Professional Documents
Culture Documents
Singapore Seminar 14.05.2020
Singapore Seminar 14.05.2020
CONTINUOUS NETWORK
MONITORING SERVICES ON-SITE 100kV
TEST FACILITY
OEM
ON-LINE PARTIAL
DIAGNOSTIC
TESTING
- IEC60270 Definition
33kV solid-insulated switchgear (1960s), UK HV stator winding on critical 11kV pump motor
Other PD in cavities, or
PD in air gap between PD at sharp points on PD at high-stress regions on surfaces due to
bushings and spout connectors etc. on polymeric components manufacturing error or
contamination
Effects of PD activity
Tracking
Rust and severe chemical
Bulk erosion of polymer in Large production of ozone
attack, with large Fast growth of tracks from
tracks near high stress and easily audible
production of nitric acid & HV to earth.
conductors discharges
contaminants
FLASHOVER → FAILURE
ADVANTAGES DISADVANTAGES
Transformer Housing
TRANSIENT EARTH
AIRBORNE ACOUSTIC
VOLTAGE (TEV)
PROBE
PD Measurement Theory
PD in Transformers
HVPD Ltd. | Sensor Options for Transformers
ADVANTAGES
Can be installed online.
DISADVANTAGES
Not applicable when windings are bus-
fed (though can be attached to
transformer earth connection).
DISADVANTAGES
Susceptible to noise from HV connection.
END-WINDING
DETERIORATION DUE TO
INADEQUATE STRESS
CONTROL
Where to Start | Example Phase Resolved PD Pattern / Heat Map from HVPD Kronos®
Where to start?
HVPD’s solutions
IDENTIFY - DETECTION
LOCATE - DIAGNOSTIC
Fixings Permanent
Full network integration into SCADA systems via Modbus over TCP/IP. Other
SCADA Integration?
protocols are available on request.
Software HVPD Kronos® Software / HVPD Kronos® Web View (with local server)
Transient Earth
Capacitive Switchgear / Cable Terminations
Voltage
0.6
0.5
0.4
0.3
0.2
0.1
0
0.01 0.1 1 10 100
Frequency (MHz)
COMPLETE MONITORING
BARRIER
INSULATOR WITHOUT
standard
OUTER METAL
ARMATURE
PERMANENT
CASTING APERTURE OF
GIS BARRIER
INSULATOR
PRESSURE-SEALED
HVPD GLASS WINDOWS
manufacture as - OPTICAL
WINDOW
bespoke INSPECTION OF
ISOLATING
DISTANCE IN THE
DISCONNECTOR
- INSTALLATION
PURPOSES
EXISTING FLANGES
DISK
- MOUNTING
- EARTHING SWITCH
PERMANENT
INTEGRATED
AUXILIARY
POTENTIAL GRADING
ELECTRODES IN
BARRIER INSULATOR
Case Study | OLPD Testing & Fault Location on 33 kV Offshore Wind Turbine Subsea Cables
OLPD TEST 1 WAS CARRIED OUT AT THE 33 kV GAS INSULATED
SWITCHBOARD (GIS) AT THE MAIN PRODUCTION PLATFORM USING THE
HVPD LONGSHOT™ TEST UNIT WITH A COMBINATION OF HFCT AND TEV
SENSORS ATTACHED TO EACH PHASE OF THE CABLE AT THE EARTHED
TERMINATIONS.
Case Study | OLPD Testing & Fault Location on 33 kV Offshore Wind Turbine Subsea Cables
OLPD Test 1 | At 33 kV Switchgear on Platform
OLPD TEST 1 WAS CARRIED OUT AT THE 33 kV GIS ON THE MAIN PLATFORM.
THE RESULTS IN THE TABLE BELOW SHOW SIGNIFICANT ‘REMOTE’ PD ACTIVITY
(OF UP TO 6.33 nC) WAS DETECTED ON THE YELLOW PHASE OF THE 33 kV
CABLE FROM THE WIND TURBINE A PLATFORM.
AIS
PEAK PD LEVEL OVER TIME BEFORE AND AFTER YELLOW PHASE 275 kV BUSHING REPLACEMENT
THIS INTERVENTION AVOIDED AN INTERNAL FAILURE AND EXPLOSION OF THE TRANSFORMER
BUSHING THAT WOULD HAVE BEEN SERIOUS IN TERMS OF COST (OUTAGE COST OF £6.1M) AND ALSO
A HIGH SAFETY RISK (PORCELAIN ‘SHRAPNEL’).
OLPD MONITORING AND TRENDING OF THE TRANSFORMER IS ONGOING AS PART OF AN OLPD
MONITORING SERVICE CONTRACT WHERE HVPD PROVIDE ADDITIONAL TECHNICAL SUPPORT, DATA
ANALYSIS AND REPORTING TO THE OWNER.
UK PHARMACEUTICAL MANUFACTURER
PD PATTERN I - SLOT
SECTION PD + SLOT EXIT
SURFACE DISCHARGE
PD PATTERN II – INTERNAL
PD + SLOT EXIT SURFACE
DISCHARGE
Results
LOW LEVELS OF OLPD ACTIVITY DETECTED ON PHASES V AND W
Conclusions
WE SAVED OUR CLIENT OVER $12 MILLION USD BY DEVELOPING
NEW, PATENTED TECHNOLOGY TO MONITOR PARTIAL DISCHARGE.
OUR SOLUTION EXTENDED THE ASSET LIFE OF 100 10 kV MOTORS
WHICH WERE IN-SERVICE AT THEIR OIL REFINERY.
“
“ We require a reliable 5 -year asset life extension of our 10 kV motors, including PD
monitoring of stator insulation - but without having to enter the hazardous gas zone.
M
Reliable Asset Life Extension | Project Brief
Part of Condition Reporting gives Allows client to
Based Maintenance insulation risk focus repairs
(CBM) Program. of all during scheduled
10 kV assets. downtime.
JANUARY 2019
More webinar coming up..
Singapore- Visit: www.cetm.com.sg under events
Malaysia- Visit: www.cetm.com.my under events