Vertical Vertical DL LL UPLIFT

Node L/C Fy kN Fy kip KIP KIP KIP


2 1 EQX+ 0 0 3.85 2.77 2.7
2 EQX- 0 0* * *
3 EQZ+ -0.253 -0.06 * * *
4 EQZ- 0.253 0.06 * * *
5 WX+ -12.037 -2.7 * * *
6 WX- -12.037 -2.7 * * *
7 WZ+ -6.858 -1.54 * * *
8 WZ- -5.54 -1.24 * * *
9 DL 17.191 3.85 * * *
10 RL 12.362 2.77 * * *
101 1.4DL 24.067 5.39 * * *
102 1.2DL+ 26.81 6.01 * * *
103 1.2DL+ 40.407 9.05 * * *
104 1.2DL+ 30.778 6.89 * * *
105 1.2DL+ 30.778 6.89 * * *
106 1.2DL+ 34.921 7.82 * * *
107 1.2DL+ 35.976 8.06 * * *
108 1.2DL+ 11.162 2.5 * * *
109 1.2DL+ 11.162 2.5 * * *
110 1.2DL+ 17.895 4.01 * * *
111 1.2DL+ 19.608 4.39 * * *
112 1.2DL+ 26.809 6.01 * * *
113 1.2DL+ 26.81 6.01 * * *
114 1.2DL+ 26.43 5.92 * * *
115 1.2DL+ 27.189 6.09 * * *
116 0.9DL+ -0.176 -0.04 * * *
117 0.9DL+ -0.176 -0.04 * * *
118 0.9DL+ 6.557 1.47 * * *
119 0.9DL+ 8.27 1.85 * * *
120 0.9DL+ 15.471 3.47 * * *
121 0.9DL+ 15.472 3.47 * * *
122 0.9DL+ 15.092 3.38 * * *
123 0.9DL+ 15.851 3.55 * * *
29 1 EQX+ 0 0 4.68 5.53 5.78
2 EQX- 0 0* * *
3 EQZ+ 0.001 0* * *
4 EQZ- -0.001 0* * *
5 WX+ -25.823 -5.78 * * *
6 WX- -25.823 -5.78 * * *
7 WZ+ -11.793 -2.64 * * *
8 WZ- -11.796 -2.64 * * *
9 DL 20.902 4.68 * * *
10 RL 24.669 5.53 * * *
101 1.4DL 29.263 6.55 * * *
102 1.2DL+ 37.417 8.38 * * *
103 1.2DL+ 64.552 14.46 * * *
104 1.2DL+ 43.894 9.83 * * *
105 1.2DL+ 43.894 9.83 * * *
106 1.2DL+ 55.118 12.35 * * *
107 1.2DL+ 55.116 12.35 * * *
108 1.2DL+ 3.847 0.86 * * *
109 1.2DL+ 3.847 0.86 * * *
110 1.2DL+ 22.086 4.95 * * *
111 1.2DL+ 22.082 4.95 * * *
112 1.2DL+ 37.417 8.38 * * *
113 1.2DL+ 37.416 8.38 * * *
114 1.2DL+ 37.418 8.38 * * *
115 1.2DL+ 37.416 8.38 * * *
116 0.9DL+ -14.758 -3.31 * * *
117 0.9DL+ -14.758 -3.31 * * *
118 0.9DL+ 3.481 0.78 * * *
119 0.9DL+ 3.477 0.78 * * *
120 0.9DL+ 18.812 4.21 * * *
121 0.9DL+ 18.811 4.21 * * *
122 0.9DL+ 18.813 4.21 * * *
123 0.9DL+ 18.811 4.21 * * *
51 1 EQX+ 0 0 3.85 2.77 2.7
2 EQX- 0 0* * *
3 EQZ+ 0.252 0.06 * * *
4 EQZ- -0.252 -0.06 * * *
5 WX+ -12.037 -2.7 * * *
6 WX- -12.037 -2.7 * * *
7 WZ+ -5.541 -1.24 * * *
8 WZ- -6.856 -1.54 * * *
9 DL 17.191 3.85 * * *
10 RL 12.362 2.77 * * *
101 1.4DL 24.067 5.39 * * *
102 1.2DL+ 26.81 6.01 * * *
103 1.2DL+ 40.407 9.05 * * *
104 1.2DL+ 30.778 6.89 * * *
105 1.2DL+ 30.778 6.89 * * *
106 1.2DL+ 35.975 8.06 * * *
107 1.2DL+ 34.922 7.82 * * *
108 1.2DL+ 11.162 2.5 * * *
109 1.2DL+ 11.162 2.5 * * *
110 1.2DL+ 19.606 4.39 * * *
111 1.2DL+ 17.896 4.01 * * *
112 1.2DL+ 26.809 6.01 * * *
113 1.2DL+ 26.81 6.01 * * *
114 1.2DL+ 27.188 6.09 * * *
115 1.2DL+ 26.431 5.92 * * *
116 0.9DL+ -0.176 -0.04 * * *
117 0.9DL+ -0.176 -0.04 * * *
118 0.9DL+ 8.268 1.85 * * *
119 0.9DL+ 6.558 1.47 * * *
120 0.9DL+ 15.471 3.47 * * *
121 0.9DL+ 15.472 3.47 * * *
122 0.9DL+ 15.85 3.55 * * *
123 0.9DL+ 15.093 3.38 * * *
Tensile strength of bar fy = 60000 Psi
Concrete compressive strength = 2045 Psi
Ultimate
Ultimate Bearing capacity = 1.3 Ksf (Allowable bearing capacity of soil
Df = 4 ft F.S =3.0

Total
Column Dead Load Live Load Combination Footing
Node ID Grid ID UPLIFT (KIP) Gravity
Id (Kip) (Kip) max load
Load (Kip)
Load (Kip)

2 A1 C-01 3.85 2.77 2.70 9.05 6.62 7.15


29 A2 C-01 4.68 5.53 5.78 14.46 10.21 11.03
51 A3 C-01 3.85 2.77 2.70 9.05 6.62 7.15
bearing capacity of soil at 5'-0" depth .45 TSF) Bore Hole ID -BH -5

FOOTING ID
Effective
Width
Footing Footing Depth of Length of load per Punching
a b bo of qu, ksf
Load (Kip) Area (sft) Footing footing rft (k/ft) area (sft)
footing
inch

4.63 5.50 6 10 10 64 F1 3 3 1.01 3.02 1.78


4.63 8.48 6 10 10 64 F2 3 3 1.61 4.82 1.78
4.63 5.50 6 10 10 64 F2 3 3 1.01 3.02 1.78
Concrete
Punching concrete Punching Beam Applied
shear Shear Uplift
shear shear Shear Mu (kip-ft) shear load on Final Footing Size (ft)
strength status Status
(kips) capacity status (kips) Footing
capacity

7.26 52.10 OK 1.77 1.76 14.65 OK 4.63 OK 3


11.61 52.10 OK 2.83 2.81 14.65 OK 4.63 OK 3
7.26 52.10 OK 1.77 1.76 14.65 OK 4.63 OK 3
As (min) 1 As (min) 2 bar No-of-
Final Footing Size (ft) Assume a As Check a Select As Decision
in² in ² dia bar

3 1 0.17 0.07 0.02 0.49 0.72 0.72 12 3.00 12 mm dia bar


3 1 1.17 0.12 0.03 0.49 0.72 0.72 13 ### 13 mm dia bar
3 1 2.17 0.08 0.02 0.49 0.72 0.72 14 ### 14 mm dia bar
Area of
Column
Decision Steel in
Capacity
column

@ 11 in C/C 3.1 173


@ ### in C/C 4.1 201
@ ### in C/C 5.1 230
Project Name: Cosmopolitan Industries (Pvt) Limited.

Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka,


Bangladesh
Ultimate Bearing Capacity 8.64 Ksf F.S=3.0

GRID ID DL+LL Q(ult) F.S AREA (req) AREA (pro) F.S REMARKS
A1 6.62 8.64 3 0.77 9 11.75 OK
A2 10.21 8.64 3 1.18 9 7.62 OK
A3 6.62 8.64 3 0.77 9 11.75 OK

Calculation for Bearing Capacity of Soil

Allowable Bearing Capacity 12 t/sqm at a depth of Df=1.0 m

Allowable Bearing Capacity 19 t/sqm at a depth of Df=2.0 m

So the allowable bearing capacity,Q(all) = (12+1 at a depth of Df=1.50 m


= 15.50 t/sqm
= 1.44 tsf
=

Factor of Safety ,F.S = 3.0

So the ultimate bearing capacity,Q(ult) = Q(all)*F.S


=2.88*3
=8.64 Ksf
Project Name: Cosmopolitan Industries (Pvt) Limited.

Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

Punching Shear :𝑃𝑢


- −𝑞𝑢∗((𝑎+𝑑)∗(𝑏+𝑑))

Concrete punching capacity :- 4∗Φ∗√(𝑓^′ 𝑐 )*b₀d

PUNCHING CONCRETE
GRID ID COLUMN ID FOOTING ID STATUS
SHEAR CAPACITY
A1 C-01 F1 7.26 52.10 0.1394
A2 C-01 F2 11.61 52.10 0.2228
A3 C-01 F2 7.26 52.10 0.1394
Project Name: Cosmopolitan Industries (Pvt) Limited.

Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka,


Bangladesh
GRID ID FOOTING ID DIMENSION (FT) AREA (PRO) AREA (REQ,) STATUS
A1 F1 3 3 9 5.50 0.611
A2 F2 3 3 9 8.48 0.942
A3 F2 3 3 9 5.50 0.611
Cosmopolitan Industries (Pvt) Limited.
Project Name:

Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

SELF TOTAL DOWN


GRID ID WIND LOAD DL STATUS
WEIGHT WAED LOAD

A1 2.70 3.85 4.63 8.48 OK


A2 5.78 4.68 4.63 9.31 OK
A3 2.70 3.85 4.63 8.48 OK
Cosmopolitan Industries (Pvt) Limited.
Project Name:

Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

SIZE APPLIED LOAD CAPACITY


COLUMN ID STATUS
A B KIPS KIPS
C-01 10 10 9.05 173 OK
C-01 10 10 14.46 201 OK
C-01 10 10 9.05 230 OK
Cosmopolitan Industries (Pvt) Limited.
Project Name:

Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

GRID ID COLUMN ID DL (KIPS) LL (KIPS) COMBINATION (KIPS).


A1 C-01 3.85 2.77 9.05
A2 C-01 4.68 5.53 14.46
A3 C-01 3.85 2.77 9.05
Cosmopolitan Industries (Pvt) Limited.
PROJECT NAME:

ADDRESS : Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

DATE : 25-04-2018

GRID ID APPLIED LOAD NO-OF PILE PER PILE CAPACITY TOTAL PILE CAPACITY STATUS
A1 2.70 2 112.8 225.6 OK
A2 5.78 2 112.8 225.6 OK
A3 2.70 2 112.8 225.6 OK
Pedestal Column Design
Project Name:
Cosmopolitan Industries (Pvt) Limited.
Date: 11/26/2019

Tensile strenth of Bar = 60 Ksi


Compressive Strength of Concrete = 3 Ksi
Reinforcement Ratio (ρg) = 1.20 %
Re-bar Size (mm) = 12 mm
a= 10 in
Designed Column Dimension
b= 10 in

Area of Steel (Ast ) = 0.2 in²


Min steel area 4 no #4 bar = 1.2 in²

Nominal Capacity Pn = 323.94 Kips


Ultimate Capacity Pu = 157.92 Kips
Footing Design F-21
Project Name:
Cosmopolitan Industries (Pvt) Limited.
Date: 11/26/2019
1 Strength of Re-bar = 60000 Psi
Strength of Concrete = 4000 Psi
1.1 Dead load = 40 Kip
Live load = 15
Load on the Footing P = 55
Bearing Capacity of Soil = 2 K/sf
Depth of Footing Df = 11.83 ft
Unit weight of soil = 120 Psf
Column length a = 14 in
Column width b = 18 in
Ulitimate load Pu = 59.4 Unfactored load
2 Requried Area = 29.70 sft OK
Footing Length (L) = 5.45 ft
Squre footing (L) = 7 ft Select
Squre footing (B ) = 7 ft Select

3 Upward Soil pressure qu = 1.47 k/sf


Per width load = 10.3 k/ft
4 Assume footing d = 9.00 in
5 Critical perimeter b0 = 100.0 in

6 Punching Shear 66.6 kips


OK
7 Concrete Shear capacity 170.8 Kips

8 beam shear 22.29 kips


OK
9 Beam Shear Capacity 71.72 kips

10 Mu = 525.00 kip-in l 2.92


b 0.58
11 Reinforcement Design:
Assume , a = 0.005
As = 1.08 in²
Check , a = 0.025 in

As Min1 = 2.39 in²


As Min2 = 2.52 in²
Select As = 2.52 in²
Select bar 12 mm
12 Spacing 7 in C/C
Provied 12 mm bar @ 7.00 C/C
Size (ft)
Bar Spacing
Gride ID ID
mm (inch)
Mu
L B (in-kips)
B-1, to F-1 F-2 3.5 3.5 96.43 12 5.5
B-4 to F-4 F-2 3.5 3.5 96.43 12 5.5
Given Footing information:

f'c= 2370 psi


Steel fy= 40000.00 psi

Min.
Type of footing Footing size Reinforcement Height,h Effective required
Depth,d As,sq in
L,ft B,ft Spacing Nos dia,mm
F3 8 8 5 19 16 10 7 3.15
F2
F3
Provided
Remarks
As sq. in

6.11 Adequate
1. Sway Calculation
Input Data,
Response factor,R= 6 Steel
Ct value= 0.083 Steel
Building Height,Hn= 5.99 m 19.66 ft
Time Period,T= 0.318 Second
Allowable Sway= 29.95 mm 0.288675 0.02995
Allowable Sway= 0 mm 2.16506 0.02396

2. Torsional Regularity (TI) Check


EQX EQZ WLX+ WLY
Deflection at one end= 0.693 0.27 4.9 100
Deflection at another end= 0.693 0.34 4.9 60
Avg.deflection= 0.693 0.305 4.9 80
so, TI= 1 1.11 1 1.25

3. Storey Drift Check

0.000116 Must lesser than 0.0025


Ct values
Steel 0.083
RCC 0.073
Others 0.053

R values
Steel 6
RCC 8
Masonary 5
DATA REFERANCE
1.a ZONE CO-EFFICINT (Z) = 0.15 BNBC TABLE 6.2.22
STRUCTURAL IMPORTANCY (I) = 1 BNBC TABLE 6.2.23
RESPONSE MODIFICATION FACTOR , R = 6 BNBC TABLE 6.2.24
SITE CO-EFFICIENT = 1.5 BNBC TABLE 6.2.25
BUILDING HEIGHT ( hn) ( meter) 10 METER
Ct = 0.083 BNBC SEC 2.5.6.2

T=𝐶_𝑡 〖 (ℎ_𝑛) 〗 ^(3⁄4)


TIME PERIOD, T = 0.467 BNBC SEC 2.5.3

C=(𝟏.𝟐𝟓∗𝑺)/
NUMERICAL CO-EFFICINT , C= 3.124 BNBC SEC 2.5.2 𝑻^(𝟐⁄𝟑)
C do not exceed 2.75 2.75

WEIGHT OF STRUCTURE = 1472 KN

BASE SHEAR , V = 101.2 BNBC SEC 2.5.1 V=𝒁𝑰𝑪/𝑹*W

LEVEL Wi hi 〖𝑊𝑖∗ℎ𝑖〗
4 0 10 ^𝑘 0
3 0 10 0
2 39 10 390
1 1433 5 7165
7555
W= 0
0.00

h1= 5 h2= 10 h3= 0 h4= 0


W= 0
0.00
𝑡 〖 (ℎ_𝑛) 〗 ^(3⁄4)
W= 39
15
5.22
W= 1433
95.98

101.2

Fx =
0.00
0.00
5.22
95.98
101.20
Cosmopolitan Industries (Pvt) Limited.
Project Name:
Address: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

BORE HOLE ID ALLOWABLE BEARING AVERAGGE DESIGN SOIL REMARK


CAPACITY ( TSF ) BEARING CAPACITY
BH #01 2.87 HYDROMECH
BH #04 1.69
2.095 2.095
BH #05 1.91
BH #06 1.91
Cosmopolitan Industries (Pvt) Limited.
Project Name :

G.B ID : GB-2
Materials Properties :
F'c = 2370 Psi
Fy = 40000 Psi

Design of Beam
Depth Width
Beam Size : 18 12
Effective depth d : 17.25 in
beam Length : 22.5 ft
Wall load : 0.225 K/ft
Beam Self weight : 0.3 K/ft
Total Dead Load : 0.525 K/ft

NEGATIVE MOMENT POSITIVE MOMENT


FEM ( MOMENT ) 7.23 kNm MOMENT 4 kNm
Design Moment = 5.33 k-ft Design Moment = 2.95 k-ft
Assume a , 0.77 in Assume a , 0.3 in

As = 0.11 in² As, = 0.06 in²

Check a, 0.17 in Check a, = 0.10 in

As min = 0.76 in²

As Min = 1.04 in²

Select As = 1.04 in² Select As = 1.04 in²

Grade Bean ID Location Req Pro Status


Top 1.04 2.40 Adequate
G.B-01 (18x12)
Bottom 1.04 1.44 Adequate
Slenderness ratio Calculation:

Column
b = 15 in
h = 16 in

Height, h = 14 ft

k = 0.5

Slenderness ratio = 18.66667


Slenderness ratio = 17.5
Fineness Modulus (FM) Calculation
Test Result
Sieve Analysis
Percent of
Material Cumulati
Seive size Seive size material
SL.No. retained ve % Percent of finer
(ASTM) (mm) retained
(gm) Retained
1 No. 4 4.75 7.0 (%)
1.4 1.4 98.6
2 No. 8 2.36 34.5 6.9 8.3 91.7
3 No. 16 1.18 137.0 27.4 35.7 64.3
4 No. 30 0.60 167.5 33.5 69.2 30.8
5 No. 50 0.30 107.5 21.5 90.7 9.3
6 No. 100 0.15 32.9 6.58 97.28 2.72
7 No. 200 0.075 8.8 1.76 99.04 0.96
8 Pan 4.8 0.96
Total 500.0 100

Gradiation Chart
120

100
Percent of Finer (%)

80

60

40

20

0
0.01 0.1 1 10
Sieve Size (mm)

Fineness Modulus (FM) 3.0258

0.5 filling sand


0.8 filling ssand
1.5 Plaster sand
2.2 to 3.0 Coarse sand
Primary section
Tapred column & Rafter

length = 19.95 ft

fy = 50 ksi 3.980025
load = 0.5 k/ft

Primary web depth = 9.06 199.0013


10.00 in 250 mm ,@ 1/3 part 5985
.@1
Tw = 0.09 in 3 mm 900 mm

Af = 0.45 sq.in

S= 6.01 2992.5
400 . @1/2
M= 18.65637 k-ft

F= 37.28 <<<<<<< 50

slope = 0.15 in/ft 1995


250 . @ 1/3
9.975 D at mid = 16.0 in 400 mm

D at start = 9.250 231.25 mm


at end = 3 75 mm 0
Shear V = 4.9875 kip 225 0
Stress = 5.99 Ksi <<< 50 1

For case 2,
h= 10.00 9.49715
Tw = 0.09
kc = 0.380 (.35~0.76)

Assume = 10 10 mm 580
b= 100.000 mm 24.08319
Axial Flexural 9.151612
web = 250 250 mm 229 mm
Web
tw = 2 2 mm
fb = 100.000 91.6 mm
Flange
ft = 10 10 mm
WELD RIGID CONNECTION
DESIGN

Cosmopolitan Industries (Pvt) Limited.


PROJECT: JOB ID: 1

ADDRESS: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh

DATE: 26-Nov-19

GENERAL DATA: WH = 250 mm


WT = 5 mm
ELECTROTEC = 60 KSI FW = 125 mm
Fw = 36 KSI FT = 7 mm

Lw = 15 IN

No-of-side = 2 1 or 2

Weld thickness , a = 6 mm
0.24

Capacity of weld = 137.4408 kip

Vu = 140 kip

D/C = 1.02

BEAM COLUMN PIN CONNECTION


WELD RIGID CONNECTION
DESIGN

Cosmopolitan Industries (Pvt) Limited.


PROJECT: Date : 11/26/2019

ADDRESS: Khejur Bagan, Bara Ashulia, Savar, Dhaka, Banglades

Materials Strength
Steel Strength 50 Ksi
Electrod Grade E70 Ksi

Moment 40.53 Kip-ft


Shear force 8 kip
Beam And Column Dimension
Hw Tw Wf Tf
Beam 22 0.16 6 0.32
Column 16 0.24 6 0.32

Arm = 21.68 in

C or T = 22.43 kips

Area of Groove weld= 0.50 in^2

Length required = 1.56 in


Design length = 2.00 in

Shear Check

Capacity of weld = 77.252 Kips OK

COLUMN AND RAFTER CONNECTION