Output TC TFC TVC AFC AVC AC MC


0 100 100 0 0 0 0
1 200 100 100 105 95 200 100
2 290 100 190 50 95 145 90
3 369 100 269 33.3 89.6 123 70
4 440 100 340 25 85 110 70
5 520 100 420 20 84 104 80
6 622.8 100 522.8 16.6 87.1 103.8 122.8
7 751 100 651 14.2 92.7 107 128
8 901 100 801 12.5 100.1 112.6 150
9 1098 100 998 11.1 110.8 122 197
10 1332 100 1232 10 123.2 133.2 234

Assignment 2

Table on Costs Analysis

COMPLETE THE TABLE BASED ON THE DIFFERENT COST CONCEPTS AND THEIR CALCULATION

Output / TC MC TFC TVC AFC AVC ATC


Q
0 250 - 250 0 - - -
10 350 10 250 100 25 10 35
20 420 7 250 170 12.5 8.5 21
30 470 5 250 220 8.33 7.3 15.6
40 510 4 250 260 6.25 6.5 12.7
50 550 4 250 300 5 6 11
60 600 5 250 349.8 4.17 5.8 10
70 660 6 250 410 3.58 5.8 9.4
80 840 18 250 590 3.2 7.3 10.5
90 1060 22 250 810 2.7 9 11.7
Assignment -03

Complete the following table, and also plot TC, TFC, TVC, MC, AC, AFC and AVC against Q

Q TC TFC TVC MC AC AFC AVC


0 420 420 - - - - -
1 500 420 80 80 500 420 80
2 560 420 140 60 280 210 70
3 610 420 189.9 50 203.3 140 63.3
4 670 420 250 60 167.5 105 62.5
5 745 420 325 75 149 84 65
6 840 420 420 95 140 70 70
7 960 420 539.8 120 137.1 60 77.1
8 1110 420 690 150 138.7 52.5 86.2
9 1196 420 776 185 133 46.6 86.2