IDESIA DASMARIÑAS

PHASE 3 RESIDENTIAL AND ACCESS ROAD


BRGY. SAN AGUSTIN, DASMARIÑAS, CAVITE

GENERAL NOTES VICINITY MAP ABBREVIATIONS TABLE OF CONTENTS

PROJECT
SITE

LEGENDS AND SYMBOLS

-
-

A
C-3.0

1
C-3.2
FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
T-1.0
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 TITLE SHEET
Sta.

122.00

111
750

.392
.000 1
120
127.00 Sta. 108
.93

118
0

122
.69

m21
2 12
0.3
6152 0+7 111
1.7
GATE 75.0 .45

121 79
128.00 8

120 66
02

120 13
.038
00m

120 46

119
.9

118 05
.9

119 64
106

.3

1
120 23

.266
.8

15.6
.24

121 51
.7
1

121

107
.5
MH

.4

12
130

.6

106
EXISTING ROAD

.226
106
13 . .26

107
.2
0 1.0 00 0

60
0.0

108
.722

m
121 0
13

109
.530
.38 1 13

00
0 19 121
2.0

.338
.46 .67
2 8
0

120.0
108 110

.0
.97 345.576 111
133.00 9 110. .80

10
108

0
5

9.6
121.00
.53
126.00 106 1

85
106 10

85
.14 6.31 .48

10
1 506 108
Sta. 775.000m 3 109.

9.2
3

0
.96
134.00

0+
122.477

26
7

122.467
121.793
120.445
119.097
119.942

10
109

126
120.788
107

121.633
122.478
108

7.9
.29 .64
4 .86 108.148 5

64

112
119 106 107 9 107 11

122

a.
0

122

10
.18 .14 .73 .43 1.9
.0

6.1
.00
122 5 1 3 9 76

St
.01 119.2 12 122
34 135.0 106 0
7.779

41
121 106 107 11
wa 11006. 90

11
2 67 0.4 .79 .09 .87
4 1 0 .53 1.4

0.7
66 8 1 106 2 107 891
106

54
.14 .77 11.8
ter .00

11
0 0 10 75
0 5 8.0 109

5.3
8.90
13 m 106 107 10 110 1072
.29

67
stru 3.0
00
.54 6

11
.50 .89 7.5

120
7 11007

129.00
7 1 98

9.9
13

12 1.2 92

13
4.0 0
.5
.544
108 993

61
1.4 57
110 00
0 110. 111.3

12 1.0 61
.86
ctu

121

Sta.
0.
.92

23
2 10 107

12 9.7 48
65

3.00
0 120 7 9.4 .64

11 9.2 0
113 0
.36
115 49
re

120
80
118 831

11 0.65 39
2 .00
3 111. 11 107

12 1.2 96
1.3 .9
11 161 109.6 65

12 1.3 53
+ 11.2 11

12 1.5

0
2

123.0
.0

127.00
1

124.00
Sta .0011.909 63

12

+825
122
. 82 m ta 109 112

113
5.000 119 121.7 S 1
107 08.2 .14 .81

11
8 0

0
Par

122
.70 98

125.00
1
121 .39
7 13 135.0 111 11 08.3 2

3.0
.590.12 01
. 00m .29
0

123.00
2 3 2

.000
0 kin Sta. 0+875.000m

113.488
108.822

110.293
110.244

107.820
112.538

112.146
0

0
12

120
121 .798
8 12 1
ga 13

121 .404
a.

.81

121 .283

114
2 4

120 .343
123
.00

2
St

119 .394

m
rea
.12

119 .829
EXISTING ROAD
8

120 .633
CREEK
122 .985
122
122.00 113 1
.46 09.6
109 108
.08

121
.70 8 109

134.00
12
MH

2 55 3
8.0 Sta. 0 .40
0
113 11
.90 4.9

5
121
2 37
+900.0

11
1 12 .72

126
120 20.31.446
.09 21
1 0

113.3
1 21 2
00m

111.2
12 2 .60

.00

109.6
.85 9

23

108.09
MH

3
135.0

26

109.0
57

11
0

123

122.245
121.751

114.22
1.524
132.00
121.253

6
114
120.836 120

03
120.419

11
120.903
121.387
121.871
122.355

1
0.000m
Sta. 85
122
.15 121 120.3
8 .95
5 01 113 11
134.00 .22 1.4 109 1

7
4 7

EXISTING
121 5

126
Sta. .6108.0 115

11
109 113

115
.37 4 9 .22 .69
1252 6 .11 7
9 0
875

123.00
.3 45

.00
.000

129.0

114.614
113.084
110.507
m 135.00 135.0

109.282
130.00
123 17

110.626
0

122 17

112.758

8
122 18

134.00
.276

113.276
121 18

11
0m

.8

120 17
123.00
925.00

.0

0
121 16
wa

116
.2

121 15
.4
113

122
Sta. 0+
110 112

.0

122.
.9

.6
.01 .9 27 118

ter

.2
134.00 135.0 112 6 04 .29

814
1
134.00 0 116

123
.25 114 .45
.28 3

stru

134.00
9 6
117

126.00

9
134.00 g 117 119

130.00
penin

11
132.00

128.00
117 .68 .01

EXISTING ROAD
dam o117.7
6 0

ctu
.76
123 6

133.00
123122 12 120 121.9 .18 118

119
0 117 27
.91 .437 0.32 .013 52
1 8
re 117
.7
.68
3

118.03
26
DAM 118

118.07
.6 59
13

117.62
124

8
117.59
123.4
4.

117.83

3
122.14
121.54

St
120.9

00

1
118.19
120.38
121.8
123.24

134.0

118.72

8
134.00
.000m
38
123.6

a.

131.00

134.00
123.85

rui

0
6

134.0
64
3

124.00

4
16

92 0.000m +950
4

0
Sta

16

ned
7

4
00
1

0
S a. 95.00 Sta. 0
123

0
5.

t .12
.

6
col
12

118117
.00
93

118
120
128 117
. 00
.79.989
0m .68
0
121
126
.00 133 um 7 .38
8 11 9
117117.9.0
.81
1

134.00
9.3

.23 3474
MH

.8
123 77
.97
ns 3
12 3.87 7

118.92
12 4.17

13
124
12 3.08 2
86

119.08
.18
12 2.02 9
12

117.27
0

4.
12 0.69 7

117.21

8
5

00
12 1.69 0
m

.00

118.17
119

3
12
12 3.35 0

118.93
127

5
79 3
12 4.96 6

122

118.96
010190m
124

3
4.3 7
5.5 2

12 .33 .61

1
+975.
3
12 1
81

124 124 .177

5
134.00
00

1
.43 23 18 6 . 117
124

12 133 Sta. 0
1236 1 122.0 8 .0
1.0241 1 01.8.8512 3 119 91 11711 11

125.00
.0 .869.11 9.13
7.49 20215.08 75
12 134 119 04

126.00
1 1.421 0 2 0 3
.0
12 .73 39
.00

127.00
.00
2 4
12 3.98
8

124.00
12 12 152.959.2
5
4 13
12 91
127
.5 56
134.00
EXISTING ROAD

134.00

118.992

118.962

117.887

117.444

117.805

119.376

119.399
00 135.00 Sta. 1+000.000m 119 1
.01 17.99 117
.45 117 11
6.
2 9 6 .99 9.46
134.00 6 1
12 Sta
. 1+ 11
9
025
.00 118
129.00

.90 11
6 8.0
0m

6
06

.07
117
.56 118

119

1
2 .1

.92
20

118
119

7
.85
.43
3

117

6
.55
119

125.0
.17

117

7
8 11

.79
134.00
7.9

117
87

1
117

.66
128.00 134.0
0 Sta .55
2

118

47
0
. 1+

9.3
130.00

11
131.00 134.00 050 118
.06
.00 1
119

119
0 135.00 0 m
.27
9

.1

119
5.0

50

.20

117
119
12 .2

4
27

.91

117
118
12

4
.1
134.00

.4

117
60
9.0 p124

94
ool.00 117
125.00

.8

118
.48
0 Sta

29
5

.44

119
134.00
. 1+

6
133.00

.22
00
118

2
6. 075 .08
8

129.00
12
119

N 124 .00 .19

EXISTING ROAD
3

119
To PC .00 0
0

119
m
7.0

.16

119
.2

127.00
05
0

2
we 126.0 0

.19

118
12

11

9
8.3

.24
r 1 .0

117
91
2 8 117

1
.53

.53

117
MH
3
0
MH

2
129.0

.61
117

118
.62

4
5 1

.99

119
130.00
19.1

5
1

.2
2

70
0
132.0 0 Sta. 1
133.0
119
+100 .10
2 119
1.0137
.000m
129.00

2.74 11

119.11
2 7.0
St

119.07
134.0
135.0
67

117.71
117
a.

117.18
134.0 .44
311

6
135.0

117.44
9
1+ .16

EX

119.04
5
0

0
0

119.36
130.00

12

4
LEGENDS:
0

5.0

4
IS
119
0 .16

3.0
3
.00 00 118

TIN

St
133 .00
.04
12

72
135 m 0
00 2.00

9.1
117
.00

a.
128.00

11
130 25.
.55

73
0
132.00

9.0
12

1+
1

11

41
G

7.8
117
119 .82

15

11

50
9 11

12 21
.19 9.4

7.7
8
133.00

134.00

58

CR
119

11
Sta

0.0
1
.1

93
11761

7.7
.78

11
75 2

17
00
.1

9.2
.3
135 19

EE

11
EXISTING ROAD

1 117
.00

36
27 .46

9.2
+1
9.2 9
119

11
.43 11
9 8 2

75
K 7.5
119 117
11

R
.23 .93
0 1 1

11
6 119

.00
7.5 .50
11 1618

9
18 117

VE
9.8 .59
4 19 .85
9

0m
11 8.0
11
92 3
9.5 .55
St 119
.88
0
11
119
.58 119
0
a.

9
3
PS 9

RI
MH MH

.45 119
.03

11
117 17 .54
5 119

PS
1 +2
.451
0
117 17.5
41
132.00

.416
00
128.00

5 118
130.0

88 .408

AS
.00 122
11
8.0
38 119
0m .67

04
.41 8.5 7
9 11

2.3
0
129.00

12
74

57


9.6
St

1.0
11

12

96
a.

7.7
11
135 1

65
120.00

121
AR 7.8
.00 +2 118

120
.16

11

46
9
25

8.5
119

.00
.56

11

84

.00
9
.0

9.2

122
.00

11
00

96
SM
134 132.00

9.5
98

123

124
m

11

.00
1.6
St

125
12

84
130.00

126 0
9.6

.00

.00
a.
MH

127
MH
120

129 .00
128 0
11

9
.18

.0
.17
0

1+

.00
8
117

DA
11
13

.0
79

.00
.98

130
9

7.8
4.

2
13 117

11

29
00
00

.88

50

8.1
5. 1

.00
5.
121

11
00

04
.37

.0
118

131.0
8.9
12
126 .31
55

11
0.1 8

66
00
1.4 13197

0.3
12 .84

12
57 8
St

m
0.5

0
PS 13 a. 12
90
118
4 .02
13 .00 7.7 4
134.00 1+ 11

132.00
3 31

0
13 .00 27 .9

3.0
7
11 11
81 181.1997
2.0 5.0 8.0

12
.25
11 121
PS 0
00 121
.63 9.4
29 0.055

41
m 9 11

1.2
14

12

57
117 0.6

133.00
St .48

1.1
5 12

12
a.

61
117

SURVEY INFORMATION:
130.00

9.5
.80
7
135.00 1

11
131.00

99
+2

7.7
118

11

63
132.00

.68
99 134.00

8.5
119 0
133.00

11
.67
PS

1
.71

0
134.00

9.4
9 120

11
11
135.00

52
.71
5m 135.00

0.5
6
136.00

14
120

0.1

12
136.00
137.00

.79
.00

12

00
53
2
136

0.3

0.
117

12

30

12
.59

9.3
1
121.00

121
11

55
0

8.0
1.0
117
.00

120

11

96
.90
13 137
3

8.9
137

11

29
120

9.9
.16

2.00
8121
.00

11

23
.00
135.00

1
12

0.8
119
138.00

12
120
138.0

.00 .00
123 138
0

WY
12 1.00
0 0 .0 0
9.0 .0 0 0 0 139
13 138 37.036.0 5.0 4.00 .00 0
1 1 13 13 3 2.0 0
13 13 31.0 .00 .00 .00 00 .00

OH
1 130 129 128 27. .00 .00 124
1 126 25 .00 .00 0
1 24 3 .0
1 12 22 .00
1 21
1

LD
0
125.0
.00

INA
140
.00
126
13
7.0 .00
136.00

140

U
.00 0
127 .00
.00 128 .00 13

AG
139 0 .00
139.00

13 6.0
130 132.0 133134.00 5.0 0
0
138.00
137.00

EXISTING ROAD

.00
140

0
0.0
14
SHEET NOTE:
138.00

139.00
137.00
138.00
139.00

Are GOVERNOR'S DRIVE


a=
11 TOPOGRAPHIC SURVEY/ FOR
0,7 EXISTING CONDITION CONSTRUCTION

07
S q.M
Ar e
a= P.A. ALVAREZ PROPERTIES
AND DEVELOPMENT CORP.
Quality
Service
Commitment
V C A INTERNATIONAL
CIVIL STRUCTURAL
INC
C-1.0
26 Unit 5A Karina Building, 33 Shaw Boulevard
IDESIA DASMARIÑAS - PHASE 3 TOPOGRAPHIC SURVEY/

4,2
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514 EXISTING CONDITION

56
PHASE 1 IDESIA DASMARIÑAS PHASE 3

C-2.1 C-2.2
LAND ALLOCATION
TOTAL GROSS LAND AREA (TOTAL GLA) = 151,234
A. RESIDENTIAL COMPONENT
AMENITIES
2A AMENITIES LAND ALLOCATION OF PHASE 3

NT
2B

ME
AREA %

SE
EA
3M
GROSS LAND AREA (GLA):
EXCLUDED AREA:

CREEK
3.00 MTS EASEMENT
NET APPLIED:

EXISTING
3M EASEMENT
LOT ALLOCATION

NGCP

B. FUTURE RESIDENTIAL COMPONENT


SCHOOL
LAND ALLOCATION
FUTURE PRIME AREA %
RESIDENTIAL GROSS LAND AREA (GLA):
COMMERCIAL/ SUPERMARKET/ EXPANSION
CHURCH RETAIL BPO EXCLUDED AREA:

M
EN
T
3.00 MTS EASEMENT

ER
SE
EA
3M NET APPLIED:

RIV
C. COMMERCIAL COMPONENT / FUTURE EXPANSION

AS
LAND ALLOCATION

RIÑ
AREA %

A
GROSS LAND AREA (GLA):

SM
EXCLUDED AREA:

DA
3.00 MTS EASEMENT:
INSTITUTIONAL COMMERCIAL/ NET APPLIED:
HOSPITAL RETAIL
C.1. SALEABLE - COMMERCIAL

WET AND DRY


MARKET

C.2. OTHER SPACES

WYH
COMMERCIAL ROW/STRIP

DO
AL
UIN
AG
GOVERNOR'S DRIVE

OVERALL SITE FOR


DEVELOPMENT PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-2.0
OVERALL SITE
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 DEVELOPMENT PLAN
MATCHLINE - SEE SHEET C-2.2

SUPERMARKET/

B L O C K 11

B L O C K 10

BLOCK 9
BPO

BLOCK 8
B L O C K 12

ACCESS ROAD LOT 2 (17.50M R.O.W)


ROAD LOT 18 (8.0 M R.O.W)
PHASE 1

ACCESS ROAD LOT 4 (10.40 M R.O.W)


(12.0 M R.O.W)

COMMERCIAL/
ROAD LOT 9 (8.0 M R.O.W) RETAIL

GOVERNOR'S DRIVE
.W) .O

ACCESS ROAD LOT 1 (17.50M R.O.W)


1
MR
CK
)

(8.0
.O.W

O
CK

BL
10

COMMERCIAL/
R

LO
M

T
.W)

K 3

RETAIL SALES OFFICE


(8.0

L
O

B
.W)

COMMERCIAL ROW/STRIP
AD

)
BLOCK 5

.O.W
R

T8
ROAD LOT 5 (8.0 M R.O.W)

R
.O

LO

RO
.0 M

7.50M
LO
MR

1 (1
LOT
B
4

(8

AD

D
OA
K
(8.0

T7

ES SR
RO
OC

CC
.W
LO

A
6

R.O
OT

)
BL

.W
D
OA
L

R.O

M
AD

.0
C K 8.0 M

(14
RO

13
1(

WET AND DRY


T1

LO
LO

AD

CHURCH
O

MARKET
7

BL
AD

RO
K

RO
OC

)
BL

.W
R.O

)
0M

(8.0 M R.O.W
6
CK
(9.

2
ROAD LOT 1
BL

NT SCHOOL
ME
SE
EA 3M
EAS
3M EM
ENT

EXISTING
CREEK
INSTITUTIONAL
HOSPITAL
3M
EA
SE
M
EN
T

C-2.1 C-2.2

KEYMAP

SHEET NOTES:

ENLARGED SITE FOR


DEVELOPMENT PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-2.1
ENLARGED SITE
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 DEVELOPMENT PLAN
AG
UIN
AL
DO
HW
Y

)
.W
R.O
M
DA

.50
SM

17
AR

3(
IÑ AS

T
LO
R IVE

AD
R

RO
SS
CE
AC
NGCP

ROAD L
OT 21 (8
.0 M R.O.W
)
NGCP
13
K
OC

FUTURE PRIME
BL

RESIDENTIAL
RO

EXPANSION
AD
W)

LO
.O.

C-2.1 C-2.2
T2
MR

0(
PHASE 1

(8.0

14
1

.0
K 1
ROAD LOT 14 (8.0 M R.O.W)

15

M
10
)
OT

.O.W

R.O
OC

.W)
)

ACCESS ROAD LOT 3 (17.50M R.O.W)


K

.O.W
L

.W
R.O
OC
AD

BL

MR

)
MR
RO

.0 M
BL
8.0
B L O C K 12

8.0
16 (

O C T 19 (8

SUPERMARKET/
17 (

K 9
OT

K 8

BPO
LOT

LO
DL

OC

AD
ROA

AD

BL

BL
RO
RO

MATCHLINE - SEE SHEET C-2.1 KEYMAP

SHEET NOTES:

ENLARGED SITE FOR


DEVELOPMENT PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-2.2
ENLARGED SITE
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 DEVELOPMENT PLAN
6 7 8
C-3.7 PHASE 1 C-3.7 C-3.8

C-3.1 C-3.2

ROAD LOT 4 (10.40M & 12.00M R.O.W)


AMENITIES
2A AMENITIES
2B
5
C-3.7

EEKR
ING C
4

NT
EME
EXIST
C-3.6
EAS
3M

ROAD LOT 2 (17.50M R.O.W)

SCHOOL
NGCP
FUTURE PRIME
RESIDENTIAL
EXPANSION
COMMERCIAL/ SUPERMARKET/
CHURCH RETAIL BPO
T
EN
M
SE
EA

R
3M

IVE
ROAD LOT 3

SR
C-
9

IÑA
3 .8

AR
SM
DA
COMMERCIAL/
RETAIL
INSTITUTIONAL (17
RO

.50
HOSPITAL M
AD

R.
O.
W
10
LOT

) C-
3.8
1 (1
7.50
MR
.O.W

3 WET AND DRY


.6 MARKET
)

C- 3 RO
AD
LO
11
T 3( C-
17
.50 3.8
M
R.O
.W
)

2
C-3.6

WY
OH
LD
COMMERCIAL ROW

INA
U
AG
ROAD LOT 1 (17.50M R.O.W)

1
C-3.6

GOVERNOR'S DRIVE

OVERALL SITE FOR


GRADING PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.0
OVERALL SITE
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 GRADING PLAN
ESTIMATED EARTHWORK

MATCHLINE - SEE SHEET C-3.2

SUPERMARKET/

B L O C K 11

B L O C K 10

BLOCK 9
BPO

BLOCK 8
B L O C K 12

COMMERCIAL/
RETAIL

GOVERNOR'S DRIVE
PHASE 1

1
CK
2

O
CK

BL

COMMERCIAL/
LO
K 3

RETAIL SALES OFFICE


B

COMMERCIAL ROW/STRIP
BLOCK 5

C
LO B
4 K
OC
BL

WET AND DRY


CK

CHURCH
O

MARKET
7

BL
K
OC
BL

6
CK
O
BL

NT SCHOOL
E ME
EAS 3M
EAS
3M EM
ENT

EXISTING
CREEK
INSTITUTIONAL
HOSPITAL
3M
EA
SE
M
EN
T

C-3.1 C-3.2

KEYMAP

SHEET NOTES:
ENLARGED SITE FOR
GRADING PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.1
ENLARGED SITE
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 GRADING PLAN
ESTIMATED EARTHWORK

AG
UIN
AL
DO
HW
Y

DA
SMA
RIÑ
AS
RIV
E R

NGCP

NGCP
13
K
OC

FUTURE PRIME
BL

RESIDENTIAL
EXPANSION
C-3.1 C-3.2
1
K 1

10
OC

K
OC
BL

BL
B L O C K 12

SUPERMARKET/
K 9

K 8

BPO
OC

OC
BL

BL

MATCHLINE - SEE SHEET C-3.1 KEYMAP

SHEET NOTES:
ENLARGED SITE FOR
GRADING PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.2
ENLARGED SITE
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 GRADING PLAN
ESTIMATED EARTHWORK

PHASE 1

C-3.4 C-3.5

EXISTING
CREEK

ASD
AR M
AS IÑ
IVE R
R

Y
HW
DO
AL
UIN
AG
GOVERNOR'S DRIVE

OVERALL CUT AND FOR


FILL DIAGRAM CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.3
OVERALL CUT AND
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 FILL DIAGRAM
ESTIMATED EARTHWORK

MATCHLINE - SEE SHEET C-3.5

SUPERMARKET/
BPO

BLOCK 8
BLOCK 11

BLOCK 10

BLOCK 9

ACCESS ROAD LOT 2 (17.50M R.O.W)


ROAD LOT 18 (8.0 M R.O.W)

BLOCK 8

ACCESS ROAD LOT 4 (10.40 M R.O.W)


(12.0 M R.O.W)

BLOCK 1
COMMERCIAL/
PHASE 1

ROAD LOT 9 (8.0 M R.O.W) RETAIL

GOVERNOR'S DRIVE
)
.O.W

ACCESS ROAD LOT 1 (17.50M R.O.W)


M R
.W)

.0

1
2

CK
CK

0 (8
.O

BLO
BLO

COMMERCIAL/
MR

1
OT
.W)

RETAIL SALES OFFICE


(8.0

L
3
.O
4
.W)

COMMERCIAL ROW/STRIP
CK

AD

)
CK

.O.W
MR

8
BLO
ROAD LOT 5 (8.0 M R.O.W)

R
.O

BLO

RO

0M
OT

7.5
MR

1 (1
.0

LOT
7 (8

AD

D
OA
(8.0

ES SR
RO
T

CC
.W
LO

A
BLOCK 5

R.O
OT

)
.W
D
OA
L

R.O

M
AD

.0
0M

(14
RO

(8.

13
11

WET AND DRY


LO
OT

AD

CHURCH MARKET
L
BLOCK 7

AD

RO
RO

)
.W
R.O

)
0M

(8.0 M R.O.W
(9.

2
ROAD LOT 1 BLOCK 6
NT
SCHOOL
ME
SE
EA 3M
EAS
3M EM
ENT

EXISTING
CREEK
INSTITUTIONAL
HOSPITAL
C-3.4 C-3.5
3M

3M
EAS
EM
EA

ENT
SE
M

3M
EN

EASE
MENT
T

3M
EA
SE
ME
NT

KEYMAP

LEGENDS:

ENLARGED CUT AND FOR


FILL DIAGRAM CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.4
ENLARGED CUT AND
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 FILL DIAGRAM
ESTIMATED EARTHWORK

AG E
UIN MILIO
AL
DO
HW
Y

)
.W
R.O
M
DA

.50
SM

(17
AR
IÑA

T3
SR

LO
IVE

AD
R

RO
SS
CE
AC
NGCP

ROAD L
OT 21 (8
.0 M R.O.W
)
NGCP
BLOCK 13

FUTURE PRIME
RESIDENTIAL
RO

EXPANSION
AD
.W)

L
R.O

OT

C-3.4 C-3.5
20
.0 M

(14
5 (8

.0
ROAD LOT 14 (8.0 M R.O.W)
PHASE 1

M
T1

)
.O.W

R.O
)
LO

.O.W
)

ACCESS ROAD LOT 3 (17.50M R.O.W)


.O.W

.W
AD

MR

)
MR
11

MR
RO

CK

8.0

(8.0
BLO

8.0
16 (
BLOCK 12

SUPERMARKET/
17 (
K 10

19
OT

BPO
OT
C

LOT
BLO
DL

8
DL
CK

CK
ROA

BLO
AD

BLO
A
RO
RO

MATCHLINE - SEE SHEET C-3.4 KEYMAP

LEGENDS:

ENLARGED CUT AND FOR


FILL DIAGRAM CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.5
ENLARGED CUT AND
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 FILL DIAGRAM
SECTION-1 1 SECTION-2 2 SECTION-3 3
C-3.0 C-3.0 C-3.0

SECTION-4 4
C-3.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.6
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 GRADING SECTIONS
SECTION-5 5
C-3.0

SECTION-6 6 SECTION-7 7
C-3.0 C-3.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.7
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 GRADING SECTIONS
SECTION-8 8 SECTION-9 9
C-3.0 C-3.0

SECTION-10 10 SECTION-11 11
C-3.0 C-3.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-3.8
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 GRADING SECTIONS
MATCHLINE - SEE SHEET C-6.1

GOVERNOR'S DRIVE
PHASE 1

1
m

CK
= 92
2
1m

O
CK
., L

BL
= 12

MA X
LO
K 3
., L
m

m
159

B
MAX

1.50
BLOCK 5

C
,L=

LO

H=
0m
AX.

1.
B
M 4

H=
H= OCK
1.0m
L B

.
CK

AX
M
m
O

. 50 24m
7

0
BL

= L=
K

H
OC
BL

6
CK
O
BL

EXISTING
CREEK

C-6.0 C-6.1

KEYMAP

SHEET NOTES:
FOR
ENLARGED WALL PLAN CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.0
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 ENLARGED WALL PLAN
AG EM
UIN ILIO
AL
DO
HW
Y

DA
SM
AR
IÑA
SR
IVE
R
H
13

=
0. = 2
60 4m
L
K

m
OC

M
AX
BL

,
1
K 1

10
OC
213m

K
OC
BL

C-6.0 C-6.1
,L=

B Lm
193
B L O C K 12

MAX

,L=

C K 9m
2.0m

L OX, L = 13
9
MAX

K 8
H=

1.6m

OC
BM A

BL
H=

1.0m
H=
B L O C K 11

B L O C K 10

BLOCK 9

BLOCK 8

KEYMAP
B L O C K 12

SHEET NOTES:
FOR
ENLARGED WALL PLAN CONSTRUCTION

MATCHLINE - SEE SHEET C-6.0

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.1
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 ENLARGED WALL PLAN
MATCHLINE - SEE PROFILE LEFT SIDE
BELOW
WALL PROFILE 1 1
C-6.0
MATCHLINE - SEE PROFILE RIGHT SIDE ABOVE

MATCHLINE - SEE PROFILE ON SHEET C-6.3


WALL PROFILE 1 2
FOR
C-6.0 CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.2
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE ON SHEET C-6.2

MATCHLINE - SEE PROFILE LEFT SIDE


BELOW
WALL PROFILE 1 1
C-6.0
MATCHLINE - SEE PROFILE RIGHT SIDE

MATCHLINE - SEE PROFILE ON


SHEET C-6.4
ABOVE

WALL PROFILE 1 2
FOR
C-6.0 CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.3
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE LEFT SIDE
MATCHLINE - SEE PROFILE ON
SHEET C-6.3

BELOW
WALL PROFILE 1 1
C-6.0

MATCHLINE - SEE PROFILE ON SHEET C-6.5


MATCHLINE - SEE PROFILE RIGHT SIDE
ABOVE

WALL PROFILE 1 2
C-6.0 FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.4
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE LEFT SIDE
MATCHLINE - SEE PROFILE ON
SHEET C-6.4

BELOW
WALL PROFILE 1 1
C-6.0

MATCHLINE - SEE PROFILE ON SHEET C-6.6


MATCHLINE - SEE PROFILE RIGHT SIDE
ABOVE

WALL PROFILE 1 2
C-6.0 FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.5
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE LEFT SIDE
MATCHLINE - SEE PROFILE ON
SHEET C-6.5

BELOW
WALL PROFILE 1 1
C-6.0

MATCHLINE - SEE PROFILE ON SHEET C-6.7


MATCHLINE - SEE PROFILE RIGHT SIDE
ABOVE

WALL PROFILE 1 2
FOR
C-6.0 CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.6
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE LEFT SIDE BELOW
MATCHLINE - SEE PROFILE ON SHEET C-6.6

WALL PROFILE 1 1
C-6.0
MATCHLINE - SEE PROFILE

MATCHLINE - SEE PROFILE


RIGHT SIDE ABOVE

ON SHEET C-6.8
WALL PROFILE 1 2
C-6.0 FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.7
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE LEFT SIDE
MATCHLINE - SEE PROFILE ON
SHEET C-6.7

BELOW
WALL PROFILE 1 1
C-6.0

MATCHLINE - SEE PROFILE ON SHEET C-6.9


MATCHLINE - SEE PROFILE RIGHT SIDE
ABOVE

WALL PROFILE 1 2
C-6.0
FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.8
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 1
MATCHLINE - SEE PROFILE ON
SHEET C-6.8

WALL PROFILE 1 1
C-6.0

STA. 0+000.00 A STA. 0+020.00 B STA. 0+040.00 C STA. 0+060.00 D


C-6.0 C-6.0 C-6.0 C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.9
WALL PROFILE 1
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 AND SECTIONS
STA. 0+080.00 A STA. 0+100.00 B STA. 0+120.00 C STA. 0+140.00 D
C-6.0 C-6.0 C-6.0 C-6.0

STA. 0+160.00 E STA. 0+180.00 F


C-6.0 C-6.0 STA. 0+200.00 G
C-6.0

STA. 0+220.00 H STA. 0+240.00 J


C-6.0 C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.10
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 1 SECTIONS
STA. 0+260.00 A STA. 0+280.00 B
C-6.0 C-6.0

STA. 0+320.00 D
STA. 0+300.00 C C-6.0
C-6.0

FOR
STA. 0+340.00 E STA. 0+360.00 F CONSTRUCTION
C-6.0 C-6.0

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.11
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 1 SECTIONS
STA. 0+380.00 A STA. 0+400.00 B STA. 0+420.00 C
C-6.0 C-6.0 C-6.0

STA. 0+440.00 D STA. 0+460.00 E STA. 0+480.00 F


C-6.0 C-6.0 C-6.0

STA. 0+500.00 G STA. 0+520.00 H


C-6.0 C-6.0 FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.12
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 1 SECTIONS
STA. 0+540.00 A STA. 0+560.00 B
C-6.0 C-6.0

STA. 0+580.00 C STA. 0+600.00 D


C-6.0 C-6.0

STA. 0+640.00 F
STA. 0+620.00 E C-6.0
C-6.0
FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.13
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 1 SECTIONS
STA. 0+660.00 A STA. 0+680.00 B
C-6.0 C-6.0

STA. 0+700.00 C STA. 0+720.00 D STA. 0+740.00 E STA. 0+760.00 F


C-6.0 C-6.0 C-6.0 C-6.0

STA. 0+780.00 G STA. 0+800.00 H STA. 0+820.00 J STA. 0+840.00 K


C-6.0 C-6.0 C-6.0 C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.14
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 1 SECTIONS
STA. 0+860.00 A STA. 0+880.00 B STA. 0+900.00 C STA. 0+920.00 D
C-6.0 C-6.0 C-6.0 C-6.0

STA. 0+940.00 E STA. 0+960.00 F STA. 0+980.00 G STA. 1+000.00 H


C-6.0 C-6.0 C-6.0 C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.15
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 1 SECTIONS
MATCHLINE - SEE PROFILE LEFT SIDE BELOW
WALL PROFILE 2 1
C-6.1

MATCHLINE - SEE PROFILE ON SHEET C-17


MATCHLINE - SEE PROFILE RIGHT SIDE
ABOVE

WALL PROFILE 2 2
C-6.1

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.16
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 2
MATCHLINE - SEE PROFILE LEFT SIDE BELOW
MATCHLINE - SEE PROFILE ON SHEET C-6.16

WALL PROFILE 2 1
C-6.1
MATCHLINE - SEE PROFILE RIGHT SIDE ABOVE

WALL PROFILE 2 2
FOR
C-6.1
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.17
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 2
STA. 0+000.00 A STA. 0+020.00 B STA. 0+040.00 C STA. 0+060.00 D
C-6.1 C-6.1 C-6.1 C-6.1

STA. 0+080.00 E STA. 0+100.00 F STA. 0+120.00 G STA. 0+140.00 H


C-6.1 C-6.1 C-6.1 C-6.1

STA. 0+160.00 J STA. 0+180.00 K STA. 0+200.00 L STA. 0+220.00 M FOR


CONSTRUCTION
C-6.1 C-6.1 C-6.1 C-6.1

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.18
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 2 SECTIONS
STA. 0+240.00 A STA. 0+250.23 B
C-6.1 C-6.1

MATCHLINE - SEE PROFILE


ON SHEET C-6.20
WALL PROFILE 3 1
C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.19
WALL 2 SECTIONS AND
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 3
MATCHLINE - SEE PROFILE LEFT SIDE BELOW
MATCHLINE - SEE PROFILE ON
SHEET C-6.19

WALL PROFILE 3 1
C-6.1

MATCHLINE - SEE PROFILE ON SHEET C-6.21


MATCHLINE - SEE PROFILE
RIGHT SIDE ABOVE

FOR
CONSTRUCTION
WALL PROFILE 3 2
C-6.1

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.20
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 3
MATCHLINE - SEE PROFILE ON SHEET C-6.20

WALL PROFILE 3 1
C-6.1

STA. 0+020.00 A STA. 0+040.00 B STA. 0+060.00 C


C-6.1 C-6.1 C-6.1

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.21
WALL PROFILE 3
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 AND SECTIONS
STA. 0+080.00 A STA. 0+100.00 B STA. 0+120.00 C
C-6.1 C-6.1 C-6.1

STA. 0+140.00 D STA. 0+160.00 E STA. 0+180.00 F


C-6.1 C-6.1 C-6.1

STA. 0+200.00 G STA. 0+220.00 H STA. 0+236.86 J


FOR
C-6.1 C-6.1 C-6.1
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.22
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 3 SECTIONS
MATCHLINE - SEE PROFILE LEFT SIDE BELOW
WALL PROFILE 4 1
C-6.1
MATCHLINE - SEE PROFILE RIGHT SIDE ABOVE

MATCHLINE - SEE PROFILE ON SHEET C-6.24


FOR
CONSTRUCTION
WALL PROFILE 4 2
C-6.1

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.23
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 4
MATCHLINE - SEE PROFILE LEFT SIDE BELOW
MATCHLINE - SEE PROFILE ON SHEET C-6.23

WALL PROFILE 4 1
C-6.1
MATCHLINE - SEE PROFILE RIGHT SIDE ABOVE

FOR
CONSTRUCTION

WALL PROFILE 4 2
C-6.1

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.24
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 4
STA. 0+000.00 A STA. 0+020.00 B STA. 0+040.00 C
C-6.1 C-6.1 C-6.1

STA. 0+060.00 D STA. 0+080.00 E STA. 0+100.00 F


C-6.1 C-6.1 C-6.1

STA. 0+120.00 G STA. 0+140.00 H STA. 0+160.00 J


C-6.1 C-6.1 C-6.1

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.25
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 4 SECTIONS
STA. 0+180.00 A STA. 0+200.00 B STA. 0+220.00 C
C-6.1 C-6.1 C-6.1

MATCHLINE - SEE PROFILE


ON SHEET C-6.27
STA. 0+235.14 D
C-6.1

WALL PROFILE 5 1
C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.26
WALL 4 SECTIONS AND
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 5
MATCHLINE - SEE PROFILE

MATCHLINE - SEE PROFILE


LEFT SIDE BELOW
ON SHEET C-6.26

WALL PROFILE 5 1
C-6.0

MATCHLINE - SEE PROFILE


MATCHLINE - SEE PROFILE
RIGHT SIDE ABOVE

ON SHEET C-6.28
WALL PROFILE 5 2
C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.27
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 5
MATCHLINE - SEE PROFILE
ON SHEET C-6.27

WALL PROFILE 5 1
C-6.0

STA. 0+000.00 A STA. 0+020.00 B STA. 0+040.00 C


C-6.0 C-6.0 C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.28
WALL PROFILE 5
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 AND SECTIONS
STA. 0+060.00 A STA. 0+080.00 B STA. 0+100.00 C
C-6.0 C-6.0 C-6.0

STA. 0+120.00 D STA. 0+140.00 E


C-6.0 C-6.0

STA. 0+160.00 F STA. 0+180.00 G


C-6.0 C-6.0
FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.29
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 5 SECTIONS
STA. 0+200.00 A STA. 0+212.74 B
C-6.0 C-6.0

MATCHLINE - SEE PROFILE


ON SHEET C-6.31
WALL PROFILE 6 1
C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.30
WALL 5 SECTIONS AND
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 6
MATCHLINE - SEE PROFILE

MATCHLINE - SEE PROFILE


LEFT SIDE BELOW
ON SHEET C-6.30

WALL PROFILE 6 1
C-6.0
MATCHLINE - SEE PROFILE

MATCHLINE - SEE PROFILE


RIGHT SIDE ABOVE

ON SHEET C-6.32
WALL PROFILE 6 2
C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.31
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 6
MATCHLINE - SEE PROFILE

MATCHLINE - SEE PROFILE


LEFT SIDE BELOW
ON SHEET C-6.31

WALL PROFILE 6 1
MATCHLINE - SEE PROFILE C-6.0
RIGHT SIDE ABOVE

WALL PROFILE 6 2
C-6.0

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.32
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL PROFILE 6
STA. 0+000.00 A STA. 0+020.00 B STA. 0+040.00 C
C-6.1 C-6.1 C-6.1

STA. 0+060.00 D STA. 0+080.00 E STA. 0+100.00 F


C-6.1 C-6.1 C-6.1

FOR
G H CONSTRUCTION
STA. 0+120.00 STA. 0+140.00
C-6.1 C-6.1

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.33
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 6 SECTIONS
STA. 0+160.00 A STA. 0+180.00 B
C-6.1 C-6.1

STA. 0+200.00 C STA. 0+220.00 D


C-6.1 C-6.1

FOR
STA. 0+240.00 E STA. 0+260.00 F CONSTRUCTION
C-6.1 C-6.1

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.34
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 6 SECTIONS
STA. 0+280.00 A STA. 0+290.55 B
C-6.1 C-6.1

FOR
CONSTRUCTION

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-6.35
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL 6 SECTIONS
SECTION @
JUNCTION BOX

ELEVATION @
COMPRESSION SIDE

SCHEDULE OF RETAINING WALL


H (mm) Hw (mm) T (mm) Tw (mm) Tf (mm) E (mm) B (mm) Bh (mm)

SECTION SECTION

REINFORCEMENT SCHEDULE
HEIGHT
BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING BAR DIA SPACING
(Hw,mm)
(Ø) (mm) (Ø) (mm) (Ø) (mm) (Ø) (mm) (Ø) (mm) (Ø) (mm) (Ø) (mm) (Ø) (mm) (Ø) (mm)

COLUMN AND FOOTING PLAN COLUMN AND FOOTING PLAN

2 CHB PERIMETER WALL DETAIL


1 RETAINING WALL WITH CHB FENCE DETAIL

SECTION

ELEVATION @
COMPRESSION SIDE
FOR BIDDING
SECTION
COLUMN AND FOOTING PLAN PLAN

3 WALL BENCHING DETAIL 4 JUNCTION BOX DETAIL

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-8.0
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL DETAILS
3.50m HEIGHT ELEVATION

SECTION A
ALONG ACCESS ROAD 3

4.50m HEIGHT ELEVATION

COLUMN AND
FOOTING
SECTION B
ALONG RESIDENTIAL AREA

2 SLOPE PROTECTION WITH REINFORCED EROSION MAT DETAIL

5.50m HEIGHT ELEVATION

FOR
7.00m HEIGHT ELEVATION 7.50m HEIGHT ELEVATION CONSTRUCTION

1 MACCAFERRI TERRAMESH WITH CHB FENCE DETAIL 3 WIRE MESH FENCE DETAIL

P.A. ALVAREZ PROPERTIES V C A INTERNATIONAL


AND DEVELOPMENT CORP.
Quality
Service
Commitment
CIVIL STRUCTURAL
INC
C-8.1
Unit 5A Karina Building, 33 Shaw Boulevard
Pasig City, Metro Manila Philippines 1600
Tel No. (2) 470-0514
IDESIA DASMARIÑAS - PHASE 3 WALL DETAILS