ENGINEER

CC-CS/165-NER/SS-3767/3/G4/NOA/7648 & NOA-II/7649 both dated 28.02


PROJECT: Substation Package SS01B under Comprehensive Scheme for Strengthenin
Pradesh.
CUSTOMER: Power Grid Corporation of India (PGCIL)

PROJECT CODE : 200209 SUBSTATION - 132


Engineering documents R0
Electrical Related Proposed Date of Submitted Comments
Submission Received
Sl.No Description
A Design Calculation & Documents
1 DSLP Calculations 25.Sep.2018 30.Jan.2019 5.Feb.2019
2 SAG tension calculations (If required) 15.Sep.2018
3 Battery & Charger calculations 25.Dec.2018
4 Earth Mat Design Calculation 2.Oct.2018 17.Mar.2019 22.Mar.2019
5 Erection Bill of Quantity 30.Nov.2018 14.Mar.2019 16.Apr.2019

B Drawings

1 Single line Diagram with BOM 7.Aug.2018 7.Aug.2018 24.Aug.2018

2 Protection & Metering SLD 5.Sep.2018

3 Overall Sub station Layout Plan & Section Layout 15.Sep.2018 6.Sep.2018 10.Dec.2018

4 AC Auxiliary System Distribution scheme SLD 15.Dec.2018 22.Feb.2019 7.Mar.2019


5 DC Auxiliary System Distribution scheme SLD 15.Dec.2018 22.Feb.2019 7.Mar.2019
6 Clearance Diagram 4.Sep.2018
7 DSLP Layout 25.Sep.2018 30.Jan.2019 5.Feb.2019
8 Overall Sub station Grounding layout with Earth Pit 20.Oct.2018 19.Mar.2019 22.Mar.2019
9 Structural layout Arrangement and section drawing 15.Sep.2018 31.Oct.2018 10.Dec.2018
10 Erection key Diagram (plan & section) along with IPS tube 30.Nov.2018 14.Mar.2019 16.Apr.2019
Cutting schedule
11 Control Room cable trench 15.Feb.2019
12 Control room building Panel arrangement layout 15.Feb.2019
13 Switch yard cable trench layout 31.Oct.2018 14.Mar.2019 17.Apr.2019

14 Buried cable trench layout 5.Nov.2018 14.Mar.2019 17.Apr.2019

15 Power cable Schedule & Inter Connection Details for LV System

16 Control cable Schedule & Inter Connection Details

Civil Related
A Drawings
1 Levelling layout 15.Sep.2018 2.Nov.2018 20.Nov.2018
2 Layout of Bore hole, trial pit & plate load 24.Sep.2018 27.Sep.2018 16.Oct.2018
3 Layout of ERT Points 24.Sep.2018 27.Sep.2018 16.Oct.2018
4 Out Door foundation layout (tower & equipment's) 16.Apr.2019 23.Apr.2019
5 Boundary Wall Layout & Section

6 Drain layout
7 Layout & Details of Roads
8 Control Room building Cable Trench Layout
9 Details of Chain link fencing
10 Layout for PCC & Metals Spreading
11 Retaining Wall
External water supply arrangement for control room cum
12 administrative building, Fire fighting tank, Transit camp & Security
Room
13 External sewerage system for control room cum administrative
building, Transit Camp & Security Room.
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
A/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
omprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal Rev. No.:

Corporation of India (PGCIL) LOI No.: CC-CS/165-NER/SS-3767/3/G4/CA-I/7648 & CC-CS/165-NER/SS-3767/3/G4/CA-II/76

SUBSTATION - 132/33kV Ziro (New)


R0 R1 R2 R3
Approval Submitted Comments Approval Submitted Comments Approval Submitted Comment
Category Received Category Received Category s
Received

CAT-I 23.Apr.2109 26.Apr.2019 IV

CAT-IV
CAT-II 21.Oct.2019 4.Nov.2019 IV 15.Nov.2019 4.Dec.2019 IV*

CAT-III 6.Sep.2018 20.Sep.2018 CAT-I* 16.Aug.2019 23.Aug.2019 CAI-I

CAT-III 14.Dec.2018 18.Dec.2018 CAT-II 4.Jan.2019 4.Jan.2019 CAI-I* 16.Aug.2019 26.Aug.2019

CAT-III 16.Apr.2019 10.May.2019 CAT-I*


CAT-III 16.Apr.2019 10.May.2019 CAT-I

CAT-I 23.Apr.2109 26.Apr.2019 CAT-I


CAT-II 16.Apr.2019 23.Apr.2019 CAT-I 11.Sep.2019 12.Sep.2019 CAT-I
CAT-II 14.Dec.2018 18.Dec.2018 CAT-I
CAT-II 21.Oct.2019 30.Oct.2019 CAT-IV*

CAT-III 27.Sep.2019 10.Oct.2019 CAT-II

CAT-III 27.Sep.2019 10.Oct.2019 CAT-II

CAT-II 22.Mar.2019 16.Apr.2019 CAT-I


CAT-II 1.Nov.2018 10.Dec.2018 CAT-I
CAT-II 1.Nov.2018 10.Dec.2018 CAT-I
CAT-II
ELECTRICAL Deliverables

5-NER/SS-3767/3/G4/CA-II/7649 dtd.09/04/2018
Status as on

5.Mar.2020

R3 R4 REMARKS
Approval Submitted Comments Approval
Category Received Category

Approved

Approved
Submitted for Approval

Approved, drawing revise due


to one bay increasing.

Approved, DOAP has given


CAI-I* some comment in GA layout

Approved
Approved
Approved In GA
Approved
Approved
Approved
Approved

To be submit later
To be submit later
To be submit later after
finalize of GA
To be submit later after
finalize of GA
To be submit later

To be submit later

Approved
Approved
Approved
Submitted for Approval
PGCIL issued std drg for
construction.
ENGINEER
CC-CS/165-NER/SS-3767/3/G4/NOA/7648 & NO
PROJECT: Substation Package SS01B under Comprehens
Pradesh.
CUSTOMER: Power Grid Corporation

PROJECT CODE : 200209


Engineering documents
Electrical Related Proposed Date of
Submission
Sl.No Description
A Design Calculation & Documents
1 DSLP Calculations 10.Oct.2018
2 SAG tension calculations (If required) 20.Sep.2018
3 Battery & Charger calculations 25.Dec.2018
4 Earth Mat Design Calculation 30.Oct.2018
5 Erection Bill of Quantity 15.Dec.2018

B Drawings

1 Single line Diagram with BOM 7.Aug.2018


2 Protection & Metering SLD 11.Sep.2018

3 Overall Sub station Layout Plan & Section Layout 11.Sep.2018


4 AC Auxillary System Distribution scheme SLD 30.Dec.2018
5 DC Auxillary System Distribution scheme SLD 30.Dec.2018
6 Clerance Diagram 19.Sep.2018
7 DSLP Layout 10.Oct.2018
8 Overall Sub station Grounding layout with Earth Pit 30.Oct.2018
9 Structural layout Arrangement and section drawing 20.Sep.2018
10 Erection key Diagram (plan & section) along with IPS tube Cutting 15.Dec.2018
schedule
11 Control Room cable trench 15.Feb.2019
12 Cotrol room building Panel arrangement layout 15.Feb.2019
13 Switch yard cable trench layout 15.Nov.2018
14 Buried cable trench layout 30.Nov.2018
15 Power cable Schedule & Inter Connection Details for LV System 26.Feb.2019
16 Control cable Schedule & Inter Connection Details 26.Feb.2019

Civil Related
A Drawings
1 Levelling layout 26.Sep.2018
2 Layout of Bore hole, trial pit & plate load 24.Sep.2018
3 Layout of ERT Points 24.Sep.2018
4 Out Door foundation layout (tower & equipments)
5 Boundary Wall Layout & Section

6 Drain layout
7 Layout & Details of Roads
8 Control Room building Cable Trench Layout
9 Details of Chain link fencing
10 Layout for PCC & Metals Spreading
11 Retaining Wall
External water supply arrangement for control room cum administrative
12 building, Fire fighting tank, Transit camp & Security
Room
13 External sewerage system for control room cum administrative
building, Transit Camp & Security Room.
14 SLAB CULVERT DESIGN CALCULATION OUTSIDE SWTICHYARD
15 SLAB CULVERT DRAWING OUTSIDE SWTICHYARD
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
65-NER/SS-3767/3/G4/NOA/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
n Package SS01B under Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal

Power Grid Corporation of India (PGCIL) LOI No.: CC-CS/165-NER/SS-3767/3/G4/CA


3767/3/G4/CA-II/764
200209 SUBSTATION - 132/33kV BASAR
R0 R1 R2
Submitted Comments Approval Submitted Comments Approval Submitted Comments
Received Category Received Category Received

30.Jan.2019 5.Feb.2019 CAT-III 13.Feb.2019 20.Feb.2019 CAT-I* 23.Apr.2109 26.Apr.2019

17.Mar.2019 22.Mar.2019 CAT-III 23.Apr.2109 26.Apr.2019 CAT-IV


13.Feb.2019 16.Apr.2019 CAT-III 10.May.2019 2.Jul.2019 CAT-II 10.Jul.2019 12.Jul.2019

7.Aug.2018 24.Aug.2018 CAT-III 6.Sep.2018 20.Sep.2018 CAT-I

12.Sep.2018 15.Dec.2018 CAT-III 4.Jan.2019 7.Jan.2019 CAT-I* 6.Mar.2019 11.Mar.2019


22.Feb.2019 7.Mar.2019 CAT-III 16.Apr.2019 10.May.2019 CAT-I*
22.Feb.2019 7.Mar.2019 CAT-III 16.Apr.2019 10.May.2019 CAT-I

30.Jan.2019 5.Feb.2019 CAT-III 13.Feb.2019 20.Feb.2019 CAT-I* 23.Apr.2109 26.Apr.2019


19.Mar.2019 22.Mar.2019 CAT-III 23.Apr.2109 26.Apr.2019 CAT-I
31.Oct.2018 15.Dec.2018 CAT-II 4.Jan.2019 4.Jan.2019 CAT-I
13.Feb.2019 16.Apr.2019 CAT-III 10.May.2019 2.Jul.2019 II 10.Jul.2019 12.Jul.2019

14.Mar.2019 23.Apr.2019 CAT-III 6.May.2019 9.May.2019 CAT-V 24.May.2019 13.Jun.2019


14.Mar.2019 23.Apr.2019 CAT-III 6.May.2019 9.May.2019 CAT-V 24.May.2019 13.Jun.2019

2.Nov.2018 20.Nov.2018 CAT-I


27.Sep.2018 16.Oct.2018 CAT-II 1.Nov.2018 10.Dec.2018 CAT-I
27.Sep.2018 16.Oct.2018 CAT-II 1.Nov.2018 10.Dec.2018 CAT-I
14.Mar.2019 28.Mar.2019 CAT-II 6.May.2019 10.May.2019 CAT-I*
11.Dec.2020
11.Dec.2020
Rev. No.: ELECTRICAL Deliverables

65-NER/SS-3767/3/G4/CA-I/7648 & CC-CS/165-NER/SS- Status as on


3767/3/G4/CA-II/7649 dtd.09/04/2018
5.Mar.2020

R2 R3 REMARKS
Approval Submitted Comments Approval
Category Received Category

CAT-IV Approved

Approved
CAT-IV 15.Nov.2019 4.Dec.2019 IV* Approved

Approved

CAT-I* Approved
Approved
Approved
Approved In GA
CAT-I Approved
Approved
Approved
IV Approved

To be submit later
To be submit later
CAT-I* Approved
CAT-I* Approved
To be submit later
To be submit later

Approved
Approved
Approved
Approved
PGCIL issued std drg for
construction.
To be submit later
PGCIL standard Drg. to be used
To be submit later

To be submit later
Submitted via mail to PM
ENGINEE

PROJECT:

CUSTOMER:

PROJECT CODE :
Engineering documents
Electrical Related Letter no.

Sl.No Description
A Design Calculation & Documents
1 DSLP Calculations
2 SAG tension calculations (If required)
3 Battery & Charger calculations
4 Earth Mat Design Calculation
5 Erection Bill of Quantity

B Drawings

1 Single line Diagram with BOM


2 Protection & Metering SLD
3 Overall Sub station Layout Plan & Section Layout
4 AC Auxillary System Distribution scheme SLD
5 DC Auxillary System Distribution scheme SLD
6 Clerance Diagram
7 DSLP Layout
8 Overall Sub station Grounding layout with Earth Pit
9 Structural layout Arrangement and section drawing
10
Erection key Diagram (plan & section) along with IPS tube Cutting schedule

11 Control Room cable trench


12 Cotrol room building Panel arrangement layout
13 Switch yard cable trench layout
14 Buried cable trench layout
15 Power cable Schedule & Inter Connection Details for LV System
16 Control cable Schedule & Inter Connection Details

Civil Related
A Drawings
1 Levelling layout
2 Layout of Bore hole, trial pit & plate load
3 Layout of ERT Points
4 Soil Investigation Report

4 Out Door foundation layout (tower & equipments)


5 Boundary Wall Layout & Section
6 Drain layout
7 Layout & Details of Roads
8 Control Room building Cable Trench Layout
9 Details of Chain link fencing
10 Layout for PCC & Metals Spreading
11 Switchyard Retaining Wall Layout detail 75
12 Switchyard Retaining Wall design Calculation 75
13 Swtichyard drainage layout detail 75
14 Swtichyard drainage layout design calcuation 75
External water supply arrangement for control room cum administrative building,
15 Fire fighting tank, Transit camp & Security Room
External sewerage system for control room cum administrative building, Transit
16 Camp & Security Room.
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
CC-CS/165-NER/SS-3767/3/G4/NOA/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
Substation Package SS01B under Comprehensive Scheme for Strengthening of Transmission & Distribution System in
Arunachal Pradesh.
Power Grid Corporation of India (PGCIL) LOI No.: CC-CS/165-NER/SS-3767/3/G4
3767/3/G4/CA-II/7
200209 SUBSTATION - 132/33kV GERUKAMUKH
R0 R1 R2
Proposed Date of Submitted Comments Approval Submitted Comments Approval Submitted
Submission Received Category Received Category

22.Mar.2019 28.Mar.2019 CAT-II 19.Jun.2019 26.Jun.2019 CAT-III 2.Jul.2019

11.Sep.2019 23.Sep.2019 CAT-II


23.Jul.2019 4.Sep.2019 CAT-IV* 15.Nov.2019 4.Dec.2019 IV*

7.Aug.2018 7.Aug.2018 24.Aug.2018 CAT-III 6.Sep.2018 20.Sep.2018 CAT-I* 29.May.2019


5.Sep.2018
10.Sep.2018 30.Jan.2019 20.Feb.2019 CAT-II 6.Mar.2019 18.Mar.2019 CAT-I* 12.Jun.2019
15.Jan.2019 16.Apr.2019 13.Jun.2019 CAT-I*
15.Jan.2019 16.Apr.2019 13.Jun.2019 CAT-I*
19.Sep.2018
15.Oct.2018 22.Mar.2019 28.Mar.2019 CAT-II 19.Jun.2019 26.Jun.2019 CAT-III 2.Jul.2019
12.Nov.2018 11.Sep.2019 23.Sep.2019 CAT-II
20.Sep.2018 14.Mar.2019 18.Mar.2019 CAT-II 16.Apr.2019 23.Apr.2019 CAT-I
28.Dec.2018 23.Jul.2019 4.Sep.2019 CAT-IV

15.Feb.2019
15.Feb.2019
30.Nov.2018
3.Dec.2018
26.Feb.2019
26.Feb.2019

14.Dec.2018 14.Dec.2018 21.Jan.2019 CAT-I 22.Mar.2019 16.Apr.2019 CAT-I


30.Nov.2018 30.Nov.2018 10.Dec.2018 CAT-I
30.Nov.2018 30.Nov.2018 10.Dec.2018 CAT-I
8.Jan.2020 CAT-I

18.Dec.2020
18.Dec.2020
18.Dec.2020
18.Dec.2020
for
bution System in Rev. No.: ELECTRICAL Deliverables

CC-CS/165-NER/SS-3767/3/G4/CA-I/7648 & CC-CS/165-NER/SS- Status as on


3767/3/G4/CA-II/7649 dtd.09/04/2018
5.Mar.2020

R2 R3 REMARKS
Comments Approval Submitted Comments Approval
Received Category Received Category

12.Jul.2019 CAT-I Approved

Approved
Approved

30.May.2019 Approved

21.Jun.2019 CAT-I* Approved


Approved
Approved
Approved In GA
12.Jul.2019 CAT-I Approved
Approved
Approved
Approved

To be submit later
To be submit later
Cable Trench layout will be
developed in Foundation Layout.
To be submit later
To be submit later

Approved
Approved
Approved
Approved from site
To be submit later (After standard
drawing receive from PGCIL)

PGCIL standard Drg. to be used

Submitted via mail to Project


Submitted via mail to Project
Submitted via mail to PGCIL
Submitted via mail to PGCIL
ENGINEER
CC-CS/165-NER/SS-3767/3/G4/NOA/7648 &
PROJECT: Substation Package SS01B under Comprehen
Pradesh.
CUSTOMER: Power Grid Corporation
PROJECT CODE : 200209

Engineering documents
Electrical Related Proposed Date of
Submission
Sl.No Description
A Design Calculation & Documents
1 DSLP Calculations
2 Erection Bill of Quantity

B Drawings

1 Single line Diagram with BOM

2 Protection & Metering SLD

3 Overall Sub station Layout Plan & Section Layout


4 DSLP Layout
5 Overall Sub station Grounding layout with Earth Pit
6 Structural layout Arrangement and section drawing
7
Erection key Diagram (plan & section) along with IPS tube Cutting schedule

8 Cotrol room building Panel arrangement layout


9 Switch yard cable trench layout
10 Panel Arrangement layout Drawing for Kiosk
11 Power cable Schedule & Inter Connection Details for LV System
12 Control cable Schedule & Inter Connection Details

Civil Related
A Drawings
1 Levelling layout
2 Layout of Bore hole, trial pit & plate load
3 Layout of ERT Points
4 Out Door foundation layout (tower & equipments)
5 Out Door cable Trench & details
6 Layout for PCC & Metals Spreading
ENGINEERING MASTER DRAWING/DOCUMENT LIST (MDL)
-NER/SS-3767/3/G4/NOA/7648 & NOA-II/7649 both dated 28.02.2018 (Supply & Erection) for
Package SS01B under Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal

Power Grid Corporation of India (PGCIL) LOI No.: CC-CS/165-NER/SS-3767/3/G4/CA-I/7648 & CC-CS
200209 SUBSTATION - 132/33kV Ziro (EXISTING)

R0 R1 R2
Submitted Comments Approval Submitted Comments Approval Submitted Comments
Received Category Received Category Received

21.Oct.2019 4.Nov.2019 IV 15.Nov.2019 4.Dec.2019 IV*

7.Aug.2018 24.Aug.2018 CAT-III 6.Jun.2018 20.Jun.2018 CAT-I 6.Aug.2019 23.Aug.2019

2.Aug.2019 23.Aug.2019 CAT-II 27.Sep.2019 10.Oct.2019 CAT-I*

22.Jan.2020 23.Jan.2020 CAT-I

21.Oct.2019 4.Nov.2019 CAT-IV

27.Sep.2019 10.Oct.2019 CAT-I

23.Jan.2019 28.Jan.2019 CAT-I


NA
Rev. No.: ELECTRICAL Deliverables

ER/SS-3767/3/G4/CA-I/7648 & CC-CS/165-NER/SS- Status as on


5.Mar.2020

R2 R3 REMARKS
Approval Submitted Comments Approval
Category Received Category

Approved

CAT-I Approved
Subject to approval of Key SLD

Approved
Subject to approval of layout
Approved

Approved

N/A
Approved
N/A
To be submit later
To be submit later

Soil Report Not Approved


Equipment Status sheet Arunachal Sub-Station Project (SS01B)

Sl.No EQUIPMENTS DESCRIPTION Submission Date Approval Date


132KV & 33KV LA Drawing & Documents 28.Aug.2018 18.Sep.2018
1 (M/S OBLUM) GTP 28.Aug.2018 18.Sep.2018
Type Test 28.Aug.2018 18.Sep.2018
132KV CVT (M/S Drawing & Documents
2 Mehru) GTP
Type Test
132KV Circuit Breaker Drawing & Documents
3 (M/S ABB) GTP
Type Test
132KV CT (M/S Drawing & Documents 18.Feb.2020
4 Mehru) GTP 18.Feb.2020
Type Test 18.Feb.2020
Drawing & Documents 2.Mar.2020
5 132KV Isolator (S&S) GTP 2.Mar.2021
Type Test 2.Mar.2021
Drawing & Documents 10.Oct.2019
6 5MVAR Reactor (CGL) GTP 10.Oct.2019
Type Test
BPI (ABI) 132kV & Drawing & Documents 27.06.2019 & 29.08. 01.07.2019 & 25.09.2
7 33kV GTP 27.06.2019 & 29.08. 01.07.2019 & 25.09.2
Type Test 27.06.2019 & 29.08. 01.07.2019 & 25.09.2
Drawing & Documents 13.Jan.2020 28.Jan.2020
8 PLCC & DPC (GE) GTP 13.Jan.2020 28.Jan.2020
Type Test 13.Jan.2020 28.Jan.2020
Drawing & Documents 23.Apr.2019 26.Apr.2019
9 Wave Trap GTP 23.Apr.2019 26.Apr.2019
Type Test 23.Apr.2019 26.Apr.2019
Drawing & Documents 27.Feb.2020
10 5MVA Transformer GTP 27.Feb.2020
Type Test
33kV GIS Switchgear Drawing & Documents
11 (L&T) GTP
Type Test
Drawing & Documents 12.Dec.2019
12 33KV Isolator (S&S) GTP 12.Dec.2019
Type Test 12.Dec.2019
Drawing & Documents
13 LT Transformer GTP
Type Test
LT Switchgear (Amar Drawing & Documents 13.Feb.2020 18.Feb.2020
14 Raja) GTP 13.Feb.2020 18.Feb.2020
Type Test 13.Feb.2020 18.Feb.2020
Drawing & Documents
15 C&R with SAS GTP
Type Test
b-Station Project (SS01B)

Remarks (Dt. 05.03.20)

Approved

Awaited drawing form Vendor

Revise Drawing Submitted. PGCIL give Commet, vendor has not


reply

Revise Drawing Submitted. Awaiting Approval

Approved, Type test not received

Approved

Approved

Approved

Drawing Submitted. Awaiting Approval

Awaited drawing form Vendor

Submitted. Awaiting Approval

Awaited drawing form Vendor

Approved

Awaited drawing form Vendor