Professional Documents
Culture Documents
Footing Schedule: 4" THCK (100mm) CHB WALL With 10mmø Vert. & Hort. Bars Spaced at 0.40M & Every 2-Layers Property Line
Footing Schedule: 4" THCK (100mm) CHB WALL With 10mmø Vert. & Hort. Bars Spaced at 0.40M & Every 2-Layers Property Line
0.75m.
PROPERTY LINE
D
4-12mmØ RSB
200mmx200mm
C2-F3
t
2" THK GRAVEL BED
0.20m.
10mmØ TIES
1.00m.
0.40m. SPACED; 4@50mm,
1.25m.
3@75mm, REST
10mmØ TRAVERSE BARS 150mm O.C.
SPACED @ 300mm O.C.
0.25m.
Y 5-12mmØ RSB
2" THK GRAVEL BED
3-10mmØ LONGITUDINAL BARS
L 0.75m.
10mmØ TIES
0.75m.
SPACED; 4@50mm,
3@75mm, REST
150mm O.C.
0.75m.
X
W
4-12mmØ RSB
1 DETAILED WALL FOOTING 200mmx200mm
S-5 SCALE 1:50MTS
C2-F3
2" THK GRAVEL BED
10mmØ TIES
1.00m.
FOOTING SCHEDULE SPACED; 4@50mm,
1.25m.
3@75mm, REST
FOOTING FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS 150mm O.C.
MARK LENGTH WIDTH DEPTH THICKNESS
BAR X BAR Y
0.25m.
(L) (W) (D) (t)
0.75m.
PRC REG. NO. PRC REG. NO. 0120204 DESIGNED BY : PROJECT TITLE PROJECT OWNER REVISIONS SHEET CONTENTS
NO. DESCRIPTION DATE
PTR NO. PTR NO. 4708006 DRAWN BY : PROPOSED HOUSE EXT.,
ROBERTO NOLLORA JR ISSUED ON MS. MAUREEN DELA CRUZ DIEGO DETAILED WALL FOOTING
PLANNER
ISSUED ON
CIVIL ENGINEER
02-24-2020 CHECKED BY : PERIMETER FENCE & GATE
FOOTING SCHEDULE
S-5
LOCATION BLOCK 15 LOT 06
ISSUED AT
T.I.N.
ISSUED AT BALIWAG BUL. APPROVED BY :
T.I.N.
PASEO DE SAN ROQUE PHASE 2
ADDRESS