27 February 2013
IN-PRINGIPLE ACCEPTANCE.
“This corticate is issued to E-OSM Pro Ltdto oortly thet the eSodtule (ECC
(Crete) Sysior, es submitted "to the Building and Construction Authorty
(BCA) through tho Buldings Innovation Panel, is heroby grantod In-Prncipla
Tor use In projeais it Singapore, subject to the Taliowing
canton
{be design end contri of any eubsequent projet adeting the elo
{ECE crot) Syatom ahold comply wih the at ot Acceplale Seton resrbed a
th prevatngAaprvad Documer sued by the Commlsionar of ling Cott.
CGhow Ket Chuan
Group Director, 3uiting Engineering
for Commissioner of Building Control
‘Building and Construction Authoriy
ow:
1. Data of Moma (E00-Crets) Syom submited to the BOA the the Bangs
Innowton Pane (6) oo valet B
2. This I-Pmnogle Acceptance doesnot xe ths eModue (ECC: Cree) Sytem fom the
need to obi the nacesary permis: sjpoval of plans fra fe relevant Teguatny
Shoes, nla BOASINGAPORE CIVIL DEFENCE FORCE ‘
ma SiNGarotG: CIAL DHHENCE FORCE
1 UDI Avenue 4 Sloapore MIgR27 we Ly
Wonks ai towtdlass s
22 February 2018
IN-PRINCIPLE ACCEPTANCE
‘This certificate is issued to E-OSM Pte Ltd to cerlfy that the eModule
‘System (ECC-Crete), as submited "= ™ to the Singapore Civil Defence
Force (SCOF) through the Buidings Innovation Panel, is hereby granted In-
conditions:
‘+ The materials used are non-combustibl
4
‘Princiale Acceptance!™"="for use in projects in Singapore withthe fofowing
| Me Bod/Geok Kwang
Director, Fre Safety and Shelter Department
‘Singapore Civil Defence Force
ats:
4. Dotais of eMadle Sytem (ECC- Crate) System submited fo the SCOF throuoh the
‘BungsInovaen Pane (SIP) are alate at BCA and SCOF
2 The InPircise Accstance dose not exam he eMule Stem (ECC-Cret) Systrn
‘tom the noad fo oblan the necessary permis or aperoval of plans am fe relevant
uoriles,ineutng be SCOP
-
(Opus
fer l-Crel
26 February 2013
INPRINCIPLE ACCEPTANCE
‘This cortfcate is issued to E-OSM Pte Ltd to cerily that the eModule
‘System (ECC-Crete), as submitted "=" to the Public Utilttes Board (PUB)
‘through the Buitings Innovation Panel, is hereby granted in-Principle
Acceptance" * for use in projects in Singapore subject to the following
conditions:
Code of Practica
For the water service installations and sanitary plumbing and drainage
‘system, the appicants nead to ensure that the proposed methods and
‘materals comply withthe Cade of Practice for Water Service Work, the Code
‘of Practice on Sewerage and Sanitary Works and the Code of Practice on
‘Surface Water Drainage.
casual
Koh Boon Alk
Director, Best Sourcing
(PUB Rep for Buldings Innovation Pane!)
1. tans of ettoade (ECC-Cret) Sytem suomi 10 te FB sug the Burs
Innovation Pavel (0) sr aalabie ot BCA and PU
2. This InP doceparce does nat exemgt the elodule (ECO-Cree) Stem fem ne
‘eed to obtain the necessary pormis or approval of lens Yon hw Wale Rocanton
(stv, Water Siply (Network) and Catcmen:& Waloways Doparmens of PUButhority
22 February 2013,
IN:PRINGIPLE ACCEPTANCE
‘This coticate is issued io E-OSM Pte Lieto certly thatthe eModule System (ECC-
Crete), as submited °°" othe Land Transport Authoty (LTA) through the Buildings
Innovation Panel, is hereby grated In Principle Acceptance?" for usa in projects in
‘Singapore, subject tothe folowing condition:
(i) “The oversized heavy vehicle movements on the roads proposed by the BIP
‘applicant shal be In ful compliance withthe requirements set forh by the Land
‘Transport Authorty gazetted In RULE 99 OF ROAD TRAFFIC (MOTOR
VEHICLES, CONSTRUCTION AND USE) RULES and ROAD TRAFFIC
(CONTROL OF WIDTH AND LENGTH OF MOTOR VEHICLES) RULES 2010
promulgated under tho ROAD TRAFFIC ACT."
CHUA CHONG KHENG
DEPUTY CHIEF EXECUTIVE
(INFRASTRUCTURE & DEVELOPMENT)
ate,
1. Dots of eu ECC-Lret) Sytem ante th LTA:hvough he Busnes Imovaon Pana
(GP) arava ECA ee LTA
2. Ts intmnope Aecptnce oes not exo he eu ECC-Crete) Sys Ue Hew >
Cuan tho neceseary pemts or approval of pans Wor ha felevan equa aumarts, Row
tra,Bos (seen
15 March 2013
INPRINGIPLE ACCEPTANCE
‘This cortfcate is issued to E-OSM Pee Ltd to certly that the eModule (ECC-
Crote System), as submitted" "to the Ministry of Manpower (MOM)
‘through the Builings Innovation Panel, is hereby granted In-Principle
Acceptance? ruse in projects in Singapore.
‘Chan Yew Kwong
{for Commissioner sf Workplace Safety and Health
Ministy of Manpower
Note:
4. Data of ele (ECC-Cee) Syston submited fo the MOM through the Bunge
Innovston Pane (P| re avaisle a SCA and MOM
2 Tis nPnaple Aeptance dos nt exept he eMotule(ECC- Crate) Syston fom te
"eet comply wih he Werle Safely & Heath Act nd is uber legion uo
oes not exe tar the need bain tha nacnsay pers of spre! of pans ran
‘he relevent regusory aortas, nen he HOMNational
environment
yency
28 February 2013
IN-PRINCIPLE ACCEPTANCE
‘This certificate isisued to E-OSM Pte Ltd to cerity thatthe eModule (ECC-
Crete) System, as submited °°"! the National Environment Agency
(NEA) through the Buldngs Innovation Penel, is hereby granted In-Pinciple
Acceptance!" # for use in projects in Singapore, subject to the following
condition
41) The development projects using the eModule (ECC-Crete) System
‘subject to compliance with the technical requirements and provsions
Which are stbulated in the Code of Practice on Environmental Heath,
Code of Pracice on Polluton Control, Code of Practice on Sewerage and
Sanitary Woks, the Code of Practice on Surface Water Dralnage, the
Environmental Protection and Menagement Act, the Environmental Public
Health Act the Sewerage and Drainage Act, and ther attendant
regulations, including the Environmental Protection Management (Contol
Cf Noise at Construction Sites) Regulation,
2) The use of the eModule (ECC-Crete) System shall not pose any
‘environmental or health concems tothe residents.
Mr Koh Chin Yong
Deputy Director
Central Buding Plan Department
oe.
4, Datals of eodse (ECC:Crae) Sylem submited fo the NEA trough the Builenge
Innovaton Prel (GP) re aatable st BCA and NEA
2.Ths In Piss Aoceplance does rot exempt the eee (ECC- Crete Stem fom he
need to obisn the necessary perms or spproval of pans from the relevant regatoy
utoties, eluding the NEA
ed Erol cova nougnengosgYour et Tok: 6321 6511
OurRel —: DCIADMINMEETINGIBIP_11 Fax: o2274772I62274792
Date Feb 2013, EVWIAIL: wre_daes.regisry@ura.gov.sg
IN-PRINCIPLE ACCEPTANCE
This cottiicate is sued to E-OSM Pte Lid to cerily that the eModule
‘System (ECC-Croie), as submited M*™ to tne Uroan Redevelopment
‘Authority (URA) through the Buldings Innovation Panel, is hereby granted In-
Principle Acceptancs"™**" for use in projects in Singapore
Hi
Me Han Yong Hoe
‘Group Director, Development Control
Urben Redevelopment Authoriy
org
1 Datalsof Madar ube Design Syste submited to the URA trough the Buldnge
Innovation Paal (BP) ae eval t A ard URA.
2's inPince Aeotanoe does nt ext the Modular Cube Design Sem tom the
need to obi the necessary permis or spol cf plans fom the rvanteutaites
Freud the URA
stl eco ge ee