i02377881

Torque Converter Lockup Clutch Pilot Pressure - Test and


Adjust
SMCS - 3124-036-VC

Table 1

Required Tools
Part Number Part Description Qty
1J-9671 O-Ring Seal 1

3J-1907 O-Ring Seal 2


5P-1318 Adapter 1

6V-3079 Hose As 2
6V-3965 Fitting As 2

6V-4143 Coupler 4
8T-0855 Pressure Gauge (0 to 4,000-kPa (0 to 580-psi)) 1

Note: Make sure that the filters and the screens are clean before you test any pressures. Make sure
that the oil is at operating temperature before you perform this test.

Personal injury or death can result from sudden machine movement.

Sudden movement of the machine or the release of oil under pressure


can cause injury to persons on or near the machine. To prevent possible
injury before testing and adjusting the power train system, perform the
procedure in the Testing and Adjusting, Troubleshooting, "General
Information" section.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 19/06/2008
R1600G LOAD HAUL DUMP 9YZ00001-UP (MACHINE)(SEBP5171 - 00) - Estr... Página 2 de 3

This test will show if the pressure reduction valve is correctly set and if the synchronizing valve is
receiving pilot pressure.

Procedure 1

Illustration 1 g01082637
Pressure reduction valve

(1) Shims

(2) Pressure reduction valve

Illustration 2 g01186808
Torque converter lockup clutch and solenoid valve

(B) Pressure tap for the lockup clutch pilot oil

1. Remove the plug at pressure tap (B). Install a test nipple at the location of the removed plug.

2. Use a coupler and a hose to connect a 8T-0855 Pressure Gauge (0 to 4,000-kPa (0 to 580-psi))
to the nipple.

3. With the parking brake engaged, start and run the engine at low idle rpm with the transmission

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 19/06/2008
R1600G LOAD HAUL DUMP 9YZ00001-UP (MACHINE)(SEBP5171 - 00) - Estr... Página 3 de 3

in NEUTRAL. The pressure on the gauge should be 1725 ± 100 kPa (250 ± 15 psi).

4. Stop the engine. After the pressure is correctly set, remove the test equipment.

Table 2

Chart of Shims for the Pressure Reduction Valve (1)


Part No. for the Thickness of the Change in Pilot Pressure as a Result of One
Shims Shims Shim

5J-2721 Shim 0.13 mm (0.005 inch)


10 kPa (1.4 psi)

6J-3993 Shim 0.25 mm (0.010 inch)


19 kPa (2.8 psi)

5J-1036 Shim 0.80 mm (0.031 inch)


60 kPa (8.7 psi)

(1) Before an adjustment is made, be certain that the valve spring is not weak or broken.

Problem: The oil pressure is too low.

Probable Cause:

z Pressure reduction valve (2) is sticking.

z Pressure reduction valve (2) is incorrectly set. Add shims (1). Refer to Table 2.

Problem: The oil pressure is too high.

Probable Cause:

z Pressure reduction valve (2) is sticking.

z Pressure reduction valve (2) is incorrectly set. Remove shims (1). Refer to Table 2.

Copyright 1993 - 2008 Caterpillar Inc. Thu Jun 19 21:44:21 EST 2008
Todos los derechos reservados.
Red privada para licenciados del SIS.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 19/06/2008

You might also like