You are on page 1of 11

DHARTI ENVIRONMENT SOLUTIONS

____________________________________________________________________________________________________

Sewage Treatment Plant (STP) – Capacity 75 KLD


Ref: Dharti/Delhi/2019-20
Date: 06th March, 2020
Anil Kumar Arya
New Delhi

Kind Attention: Mr. Anil Kumar Arya

Subject: Techno Commercial offer for 75 KLD MBBR Sewage treatment plant
Dear Sir,

We acknowledge with thanks receipt of your valued enquiry for Sewage Treatment Plant having
capacity 75 KLD. As desired, please find enclosed our techno-commercial offer for required
STP for your kind perusal.

We hope you will find the same in line with your requirement and will favor us with your valued
order.

For further queries/clarifications, please feel free to contact/write us.

Thanking you

Yours truly,

For Dharti Environment Solutions

Sushant Kumar
Mob: +91 7982362684
ANNEXURE–I

DESIGN BASIS& PERFORMANCE CRITERIA

Introduction

The proposed Sewage Treatment Plant (STP) is of capacity 75 KLD. The Sewage Treatment Plant will be
made up of Civil/M.S. Modular structure. The Sewage will be collected in the Sewage collection tank.
From the collection tank, the sewage will be pumped to STP and Tertiary Treatment Plant and then it will
be discharged / reused in horticulture.

Details Of Plant Design

 Flow rate - 75 K.L. per day

Design Parameters

The Sewage Treatment Plant is designed on the following general characteristics:

Parameters Final Treated Quality Unit


Sl Inlet Quality

1. Flow Rate 75 75 m3/day

2. pH 6.5-8.0 6-9 -

3. Chemical Oxygen Demand 350-500 Less than 50 mg/ltr

Bio-chemical Oxygen
4. 250-350 Less than 10 mg/ltr
Demand

5. Total Suspended Solids 100-250 Less than 10 mg/ltr

6. Oil and grease <50 <10 mg/ltr


ANNEXURE-II
TREATMENT SCHEME

Treatment Scheme For Proposed STP

 Screening of raw sewage + O&G removal with Baffled Oil Trap.


 Collection cum equalization of raw sewage using diffused aeration.
 Aeration Tank consisting of MBBR media.
 Biological treatment will be done by using Aeration process for growth of bacteria
by Course/bubble air diffusion system.
 Clarifier (Tube Settler) consisting of Tube deck media for maintain the required
population of bacteria by sludge circulation.
 Chlorination for the dis-infection of biologically treated effluent of Clarifier.
 Tertiary Treatment / Polishing system by consisting of Sand and Carbon Media Filter.

ANNEXURE-III
DESCRIPTION OF TREATMENT PROCESS

 The raw sewage from its various source of generation shall be collected in Collection
cum Equalization Tank (EQT) through Screen chamber and O&G chamber.
 From Equalization tank/Collection Tank, the raw sewage will be pumped to Aeration Tank.
 In Aeration Tank, aerobic conditions will be maintained by fine bubble air/Course diffusion.
The raw effluent shall come in contact with MBBR Media, biomass; the impurities
(BOD/COD) present in the effluent shall be biologically oxidized.
 Water from Aeration tank will be overflowed to Tube Settler Clarifier tank.
 clear supernatant water shall be overflowed to Chlorine Contact tank.
 The solid settled at the bottom of tube settler shall be circulated to Aeration tank to
maintain the required population of Bacteria. Sludge will be pumped to Filter press or
sludge drying bed.
 Chlorination shall be done by dosing Sodium Hypo-chlorite solution for the dis-infection of
biologically treated effluent. The dis-infected treated effluent shall be passed through Media
Filter Consisting of Sand Media and Carbon for removal of residual suspended particles,
COD/BOD etc. After the filtration, the treated water will be discharged in drain/sewer/use
in horticulture and flushing.
ANNEXURE-IV
LINE DIAGRAM OF STP SYSTEM (TENTATIVE)
ANNEXURE-V
SCOPE OF SUPPLY
Sl.No Description Specification
Raw Sewage Pump data
1 Quantity 2 No (1W+1S)
2 Type Submersible Nonclog
3 Seal Gland Packing
4 Motor rating 1.5 HP
5 Phase 3 phase
6 MOC CI
7 Make Kirloskar / eq.

S.No Description Specification


Bar Screen data
1 Quantity 1 No
2 Opening size 15 mm
3 Size of Flat 25 x 5mm.
4 Width 800 mm
5 Height 1000 mm
6 MOC MS – Epoxy
7 Make Dharti/eq.

S.No Description Specification


Air Blower Data
1 Quantity 2 No (1W + 1S)
2 Type Twin Lobe Rotary
3 Capacity 100 cum/hr
4 Pressure 0.5 kg/cm2
5 MOC CI
6 Make Kay / eq.
Motor Data
7 Quantity 2 No (1W + 1S)
8 Type TEFC Squirrel Cage Induction
9 MOC CI
10 Motor Rating 5 HP
11 Power Supply 3 Phase
12 Make KBL / eq.

S.No Description Specification


Coarse Bubble Diffuser Data
1 Quantity 2 No
2 Type Tubular Coarse bubble
3 Diameter 90 mm Dia
4 Length 1000 mm
5 MOC EPDM
6 Location Collection tank
7 Make Dharti/eq.
Fine Bubble Diffuser Data
8 Quantity 8 No
9 Type Tubular Fine bubble
10 Diameter 63 mm Dia
11 Length 1000 mm
12 MOC EPDM
13 Location Aeration tank
14 Make Dharti/Eq.
Media Data
1 Quantity 1 Lot
2 Type Tube Settler Media
3 Surface area 250 m2 / m3
4 MOC PVC
5 Location Tube Settler tank
6 Make Dharti/eq.
Return Sludge Pump data
1 Quantity 2 No (1W + 1S)
2 Type Centrifugal Nonclog
3 MOC CI
4 Make KBL / eq.
Motor data
5 Motor type TEFC Squirrel Cage Induction
6 Motor rating 1 HP
7 MOC CI
8 Make KBL / eq.
Sl.No Description Specification
Screw Pump data
1 Quantity 1 No
2 Type Single Screw Single Stage
3 MOC of Rotor SS 304
4 MOC of Stator EPDM
5 Make Heliflow / eq.
Motor data
6 Motor type TEFC Squirrel cage induction type
7 Motor rating 0.5 HP
8 MOC CI
9 Make KBL / eq.

S.No Description Specification


Filter Press Unit data
1 Quantity 1 No
2 Type Manual Hydraulic
3 MOC of Structure MS
4 MOC of Plates PP
5 Make Swarna Sankara / Isha / eq.

Sl.No Description Specification


Dosing Pump data
1 Quantity 1 No
2 Type Electronic metering type
3 Capacity 0 – 6 lph
4 Pressure 2 ksc
5 MOC PP
6 Rating 60 W
7 Make Prominent/Edose / eq.
Tank data
8 Quantity 1 No
9 Type Cylindrical vertical
10 Capacity 100 ltrs
11 MOC HDPE
12 Make Sintex / eq.

Sl.No Description Specification


Filter Feed Pump data
1 Quantity 2 No (1W +1S)
2 Type Centrifugal Monobloc
3 Capacity 5 cum/hr
4 Head 15 m
5 MOC CI
6 Make Kirloskar / eq.
Motor data
7 Type TEFC Squirrel Cage Induction type
8 Motor rating 1 HP
9 Phase 3 phase
10 MOC CI
11 Make Kirloskar / eq.

S.No Description Specification


Filter Media Vessel data
1 Quantity 2 no
2 Type Vertical pressure vessel
3 MOC FRP
4 Working pressure 2.5 kg/cm2
5 Design Pressure 3.2 Kg/cm2
6 Test Pressure 5 Kg/cm2
7 Make Pentair/eq.
Frontal Piping data
8 Accessories Flanges, Elbow, Tee
9 MOC uPVC
10 Type of Valves Butterfly Valves
11 Make of Pipes Astral / eq.
12 Make of Valves Intervalve / eq.
Media Details
13 Sand 1 Lot
14 Carbon 1 Lot
Control Panel Details
1 Control Panel 1 no

ANNEXURE-VI
SCOPE OF WORK FOR SEWAGE TREATMENT PLANT AND EXCLUSIONS
Our Scope Of Work
 Supply, installation and aligning of all electrical and mechanical equipment as per scope
of Supply.
 Supply and installation of interconnecting pipes, valves etc. (within battery limit of plants)
 Alignment of all components
 Commissioning and final testing of STP
 Operation & Maintenance manual for STP

Schedule Of Exclusions
(Client Scope)
 Piping up to collection tank & From STP to discharge in drain/sewer/Horticulture
 All chemicals for dosing during operation of plant trial run.
 Arrangement of Loading/Unloading of material at site and local conveyance.
 Approach to site & storage for equipment during the erection work.
 Piping and pumping beyond the Dual Media Filter outlet and before bar screen chamber
 Continuous electric incoming supply with earthing to STP panel.
 Power / Lighting / Water at the site of work on 24 hrs. basis during the erection work.
 Lighting & ventilation in STP area.
 Arrangement of excess Sludge disposal
 Laboratory or plant room if required.
 NOC from pollution control board at all levels and all other statutory clearance and
sanctions required for the implementation of the project.
 All civil & structural works including waterproofing, plaster, snowcem, structure duly tested for
leak proofing, plant room flooring etc and related MS/CI works such as supply and fixing of
Puddle Flanges, Inserts, handrails, Manholes, Drain Channel Gratings, grills, Doors, vents,
footrests, lighting & Ventilation etc.
 Lubricants, Oils and Grease.
 Sufficient quantity of Sewage water to the system
 Any other services/supply not clearly mentioned in our scope of supply.

ANNEXURE-VII
PRICE, COMMERCIAL TERMS & CONDITIONS
A. Option-1: Electro-Mechanical (For Civil Based Plant):

Rs. 13,25,000/- (Rupees Thirteen Lac Twenty Five Thousand Only) for supply of Electromechanical
Part of civil Based Sewage treatment plant having capacity of 75 KLD As Per details mentioned in the
enclosed Annexures of the offer excluding Civil Work. Civil Will be in Client scope.
B. Option-2: Packaged/Prefabricated 75 KLD STP (MS FRP):

Rs. 19,75,000/- (Rupees Nineteen Lac Seventy Five Thousand Only) for MS Fabricated Packaged 75 KLD STP
as per details mentioned in the enclosed Annexures of the offer.

C. Commissioning Charges:
Rs. 1,50,000/- (Rupees One Lac Fifty Thousand Only) which includes Installation Commissioning and
Testing of STP. You will provide boarding/lodging, local conveyance, unskilled labour, loading/unloading
/store room facility to our team.
D. Engineering Drawings Charges:
Rs. 75,000/- (Rupees Seventy Five Thousand Only) for Engineering Drawings.

E. Advance Tertiary Treatment (Optional):


Rs. 3,50,000/- (Rupees Three Lacs Seventy Five Thousand Only) for Advance Tertiary System for better
performance for achieving CPCB Norms.
Terms & Conditions

1. RATES The above rates are F.O.B. Ghaziabad. Packing extra @2%.
2. FREIGHT Extra as actual in purchaser’s account.
3. TAXES GST@18 % extra
4. INSURANCE Extra @0.5% on total bill value.
5. DELIVERY Within 15 Weeks after receipt of technically and commercial clear
order along with Advance payment.
6. PAYMENT 20% advance along with order,
20 % after submission of Drawing
50 % against Performa invoice prior to dispatch the plant
10 % within 15 days of receipt of material at site or immediately after
successful commissioning.
7. GUARANTEE 12 Calendar months from the date of supply of materials against any
manufacturing defect.
8. VALIDITY 30 (thirty) days
9. FORCE Applicable on occurrence of following events but not limited to:
MAJEURE a) Acts of God- floods, drought, earthquake, extreme weather
CLAUSE conditions, spread of epidemic etc.
b) Acts/Ordinance of Government regarding supply and/or regulation of
power, shortage, supply of mandatory raw material etc.
c) Situations beyond control- accidents, destructions due to fire,
sabotage, explosion, lockouts, strike, slow-down, major breakdown at
our facility.

Authorized Signatory