Professional Documents
Culture Documents
Solve the following question with all four models of transportation i.e. NWCM,
LCM, Stepping Stone and VAM. (1.5 marks x 4 models = 6 marks)
For e.g. If your roll number is 1 then consider it as 001, if your roll number is 10
then consider it as 010.
B C
A Supply
Roll Roll Roll
No. No. No.
1 3rd 2nd 1st 400
Digit Digit Digit
1050
Demand 400 350 300
Question No. 2: 1.5 marks
(Do this question when I teach you RAM later in class after summer break)
The ABC Water Company has plant in two cities; the plant can supply the
following numbers of million liters of water to the company’s distributors each
month.
Plant Monthly Supply (mil
ltr)
A. Sheikhupura 3,500
B. Nooriabad 5,000
TOTAL 8,500
The distributors, who are spread throughout six cities, have the following total
monthly demand.
Distributor Monthly Demand (mil
ltr)
1. Karachi 1800
2. Lahore 1600
3. Peshawar 1500
4. Islamabad 1400
5. Quetta 1250
6. Gilgit 950
TOTAL 8500
The company must pay for the following shipping costs per mil ltr.
To
From 1 2 3 4 5 6
A $0.50 0.35 0.60 0.45 0.80 0.75
B 0.20 0.4 0.65 0.55 0.25 0.65