Professional Documents
Culture Documents
DRILLING MACHINES
RC # 06700, 06701
Complete Overhaul / maintenance of frictional
5 parts , proper cleaning and lubrication of all parts
,To check feed mechanism ,drive belts and other
gear mechanisms…etc.
5 DRILLING MACHINES
RC # 06548, 06559, 06702 and 06703
Complete Overhaul / maintenance of frictional
parts , proper cleaning and lubrication of all parts
,To check feed mechanism ,drive belts and other
gear mechanisms…etc.
BAND SAWS
RC # 06666, 06669
6 Complete overhaul of band saws and their
components etc.
10 GTAW UNIT CEBORA AC/DC TIG STAR-200 -On Quarterly bases Cleaning of
RC # 0270878 machines, checking of power cable and
Complete Overhaul / maintenance of High connections is required.
frequency unit, inter connection parts , main
power unit, electronic circuit , supply cable and
TIG torch / other mechanisms…etc
CEBORA AIR PLASMA PROF-122
RC # 0249778
Complete Overhaul / maintenance of main power -On Quarterly bases Cleaning of
11 unit, electronic circuit , supply cable, Plasma machines, checking of power cable and
torch nozzle and other parts / mechanisms…etc connections is required.
Note : The faculty member who are involved in welding training courses are requested to give their feed back for specific
maintenance of machines in both the welding labs.
Note: Use separate page or add your comments/ complaints in the table above.
Shabbir Hussain
Instructor welding