B Drawings
3 Overall Sub station Layout Plan & Section Layout 15.Sep.2018 6.Sep.2018 10.Dec.2018
Civil Related
A Drawings
1 Levelling layout 15.Sep.2018 2.Nov.2018 20.Nov.2018
2 Layout of Bore hole, trial pit & plate load 24.Sep.2018 27.Sep.2018 16.Oct.2018
3 Layout of ERT Points 24.Sep.2018 27.Sep.2018 16.Oct.2018
4 Out Door foundation layout (tower & equipment's) 16.Apr.2019 23.Apr.2019
5 Boundary Wall Layout & Section
6 Drain layout
7 Layout & Details of Roads
8 Control Room building Cable Trench Layout
9 Details of Chain link fencing
10 Layout for PCC & Metals Spreading
11 Retaining Wall
External water supply arrangement for control room cum
12 administrative building, Fire fighting tank, Transit camp & Security
Room
13 External sewerage system for control room cum administrative
building, Transit Camp & Security Room.
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
A/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
omprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal Rev. No.:
CAT-IV
CAT-II 21.Oct.2019 4.Nov.2019 IV 15.Nov.2019 4.Dec.2019 IV*
5-NER/SS-3767/3/G4/CA-II/7649 dtd.09/04/2018
Status as on
5.Mar.2020
R3 R4 REMARKS
Approval Submitted Comments Approval
Category Received Category
Approved
Approved
Submitted for Approval
Approved
Approved
Approved In GA
Approved
Approved
Approved
Approved
To be submit later
To be submit later
To be submit later after
finalize of GA
To be submit later after
finalize of GA
To be submit later
To be submit later
Approved
Approved
Approved
Submitted for Approval
PGCIL issued std drg for
construction.
ENGINEER
CC-CS/165-NER/SS-3767/3/G4/NOA/7648 & NO
PROJECT: Substation Package SS01B under Comprehens
Pradesh.
CUSTOMER: Power Grid Corporation
B Drawings
Civil Related
A Drawings
1 Levelling layout 26.Sep.2018
2 Layout of Bore hole, trial pit & plate load 24.Sep.2018
3 Layout of ERT Points 24.Sep.2018
4 Out Door foundation layout (tower & equipments)
5 Boundary Wall Layout & Section
6 Drain layout
7 Layout & Details of Roads
8 Control Room building Cable Trench Layout
9 Details of Chain link fencing
10 Layout for PCC & Metals Spreading
11 Retaining Wall
External water supply arrangement for control room cum administrative
12 building, Fire fighting tank, Transit camp & Security
Room
13 External sewerage system for control room cum administrative
building, Transit Camp & Security Room.
14 SLAB CULVERT DESIGN CALCULATION OUTSIDE SWTICHYARD
15 SLAB CULVERT DRAWING OUTSIDE SWTICHYARD
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
65-NER/SS-3767/3/G4/NOA/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
n Package SS01B under Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal
R2 R3 REMARKS
Approval Submitted Comments Approval
Category Received Category
CAT-IV Approved
Approved
CAT-IV 15.Nov.2019 4.Dec.2019 IV* Approved
Approved
CAT-I* Approved
Approved
Approved
Approved In GA
CAT-I Approved
Approved
Approved
IV Approved
To be submit later
To be submit later
CAT-I* Approved
CAT-I* Approved
To be submit later
To be submit later
Approved
Approved
Approved
Approved
PGCIL issued std drg for
construction.
To be submit later
PGCIL standard Drg. to be used
To be submit later
To be submit later
Submitted via mail to PM
ENGINEE
PROJECT:
CUSTOMER:
PROJECT CODE :
Engineering documents
Electrical Related Letter no.
Sl.No Description
A Design Calculation & Documents
1 DSLP Calculations
2 SAG tension calculations (If required)
3 Battery & Charger calculations
4 Earth Mat Design Calculation
5 Erection Bill of Quantity
B Drawings
Civil Related
A Drawings
1 Levelling layout
2 Layout of Bore hole, trial pit & plate load
3 Layout of ERT Points
4 Soil Investigation Report
15.Feb.2019
15.Feb.2019
30.Nov.2018
3.Dec.2018
26.Feb.2019
26.Feb.2019
18.Dec.2020
18.Dec.2020
18.Dec.2020
18.Dec.2020
for
bution System in Rev. No.: ELECTRICAL Deliverables
R2 R3 REMARKS
Comments Approval Submitted Comments Approval
Received Category Received Category
Approved
Approved
30.May.2019 Approved
To be submit later
To be submit later
Cable Trench layout will be
developed in Foundation Layout.
To be submit later
To be submit later
Approved
Approved
Approved
Approved from site
To be submit later (After standard
drawing receive from PGCIL)
Engineering documents
Electrical Related Proposed Date of
Submission
Sl.No Description
A Design Calculation & Documents
1 DSLP Calculations
2 Erection Bill of Quantity
B Drawings
Civil Related
A Drawings
1 Levelling layout
2 Layout of Bore hole, trial pit & plate load
3 Layout of ERT Points
4 Out Door foundation layout (tower & equipments)
5 Out Door cable Trench & details
6 Layout for PCC & Metals Spreading
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
-NER/SS-3767/3/G4/NOA/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
Package SS01B under Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal
Power Grid Corporation of India (PGCIL) LOI No.: CC-CS/165-NER/SS-3767/3/G4/CA-I/7648 & CC-CS
200209 SUBSTATION - 132/33kV Ziro (EXISTING)
R0 R1 R2
Submitted Comments Approval Submitted Comments Approval Submitted Comments
Received Category Received Category Received
R2 R3 REMARKS
Approval Submitted Comments Approval
Category Received Category
Approved
CAT-I Approved
Subject to approval of Key SLD
Approved
Subject to approval of layout
Approved
Approved
N/A
Approved
N/A
To be submit later
To be submit later
Approved
Approved
Approved
Approved
Approved