Progressive Enviro Care Pvt. Ltd.


Do the Best with the Waste

October 18, 2023

To,
M/s Vinayak Green ,
Rangwasa , Rau,
Indore

Kind Attend: -Mr. Gaurav Tarenekar

Subject : - Quotation of Sewage Treatment Plant for your Premises.

Dear Sir,
We Thank you very much for opportunity provide to us for submitting offer for the supply
Erection and Commissioning of Sewage Treatment Plant for (Capacity 50 Cubic meter
/day)for your Premises.

Our supplied Plant should be capable for treatment of waste water which Generate from
your Premises.

Total Quantity of treated water will be reused in Toilet flashing and Garden.
Please find bellow our techno commercial Proposal giving all technical details of the plant
along with process flow sheet.

If you require and any clarification and or information on our proposal please feel very free
to contact us.

Thanking you with best regards,

Yours faithfully

For Progressive Enviro Care Pvt. Ltd.


The offer is work out considering the following characteristics Waste water and
treated Waste water
1. Inlet Parameter considered for Waste Water
SR,NO PARAMETER VALUE / Mg / Lt
01 Flow 50 Cum / Day
02 PH 7 .0 – 80
03 Suspended Solids 250 mg /1
04 BOD 300 mg / 1
05 COD 500 mg/1
06 Oil & Grease 50 mg / 1

2.With the treatment scheme quoted /proposed herewith, the outlet parameter are : -
SR,NO PARAMETER VALUE / Mg / Lt
01 Flow 50 Cum / Day
02 PH 7.0 – 8.0
03 Suspended Solids Less Then 100 mg / l
04 BOD Less Then 30 mg /l
05 COD Less Then 250 mg / l
06 Oil & Grease Less Then 5 mg / l
3.PROCESS DESCRIPTION OF STP PLANT

1. Screening
The sewage from the source enter by gravity into screening chamber where a manual fine screen
entraps the screening which may be present along with the sewage there by ensuring smooth
running of the pumps in the letter stages. Screening are removed by manual raking.

2. Oil and Grease Trap


Sewage from screen chamber enters an oil and grease trap where the floating oil and grease will
be trapped and is manually scooped
3. Equalization
Sewage free of screening, oil and grease enter by gravity into equalization tank where fluctuation
in the flow along with organic lode, ph, temperature etc is equalized.
4. Biological Treatment Process
Biological Reactor : The biological reactor works on the principal of extended aeration. Air
blower will be used for provide necessary oxygen to the bacteria’s to degrade the organic matter
which is present in the raw sewage.
5. Secondary Sedimentation
The mixed liquid from biological reactor enters into secondary sedimentation tank. The activated
sludge (bio sludge) from biological reactor will be separated from effluent via sedimentation in
sedimentation tank and again pump backed to the biological reactor to maintain the desired level
of MLSS concentration. The excess sludge from sedimentation tank will be transferred to the
sludge drying beds whereas the overflow is taken for tertiary treatment.
6. Tertiary Treatment Process

The above treated sewage is stored in a feed sump i.e. intermediate storage tank and send for
further treatment in the pressure sand filter.
7. Pressure and Filter
The treated water stored in the intermediate storage tank i.e. sump is pumped using filter feed
pump to pressure sand filter. The filter installed here will ensure the trapping of fine suspended
solids. For the cleaning purpose back washing operation can be done by same feed pump.
8. Activated Carbon Filter
The water from pressure sand filter enters into activated carbon filter unit. Here color, odor and
majority of balance COD is removed. For the cleaning purpose back washing operation can be
done by filter feed pump
4.Civil facilities required for STP to be constructed by Client
S.NO PARTICULARS DIMENSION QUANTY TOTAL AREA
IN NOS IN CUB METER

01 Screen Chamber 1.0 M x 1.0 M x 1.5 M 01 RCC


02 Oil & Grease trap 2.0M x 1.0 M x 1.5 M 01 RCC
03 Collection Tank 3.0M x 2.5M x 3.0M 01 RCC
04 Aeration Tank 3.0M x2.5M x 3.0M 01 RCC
05 Secondary Settling tank 2.0 M x2.0M x 3.0M 01 RCC
06 Feed Sump 1.0 M x1.0M x 3.0M 01 RCC
Sludge Drying Beds 1.0 M x1.0M x 1.0M 02 Brick
Total Area in Cub Meter

5. List of Equipment and accessory for STP plant.


SR.NO. PARTICULARS QUANTITY DRIVE HP
01 Sewage Transfer Pump 01 No 1.0 HP x 2900RPM
02 Air Blower 01 No 3.0 Hp x 1440 RPM
03 Aeration Grid for Aeration 01 Lot EPDM
04 Feed Well Unit For SST 01N0 MS FRP
05 Return Bio Sludge Pump 01 No 0.5 HP x 2900 RPM
06 Filter Feed Pump 01N0 2.0Hp x 2900 RPM
07 Pressure Sand Filter 01 No FRP Vassals
08 Activated Carbon Filter 01No. FRP Vassals
09 Chlorine Dosing Tank 01 No. SYNTEX
10 Chlorine Dosing Pump 01 No. Edose
11 Process Pipe Line and Fitting 01 Lot UPVC
12 Process & Valve 01 Lot UPVC
13 Flow Meter 01 No. 1.5 “
14 Control Panel 01 No.
06. Technical Specification of Machinery

01. SEWAGE TRANSFER PUMP


01 Quantity Required 01 No
02 Drive 1.0 HP x 2900 RPM
03 Make Kirloskar/ Darling
04 Model Nano Modle

02. AIR BLOWER


01 Quantity Required 01 No
02 Capacity 100 Cubic Meter Air Per Hour @ 0.40 Kg / SQCM
03 Make Shanti / Airvak or equivalent
04 Type Twin Lobe Air Blower

03. AERATION GRID FOR AERATION TANK


01 Quantity Required 01 Lot
02 Capacity air/hour@0.7kg SQCM Air Diffuser
03 Make EPDM

04. FEED Well Unit For SECONDARY SETTLING TANK


01 Quantity Required 01
02 Make MS FRP
04 Make Progressive

05. FILTER FEED PUMP


01 Quantity Required 01 Nos
02 Make Kirlosker
03 Drive 2.0 HP x 2900 RPM
04 Model Monoblock KDS

06. PRESSURE SAND FILTER


01 Quantity Required 01 No
02 M O C FRP Vassals with Inlet Outlet, Nozzle ,Main hole &
Frontal Pipeline with fitting pressure gauge and Filter
media.
03 Design Down Flow Design
04 Size Dia. 0.5 x 1.0 M
07 ACTIVATED CARBON FILTER
01 Quantity Required 01 No
02 M O C FRP Vassals with Inlet Outlet, Nozzle ,Main hole &
Frontal Pipeline with fitting pressure gauge and Filter
media.
03 Design Down Flow Design
04 Size Dia. 0.5 x 1.0 M

10. CHLORINE DOSING TANK


01 Quantity Required 01 No
02 M O C Syntax
03 Size 50 Lit

11. CHLORINE DOSING PUMP


01 Quantity Required 01 No
02 M O C Edose
03 Capacity 0-4 LPH

12. PROCESS PIPE LINE & FITTINGS


01 Quantity Required 01 Lot
02 M O C UPVC
03 Size As per requirement

13. PROCESS AND ALLIED VALVE


01 Quantity Required 01 Lot
02 M O C UPVC
03 Size As per requirement
07. COST

Our charges for the execution of defined scope of work which falls in our consideration shall
be as are given here under.

SR.NO. PARTICULARS AMOUNT


01 Supply, Installation and Commissioning work of STP 6,25,000 /-

08. TARIFF BASIS:

Packing & forwarding & insurance Inclusive


charges
GST 18% Exclusive
Freight charges Exclusive
Installation & Commissioning Charges Inclusive
Supervision Charges Service provided by M/s Progressive Enviro Care
Pvt. Ltd. Under the said payment are:
● Inspection of installation of our entire
Sewage Treatment Plant by our technical person for
approx.….7-8 days,
● Inspection includes guidance & verification
of unloading of MS fabricated tanks.
● Connection of your Sewage pipe outlet to
out STP inlet.
● Connection of Blowers & pumps with
control panel.
● Making pipeline arrangement for sewage
treatment system.
● Supervision installation of STP.
● Demonstration of working system through
trial run with sewage / Fresh water.
Payment Terms 50% + GST Advance along with PO
40% + GST Against proforma invoice prior
dispatch.
10%+ GST After successfully installation.
Delivery Within 4-5 Weeks from the date of receipt of PO
along with advance.
Warranty As mentioned in section 12
Validity The above made offer is valid for 30days from the
date of praposal
09. OUR SCOPE OF WORK:
01. Design Drawing and Supervision of civil work as per engineering norms.
02. Supply of all requisite equipment & Accessory as per work order.
03. Erection & Commissioning of STP Plant

10. SCOPE OF CLIENT:


01. The Civil work STP Facilities should be carried out by you as per Engineering Norms (As per
our detail Design & Drawing of civil scope).
02. Unloading of complete STP equipment from loading truck.
03. Supply Electricity to STP control panel
04. Raw water supply for STP commissioning work.
05. Arrangement of treated water supply from STP.
06. Maintenance of blower including oiling & greasing after commissioning.
07. Construction foundation of all machines.
08. Storage space & site security for material of STP.

11. WARRANTY:

● The equipment supplied is guaranteed for…


o
A period of 12 month from the date of commissioning.
o
18 months from the date of supply, whichever is the earlier of the two events?