to all employees. We have a proper organogram.
Clear, practical and unambiguous structure
particular aspect of the
management system
SCORE: 4
Tecon Oil Services ©2017
LEVEL 3 Majority of qualified staff/workers given We train staff e.g HUET, IWCF.
This particular aspect of the operational training. Training records in But we are not rigorously implementing trainings, that’s why we are not in 4.
management system is being place. All instructors qualified.
addressed systematically. WE don’t have annual training schedules as said by Mr. Gabriel.
Reaching the respective targets. Competencies understood for most
positions. Employees training plan up to
Integration with other activities date.
initiated
SCORE: 3
Tecon Oil Services ©2017
LEVEL 3 All major sub contractor's pre- We don’t regularly audit vendors
qualified and some auditing. Only on-
This particular aspect of the site interest by contractor Vendors are not involved in our review process
management system is being management. All minor contractors
addressed systematically. integrated into site HSE
Reaching the respective targets. management system.
SCORE: 3
Tecon Oil Services ©2017
3.4 Communication
revisions submitted.
LEVEL 3 Regular pre-job and HSE meetings. Recommendations are not usually reviewed and submitted.
Active participation by all personnel
This particular aspect of the including subcontractors. Notice
management system is being boards current. Good awareness at
addressed systematically. all levels. All documents available
Reaching the respective targets.
and consulted on occasion as
Integration with other activities
initiated required by line managers.
SCORE: 3
Tecon Oil Services ©2017
management system
SCORE: 4
Tecon Oil Services ©2017
4. Risk Evaluation and Management
To continually evaluate the HS&E risks to the workforce, customers and the environment. Continuously evaluate processes and activities for hazards, assess potentials, record
and control the subsequent risk to a tolerable level.
in the process.
LEVEL 2 Basic HSE definitions known All departmental units should have hazard register.
and understood by
Performance and results management.
inconsistent. System being
implemented but generally at Techniques for hazards and
minimum levels. Plan – Do – effects identification are
Check - Act process understood documented but mostly a top
but not put into practice. down process.
SCORE: 2
Tecon Oil Services ©2017
LEVEL 3 Assessments compiled and No hazard register. All departments should have hazard registers.
SCORE: 3
Tecon Oil Services ©2017
SCORE: 3
Tecon Oil Services ©2017
LEVEL 3 Risk associated with major hazards All personnel are not well equipped with their personal protective equipment. PPE issues
should be addressed
This particular aspect of the minimized through proactive
management system is being application of prevention and mitigation
addressed systematically. measures that meet local
Reaching the respective targets. requirements. Requirements
understood by all. PPE rules clearly
Integration with other activities defined with few violations PTW in
initiated place for critical operations. Personnel
familiar with their roles in control and
recovery procedures.
SCORE: 3
Planning
HSE considerations shall be integral to all aspects of business planning or changes in the design, development, and delivery of our products and services.
SCORE: 4
Tecon Oil Services ©2017
SCORE: 3
Tecon Oil Services ©2017
SCORE: 4
Tecon Oil Services ©2017
LEVEL 3 Change control procedures exist No practice of the implementation of change and amendments made to HSEMS.
documenting evaluation, approval and the
This particular aspect of the responsibilities and competencies of those
management system is being involved.
addressed systematically.
Reaching the respective targets.
SCORE: 3
Tecon Oil Services ©2017
management system
SCORE: 3
Tecon Oil Services ©2017
6. Implementation, Recording and Monitoring
Do what you said you would do, determine and record whether those actions are effective. Activities shall be conducted in accordance with defined standards, and continuous
improvement shall be promoted and monitored through active employee participation.
6.1 Inspections
SCORE: 3
Tecon Oil Services ©2017
6.2 Records
SCORE: 4
Tecon Oil Services ©2017
LEVEL 3 Good presentation of data In an accumulative Appraisals are not implemented on from the HR stand point
and comparative way, allowing analysis of
This particular aspect of the trends and concerns. Some data based on
management system is being perception. Data analysis is input into HSE
addressed systematically. objectives and work plans.
Reaching the respective targets.
SCORE: 3
Tecon Oil Services ©2017
SCORE: 4
Tecon Oil Services ©2017
LEVEL 4 Line management actively leads at all On target. Openness by line managers should be encouraged and all incidents properly
levels incident reporting, investigation reported. Database to be improved upon.
Division/site recognized and review. All reports entered in
database. Alerts issued.
as a leader in the Accountabilities assigned and tracked
to closure. Employees suggest
particular aspect of the
improvements to the process.
management system
SCORE: 4
Tecon Oil Services ©2017
7. Audit and Review (Assessment and Continuous Improvement)
Is the Management System achieving results and fulfilling policy intent? Audits and reviews shall be conducted to verify the implementation and effectiveness of the HS&E
Management System.
7.1 Audits
SCORE: 4
Tecon Oil Services ©2017
7.2 Reviews
SCORE: 4
ADDITIONAL COMMENTS
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
List any remedial actions open from the ‘Contractor Capability Assessment process’ and closure plan
Introduction
This section ocontains the Remedial Action Plan (RAP) for the TECON’s operations . The table below lists the shortfalls and areas of improvement in the hazards
and effect management identified within the Case.
It is the responsibility of the HSE PLANcustodian to ensure that these are satisfactorily completed on schedule
P a g e | 100
bought
Escape system from height up Work in progress
6. on the work basket High Tecon Rig Supv. Nov. 2008 Closed
7. Noise Map of HWU Plans are ongoing Medium Tecon /Snubbing Manager Oct 2019
8 Guying pattern, line, action In place Medium Tecon OPERATIOS June 2019 Closed
points to be provided for the Manager
HEU
9. Tool boxes to be provided for In place Medium Same as above Aug 2019 Closed
each department of the unit
10. Handling equipment for tubular In place High Same as above June 2019 Closed
such as elevators, slips, tongs
etc
11. N.P. Hoses to be well secured Case to secure
in a cage Hoses properly need High Tecon Supv. Nov. 2019
to be made
12. Ladder need to be made The lower ladder
adjustable to height of rig floor need to be adjust Medium Tecon Supv. Sept. 2019 Closed
13. Public address systems for the
work site On order Medium Tecon/safety officer July 2019
14. Drive Right to be installed in all
vehicles On order Medium Same as above July 2019
15. Fire Fighting system shall b e
installed In place High Same as above June 2019 Closed
16. Journey Management to be in
place In place Safety Officer June 2019 Closed
17. Medical equipment to be on
site, i.e stretcher & First Aid In place Tecon / Medic June 2019 Closed
drugs
HSE
P a g e | 101
23. Well control manual to be in Plans are underway Same as above
place High July 2019 Closed
List any remedial actions open from assurance activities, management reviews or incidents
5. Appendices
5.1 Retainership/HMO agreement
5.2 Other attachments
1 2 3 4 5 6 7 8 9 10 11 12
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC
BASIC FIRST
HSE-MS/ FRKLIFT/CRANE
DDC AID & FIRE IWCF DDC
GENERAL HSE OPTR
2017 FIGHTING
P a g e | 102
FORKLIFT
OHSAS 18001 FIRST STOP, IWCF (WELL CONTROL
IWCF (WELL DEFENSIVE IWCF (WELL &CRANE
LEAD FORKLIFT AID,FIRE JHA,MAN PROG.), BASIC OFFSHORE
CONTROL INCIDENT DRIVING CONTROL OPTN,
AUDITOR, /CRANE OPTR FIGHTING,JO UAL SAFETY IND.& EMER.
PROG.) INVESTIGATI COURSE (DDC) PROG.) JOURNEY
HUET URNEY MGT LIFTING TRAINING
2019 ON MGT.
MGT OF
RIGGING & IADC
MGT OF HEMP/ RISK IADC ,
LIFTING, AGT, BKSMAN/SL, DROPS, LINE BASIC JOURNEY
PTW RIGGING & STOP, MOC ASSESSMENT, JOURNEY BASIC FIRST AID
CSE CRANE, FLIFT OF FIRE FIRST AID MGT.
LIFTING HUET MGT
OP
2020
KEY
Completed
Prospective
Missed Additional trainings may be conducted on clients request, employment basis or other specific requirements.
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
P a g e | 103
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
KEY:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
P a g e | 104
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
Key
Fire Drill
Medevac Drill
KICK Drill
APPENDIX 4b: HSE INTERNAL AUDIT PROGRAM FOR THE YEAR 2020
P a g e | 105
Four- Month/Year Auditee (Department/Rig) Audit Type Team Leader Audit Team
Monthly
1st 16 March, 2020 HWO, Casing, Fishing, QA/QC, Jar Equipment Audit Irenus Emeruem Ifeanyi Peters, Irenus Emeruem, Jude Udehbhulu
weeks services, Machineshop/Fabrication,
Workstring/Drill String, SHDEM, Ken Oga-Eluwa, Gbenga bamiduro, Akpos Itsekor
NBDC
HSEMS ((Leadership
Commitment, Policy,
2nd 16 July , 2020 QHSE, Casing, Fishing, Machine and Organisation) Tony Oputa Akpos Itsekor, Manafa Stephen, Tona Kadiri,
weeks Shop/Fabrication, Work String/Drill
String, SHDEM, HWO, Top
Management, Rig sites
P a g e | 106
Audit Type Team Lead AUDIT TEAM
MEMBERS
February 27, 2020 C & I Leasing PLC Road Transport / Journey Jude Udehbhulu Ifeanyi Peters, Tona
Management Kadiri, Kalu Ukpai
May 20, 2020 Detagulf Global Services Inspection Chinedu Oguejiofor Akpos Itsekor,
Manafa Stephen,
Chijioke Uchendu.
Henry Ayanruoh,
Dandy Ilione, Sunny
August 20, 2020 Energyray Integrated Services Ltd. Inspection / Training Valentine Arisukwu
Timmeh.
October 22, 2020 Ponyx Hospital Medical Services Segun Smith Pius Nwoga,
Gbenga Bamiduro,
Month Casimir C. Chinedu Segun Val Chris Gabriel Sunny Innocent Irenus Ken Jude Tony Emmanuel Chika Ifeanyi Chijioke Akpobome Henry INSPECTION
Maduafokw Oguejiofor(R Smith-IRM Arisukwu Asimiakhuin Ahaneku Timeh Ikekpeaz Emeruem Oga- Udehbhul Oputa Nzeribe Ibeabuchi Peters Uchendu Itsekor Ayanruo TARGET
a (CEO) M) - i -HOD -MFS -Ws/Ds u (HWO -HWO Eluwa- u -Bus Finance Bus Dev - Mat. (HWO -Bus.Dev QHSE h HSE
P a g e | 107
Technical Ops Casing Dev Project Rig
SHDEM Manager HOD Rig Mgr) Man. Mgr. Mgr. Man Man
Mgr. Manager Manager Manager Man. Mgr)
Janaury
February X X X X 2
March X X X X 2
Qtr. 1 4
April X X X X X 2
May X X X 2
June X X X X 2
Qtr. 2 6
July X X X X 2
August X X X 2
Septembe
r X X X X 2
Qtr. 3 6
October X X X 2
November X X X X 2
December X X X X X X 2
Qtr. 4 6
VISIT
TARGET 2 3 2 2 3 2 2 2 3 2 3 2 2 2 2 4 4
NOTE: Implementation of site visit will be based on the existence of field operations. The Group HSE Manager should be informed of any regrets at least 48
hours before visit.
P a g e | 108
SIGNED:………………………………………………………………………….
CASIMIR MADUAFOKWA
(CEO / PRESIDENT)
SAFETY
P a g e | 109
External Safety Inspections 200,000
Fumigation 800,000
MISCELLANEOUS:
Miscellaneous 2,000,000
P a g e | 110