Professional Documents
Culture Documents
Step 2: Tilted Horzontal Angles are welded within the Louver Box Inside Walls. At a pitch of 100 mm
Step 3: The attenuators of 100 mm thicknes are inserted in the channel slot within the Louver Box.
Step 4: The Louver element locked by welding angle on the external border of the louver Box.
MS Sheet
Step 1: Suitable Size MS steel Frames are made fixed on One End of Hot Air Louvers
Step 2: Rain Protection Elements are revetted on these frames