You are on page 1of 7
CMC PRIME BUILDERS AND TRADING CORPORATION Brgy., Malineng, - Cuyapo, Nueva Ecija Cellphone # 0926 - 735 - 0163, Ceti ad JOB MIX FORMULA PROvECT + Earthquake Damage Repair at SCTEX LOCATION SCTEX TTEM No. :ATB SPECIFICATION; DFWIL 2013) Standard Specifications for Roads and Bridges SUPPLIER, EMC Prime Builders and Trading Corp. CONTRACTOR —_: GeotechaiesPhitppine Inc, 4 SOURCE OF RAW MATERIALS Ad 2% max. sie apsregates tecta, Mayantoe Tarlac A2 Imax size aggrepaes eta, Mayantoe Tarlac AS VB" max. size aggregates lect, Mayante Tarlac AA Fine Aggregates Crushed St Fleets, Mayante Tarlac AS. Hydrated Lime (C30 Trading. Antipolo Rial ‘A Asphalt Cement, Pen Grae 60°70 Petron Corp. Limay Batan B, SPECIFIC GRAVITY OF RAW MATERIALS BULK:dry APPARENT B11" max sie arenes 2.900 2920 2 34" max, sire aggregates 2.790 2860 BLS VR" max size aggregates 2770 2880 BA. Fine Aggregates.Crushed 1 2.700 2.790 BS. Reclame Filler 2m 2m 36 Hydrad Lime 2187 BLT Asphalt Cement, Pen Grade 6070 1.030 HOT BIN PERCENTAGE COMPOSITION OF MATERIALS. By Weight of Aga C1 K4sBin Nos, 1" Aggregates 20.00% C2 KSBinNo.s, 3/4" Ageroeates 17.00% C3 K2-Bia No.2, 38° Agerogstes 20.00% C4 KL-BiaNo, Crusted ST 39.00% + CS. FieRechaime Filer 2.00% C6 F2-Hydated lime Loss 00.00% b, BATCH WEIGHT/PERCENTAGE COMPOSITION OF MATERIALS By Weight of Mix kilograms DAL K#BiaNo., 1 Aggregates 19.1% 1910 D2 K3-BiaNo.3, 3/4" Agerozates 162% 124 D3. K2Bin No.2, 3/8" Aggregates 19.1% 1910 Da KI-Bia No.l, Crushed $1 31.2% ans DS. FleReclaime Fille 29% 287 D6 Hydrated Lime Lo 10 DLT Asphalt Cement ee a 99.9% 999 E ‘COMBINED GRADING OF AGGREGATES: Sieve Size Results Job Mix General Designation % Passing Tolerances Specification 2 500mm — 100 100 100 Liat 375mm 100 90 = 100 90 = 100 280mm 88 2-94 78-98 34° 200mm 75 70 +81 10-90 38 9S mm 2 50-58 50-75 HM 47Sem 44 7 #10 0.6000 36 B40 = 50 #40 0212um 18 Is -22 15-28 5200 07S um 3-6 3-10 B ‘TEST PROPERTIES OF MIX (MARSHALL METHOD) Speciation Results Tolerance Min, Mas, F.1 Asphalt Content 450 410 490 (by wight of Mix) ‘Asphalt Content (by weight oF Ags) a7 431 sul F2_ Bulk Specitie Gravigy at TS blows back to back 2433 3 Marshall Stability, RN tos 10 kN /2222 Ibs. Min FA Flow, 0.01 neh (0.2501) 325 20 so FS AitVoids, 627 40 70 6. Voide ied with AC out « 8 7 Voids in Mineral Agerogats ira 1s : ‘TEMPERATURE Specitistion Toleraee Min Mas. "c c 6.1 PugmillMixing Temperature e109) bs 163 6.2 Laying Temperate (10) us : 6.3 Compaction Temperature (+10) us : #. COMBINED SPECIFIC GRAVITIY Ht Combined Bulk Sp.Ge(Gsb) 2m 1.2 Combined EM Sp.Gr(Gse) 2791 Prepared by Checked by: Mary Abigail Colantes (CMC Prime Builders. = QC Engineer Approved by: Marco $. Dela Cruz, “Materials Engineer / Client Representative Ce Boveany ves | ou [oom | os | wee | uve ais OFRy ete ene nev oer [soz | oor | 108 | ooz | 100 eure | oves | oon [owes Joos] oss | vos | oa Cr a zost | ozer | oszz |ovoes [owes | oss | vs | ca ze_| soz | +00 soez | oves | osez [oowes Joos | os | ves | va vuaav wes_| orm [evo | wos | oosz | ave a a 168 ce sore | over [ove Joue fos] os | xs | co 298 09 wore | over | ozzz [owe [one | os | ea | ca 106 zee sez | oves | ovze [ovser [oeses | os | os | ro VuaAy zoo | wis [aver | veo | some | vere Hoorv wos ny ws [ne | co | ovr | 060 | over [oerer [ow | osy | wy | eo soo | zz | cos seve [ons | occ [ovrer [owas | osv | av | co z6_[ soz [ coo vevz | vos | vee [ocver [ores | osw | zy | ro Vuaay eos | wis [cos | we | eee | vere ao vu a AY ws _[ woz | roo vere | 0105 | ove [owes [osezr | ov | av | va wo_[ woe_| 209 weve | suis | soez [ocver [ower | cov [wv | va vuaay vos | sesy | ossr | we | soe | weve so vu 3 AY os | we wre | 00s | vom [ous [over | ose | coe | ov we | 96 ive | oe0s | ove [ooze [owe | ove | coe | cv ea | eo weve | 090s | oszz [oveer [ower | ove | ove | ww co) Go_[ easy [way [2)_[rouese [overs [owe] 90 | 0 omic | wpe [Pen spon re | > | ouron | NOM reer | on mors ou, | 88R8S | ng u6sonn | ei oy ew ‘saennmn [Aa ov] ha ovr Tore (099) se} J0Aer5 45005 eNO Tae R10 V 0 hne9 synods tLe (gs0)se1e6o0y 0 AperD oyeeds na ar 09 #9219 vowenaueg GOHLAW TIVHSYYW Aq VLVC NOISIO XIN LTWHASY aly ‘Supe ‘ON wen, we ‘2ye60166e 30 1yBioM Aq % “O° wnuind os ‘unpa jo wyBtom hq % “ory wnwundo os ood B Angers os uepen @ vA osy vy UEIPEN © SpION sy xan fq wuaquoo weudsy | 2aw ha wuatu0g weudsy aw Aq wuaruo9 weudsy oss os ose wy ose Joss ws osy oy ose oss 00s or co ose ove oo'se | cove ws ooos ov coor T 00°55 oorst oott & ooo < ost S cont = oom 8 ooo = coer & oom ost * | cose | over ost | t 0008 over cost | ose cost aq quawuog yeudsy AW fq wu2qU09 weUdsy aw Aq quaquog weudsy s oss 0S. Osk wy ste OSS 00S OsY Yas oss ws osy ow ose = S ore oo osez = - | os lie © os g eee jure 8 | ors & ose | osrz i os = aos & lowe oror = nse ire = 00% oe ovot & ose & powe at 008 touwe | oott we povz | s200 “9°D -SApHNg seeuibua 0-SiepIng wd OID ‘Save eBay Kew ‘kg, payoo49, ‘Aq payndusog, aw s [ve] oor] or] xen a | = | a 06 [oor | au _| NOUNOISIORES |e ca a oor _oor_| Vinwwos KW aor] oi | ow |__| ae | we | | en |__| 21S 3N3I6| a A ER TSN we [we | wy | oF | wr | ooy | oor | wr | oor [oor eo | seer | oz | ooet | 006 | ose | woes | ooee | over ooee ‘oo| ozo] 020 | 020] oez | ove | _oo0z_|_o002_| ov 02 _joo0z oo [000 | _zr0 | ts0_]aos_[ seo | oozr | ous | o0zr_oozs oo | 000 | 000 | ovo] 000 | os | oze | o002_| 0002 _oo0z [pane ‘ONISS¥ INSOWSS a el a ee ‘Wwhuavw 40 NOLLVaYES. av NI@.LOH - NOIS3C XI SNONIINNLIA se0ulbug 90-siepIng awd ONO —sanne6D ebay Kew “Aq payndwiog, : : eT UI NOLWOISIDIES ——— 3 vinwuoa an sot — oF o 8 ae : : 2 aly . HAYND ONIGVAD - Republic of the Philippines + DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CENTRAL OFFICE Manila March 12, 2020 Engr. LOURENMEY B, GERAGA Plant Officer In Charge CMC Prime Bullders and Trading Corp. Brgy. Malineng, Cuyapo Nueva Ecija Dear Engr. Geraga: This refers to your application for the initial accreditation of CMC Prime Builders and Trading Corp. mechanically operated (By Weight) asphalt batching plant located at Brgy. Malineng, Cuyapo, Nueva Ecija to supply bituminous hot mix to DPWH infrastructure projects. Please be informed that upon evaluation/assessment of the submitted documents by the BRS accreditors, said documents were found to be in accordance with Department Order No. 253, Series of 2003 "Guidelines on Accreditation of Portiand and Asphalt Cement Concrete Batching Plants”. However, it was observed by the BRS accreditors during the actual inspection/assessment of your batching plant that the procurement of basic asphalt testing equipment is still in progress, while the quality control of the materials and the bituminous hot mix are being undertaken either by government or other accredited private testing laboratories. In view hereof and pending compliance/procurement of the required asphalt testing ‘equipment, this Bureau hereby issues a special permit authorizing your company to supply bituminous hot mix to various DPWH infrastructure projects for a period of one (1) year effective March 12, 2020 to March 11, 2021. Moreover, as part of the monitoring (spot checking) activity of the Department as indicated in said Department Order under tem 3, Authorities and Responsibllties of the RS and Item 13, ‘Assessment by the BRS, an unannounced annual visit will be conducted to determine the continuous compliance of your batching plant. Please be reminded that fellure to maintain the requirements under Item 9, Terms and Conditions of the Certificate of the said D.0. may result to the cancellation or revocation of your permit issued by this Bureau. Very truly yours, al ln Bureau of Research and Standards 14.1.3 ica/esuNBORGT

You might also like