Expenditure labour
Earth work excavation 2100 19/3/2012 500
Shifting of earth 800 20/03/2012 1000
Bricks 4500 21/03/2012 1000
40 mm aggregate 600 22/03/2012 2500
steel 370 31/03/2012 100
198 4/4/2012 1000
ravi 100
plumber 650
plumbing material 3280
40mm aggregate 1000
horse dug 330
BAYYA, APPANNA 450
3000 CEMENT
1600 STEEL
6100
Total 25078
Balance 4922
material
cement
19/03 3 bags raa kr
20/03 3 bags raa kr
21/03 5 bags raa kr
1 bags mt
22/03 2 bags raa kr
04/03/ 1 bags raa kr
15 6 9 2700
steel 6 nos 10 mm raa kr
sand 8 bags
3 bags
3100
19/3 lab 500
20/3 lab 1000
steel 370
21/3 1000
22/3 steel 198
3068
32
13
16
18
21
EXPENDITURE DETAILS FOE CONSTRUCTION OF SEPTIC TANK