Fresh Air & Hot Air Attenuators

Sheet on the Louver BOX.

Fresh Air Attenuators Elements

Procedure of Isntallation of Fresh & HOT Air Attenuators


Step 1: Suitable Size Louver Box is made with Steel Channels.and anchored to wall and ground. Steel Frame Work to House Attenuators-Louver Box.

Step 2: Tilted Horzontal Angles are welded within the Louver Box Inside Walls. At a pitch of 100 mm

Step 3: The attenuators of 100 mm thicknes are inserted in the channel slot within the Louver Box.

Step 4: The Louver element locked by welding angle on the external border of the louver Box.

Step 5: MS Sheet is reveted on the outer side of the BOX.


Hot Air Ducting for Radiator

Steel Frame Work

MS Sheet

Inter Connecting Canvas

Procedure Hot air Inter connection with Radiator


Step 1: Suitable Size MS steel Frames are made with the requisite opening for Radiator

Step 2: MS sheet is revetted on the steel frame.

Step 3: Radiator and the framework is connected by way of Canvas


Hot Air Rain Protection Louvers

Single Leaf Acoustic Hinged Doors

Rain Protection Louvers

Procedure for rain Protection Louvers Installation Steel Frame Work

Step 1: Suitable Size MS steel Frames are made fixed on One End of Hot Air Louvers
Step 2: Rain Protection Elements are revetted on these frames