Plinth Area Rate
Preliminary Estimate
Page 1 of 12
5.2
Page 2 of 12
10
Page 3 of 12
20.3 100
Telephone conduits B.cost 0.25
20.4
Third Party Quality Assurance (preferably on request 100
of client department) B.cost 1.00
21 PASSENGER LIFTS
21.1
Passenger lift Capacity 8 persons, 544Kg, Speed
1.00mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 1,600,000.00
21.2 Additional price for each additional floor E.floor 90,000.00
21.3
Passenger lift Capacity 8 persons, 544Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 1,800,000.00
21.4 Additional price for each additional floor E.floor 90,000.00
21.5
Passenger lift Capacity 13 persons, 884Kg, Speed
1.00mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 1,800,000.00
21.6 Additional price for each additional floor E.floor 90,000.00
21.7
Passenger lift Capacity 13 persons, 884Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,000,000.00
21.8 Additional price for each additional floor E.floor 90,000.00
21.9
Passenger lift Capacity 16 persons, 1088Kg, Speed
1.00mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,400,000.00
21.1 Additional price for each additional floor E.floor 110,000.00
21.11
Passenger lift Capacity 16 persons, 1088Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,600,000.00
21.12 Additional price for each additional floor E.floor 110,000.00
21.13
Passenger lift Capacity 16 persons, 1088Kg, Speed
2.50mtr./sec., Travel G+12, Power operated doors, AC
variable voltage. and variable frequency controls Each 7,000,000.00
21.14 Additional price for each additional floor E.floor 110,000.00
21.15
Bed lift Capacity 20 persons, 1360Kg, Speed
0.75mtr./sec., Travel G+4, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,400,000.00
Page 4 of 12
21.16 Additional price for each additional floor E.floor 110,000.00
21.17
Bed lift Capacity 20 persons, 1360Kg, Speed
1.50mtr./sec., Travel G+5, Power operated doors, AC
variable voltage. and variable frequency controls Each 2,700,000.00
21.18 Additional price for each additional floor E.floor 110,000.00
21.19
Bed lift Capacity 20 persons, 1360Kg, Speed
2.50mtr./sec., Travel G+12, Power operated doors, AC
variable voltage. and variable frequency controls Each 7,500,000.00
21.2 Additional price for each additional floor E.floor 110,000.00
22 GOODS LIFT (2 SPEED)
22.1 Goods lift Capacity 1 Ton Speed 0.50mtr./sec., Travel
G+4 Each 2,600,000.00
22.2 Additional price for each additional floor E.floor 85,000.00
22.3 Goods lift Capacity 2 Ton Speed 0.50mtr./sec., Travel
G+5 Each 3,300,000.00
22.4 Additional price for each additional floor E.floor 85,000.00
22.5 Goods lift Capacity 3 Ton Speed 0.25mtr./sec., Travel
G+12 Each 4,100,000.00
22.6 Additional price for each additional floor E.floor 100,000.00
23 Over head tank without independent staging litre 20.00
24 Over head tank with staging height upto 20 metres litre 30.00
25 Over head tank with staging height between 20 metres
& upto 30 metres litre 35.00
26 Over head tank with staging height between 30 metres
& 40 metres litre 40.00
27 Underground sump litre 20.00
28 Levelling sq.mtr. 300.00
29 Internal roads & paths
29.1 Internal road with WBM and Bituminous top sq.mtr. 175.00
29.2 Internal road with WMM and Bituminous top sq.mtr. 1,600.00
29.3 Cement Concrete pavement with vaccum dewatered
concrete sq.mtr. 2,200.00
29.4 Footpath with PCC base , 60mm thick paver blocks
and kerb stone edging on one side sq.mtr. 2,600.00
30 External Sewerage mtr. 3,300.00
31 Filter Water Supply
31.1 Distribution lines100 mm dia and below mtr. 1,300.00
31.2 Peripheral grid 150 mm to 300 mm dia pipes mtr. 3,600.00
31.3 Unfiltered water supply distribution lines mtr. 1,700.00
32 Storm water drains sq.mtr. 8,600.00
33 Rain Water Harvesting (RWH) sq.mtr. 3,300.00
34 Trenches for services mtr. 6,200.00
Page 5 of 12
35 Boundary wall with 1.5 metre. normal height from
GL & 0.60 meter high MS grill, and including steel
gates / wicket gates etc.
35.1 Composite structure metre 8,600.00
35.2 Precast RCC wall metre 7,500.00
36 HORTICULTURE WORKS
36.1
Page 6 of 12
Amount Code No
1.1
- 1.1.1
- 1.1.1A
- 1.1.1B
- 1.1.2
1.2
- 1.2.1
- 1.2.1A
MR 1.2
- MR 1.2.1B
1.2
- 1.2.2
1.3
1.3.1
- 1.3.1.1
- 1.3.1.2
- 1.3.1.3
- 1.3.1.4
- 1.3.1.5
- 1.3.1.6
Page 7 of 12
- 1.3.2
- 1.3.3
- 1.3.4
- 1.3.5
- 1.3.5A
- 1.3.6
- 1.3.7
- MR 1.3
- MR 1.3.8
- 1.4
- 1.4.1
- 1.4.2
- 1.5
- 1.5.1
- 1.5.2
- 1.6
- 1.6.1
- 1.6.2
Page 8 of 12
- 1.7
- 1.8
- 1.8.1
- 1.8.2
- 2.1
- 2.1A
- 2.1B
- 2.1C
- 2.1D
- 2.1E
- 2.2
- 2.2.1
- 2.2.2
- 2.2.3
- 2.3
- 2.4
- 2.4.1
- 2.4.2
Page 9 of 12
- 2.4.3
- 2.4.4
- 3.1
- 3.1.1
- 3.1.1A
- 3.1.2
- 3.1.2A
- 3.1.3
- 3.1.3A
- 3.1.4
- 3.1.4A
- 3.1.5
- 3.1.5A
- 3.1.6
- 3.1.6A
- 3.1.7
- 3.1.7A
- 3.1.8
Page 10 of 12
- 3.1.8A
- 3.1.9
- 3.1.9A
- 3.1.10
- 3.1.10A
- 3.2
- 3.2.1
- 3.2.1A
- 3.2.2
- 3.2.2A
- 3.2.3
- 3.2.3A
- 4.1
- 4.2
- 4.3
- 4.4
- 4.5
- 5.1
- 5.2
- 5.2.1
- 5.2.2
- 5.2.3
- 5.2.4
- 5.3
- 5.4
- 5.4.1
- 5.4.2
- 5.4.3
- 5.5
- 5.6
- 5.7
Page 11 of 12
- 5.8
- 5.8.1
- 5.8.2
- 5.9
- 5.9.1
- 5.9.2
Page 12 of 12