You are on page 1of 20
be BRU GOPAL CONSTRUCTION CO. PVT. LTD. C Lace \ikash Surya Shopping Complex. Ploy no. 18, "Floor, Mangala Palace, Secter-3, Rohini, Delhi-110085 mal} info @bgcein, baccpl@yahoo.com BGCCPL/2020/NH-12, BPLWOI010 Date: 9" January 202+ To, Mis Hitech Civil test late Pvt. Ltd, ‘Agarwal Nursery, Genhukheda, Near D-Mart, kolar Road, Bhopal-462042 (M.P) Contact Ne.: +81 7400850008/8234037 008 Email Id: hitechcivitestiab@gmail.com Briof Firm Details: _ 7 PAN No, ‘AADCHADO2P. GSTIN No. 23AADCH4002P1ZR___ Fim Type | [Ownership - Banker — [Allahabad Bank : ich ‘Arera Colony, Bhopal ‘AccountNo «dt 80215 190278 IFSC Code. I ‘ALLAO210197 : Kind Alin : Mis Hitech Civil est jabs Pvt. Ltd , Mob. - +81 7400850008 / 8234031008. ‘Subject: Rehabilitation and Up - gradation trom Start of Bareli Bypass from Km. 130.00 to End at Bineka Vilage Km 252.600 (Existing Ch. 193,00 to Ch. 256.300) of NH-12 (Package-tV) (Design Lengtn 59.600 Km.) to four lane with paved shoulder under NHOP-V through Engineering, Procurement & Construction (EPC) Basis Contract ' in the state of Madhya Pradesh on EPC mode. “Work Order for Mechanical Testing of Schedule K Test”. 4. Contractor Offer dated 08.01.2021 & verbal negotiations, 2. Subsequent meetings held with undersigned Mr. Rajesh Golhani (G.M. Projects), BGCCPL. Dear Sir, ‘This isin reference to your aforeBaid offer submitted in connection with the work under subject. Relying on your representation And assertion of your capabilities and expertise, we are pleased to ‘accept your offer and award the work of “Mechanical Testing for Schedule K Test’, at NH-12 Road Project’ ‘We are pleased to Issue a work order. detailed as under: ee Description Quanity | unt | Rate | Anau | 1 Rebound Hammer - 1 Per Point 7 2 Ultrasonic Pulse velocity 1 | Per Point | 3 Pavement Computations Test | 1 | Per Point [4 Cross Section Te 1 | PerTest (pps Bridge Load Test 1 | PerSpan [ RNAS bScc)s} Sai 8CeCP(/2020/NH-12, 8PL/WO/010 Page 1 of 6 | BRU GOPAL CONSTRUCTION CO. PVT. LTD. \ Vikash Surya|Shopping Complex, Poy no. 18, 4” Floor, Mangaiamy Palace, Sector-3, Rohini, Delh110085 Email info@bgcci, bxecol@yahoo.com T T- 6 NSV( Network Survey Vehicle) 4p ete 7 ~Envronmental Safety Audit + | Nos. 8 Roughness [est(B!) 4 | arlene - ‘Ambjent Air Quality ] Noise Level Monitcring Environmen | _ StackMonitoring (0G = 9 | tSately 1 | Se Quarter fo | ‘Suet Cneeeic 1 | Percore Per " Hard Shoulder at Site 1 | Se : For compliance of above, we ate i after mutual discussions 1. ‘Rehabilitation and Up Bineka Vilage Km 252 (Design Length 59.600 Engineering, Procurema Pradesh on EPC mode. Ki ‘nt “Wis Brij Gopal Construc "BGCCPL’) has been Client, M/s Madhya Pr Mis Hitech Civil test fal ‘Schedule K Test’. at NI Construction Company. ‘Terms related to rates ar a. The Rates agrees insurance. The rates shall remai any adjustment for an} Instruction of Drawing} Delay in completior 0.5% per week or pai b. 4. ASIN (Sa RS BECCPL/2020/NH-12, BPL/YWO/010 issuing this work order to you as per Terms & Condition as set forth gradation from Start of Bareli Bypass from Km.130.00 to End at 1600 (Existing Ch. 193.00 to Ch. 255.900) of NH-12 (Package-IV) im.) to four lane with paved shoulder under NHDP-IV through & Construction (EPC) Basis Contract ' in the state of Madhya hereinafter referred to as “Project") ion Company Pvt. Ltd. (hereinafter referred as “Employer “Clent’/ ed the EPC Contract of the above mentioned project by the deen Road Development Corporation (MPRDC). Pt. Lid has been awarded the work for Mechanical Testing for 12 Road Project Contract by the Employer/Client (Mis Brj Gopal as under re inclusive of all taxes, duties cess, levies, incidental charges, fixed and firm for the entire duration of work and is not subject to reason whatsoever including variation in quantity. 8 Design of Designer & Authorities will prevail this WO, if any. of works beyond scheduled completion would attract LD @ thereof and maximum up to 5% of contract value. Page 2 of 6 BRU GOPAL CONSTRUCTION CO. PVT. LTD. L Lace Vikash Surya Shopping Complex, Ploy no. 18, 4" Floor, ‘Mangalam Palace, Sector-3, Rohini, Delhi-110085 fo@bgcc.in, beccpi@yahoo.com Email: 6. SPECIAL TERMS AND CONDITIONS: 1) Mobilization Advance} No advance shail be payble by BGCCPL to the agency. 2) Material/Work Advance: No advance shall be payble by BGCCPL to the agency. 3) Idling Charges: No idiing charges towaris manpower shall be payable for whatsoever reasons. 4) Late : No intrest on late payment shall be made. 5) Other Deduction: Deduction as determined by the Preject Manager of BGCCPL pursuant to any clause of this ‘work order term & conditions shall be final and will be mace from the amounts payabie to the ‘Agency for the work executed anc measured. Ali expenses related to testing of various ‘materials for approval, logal charges and other unforeseen expenses, i any will be borne by the Agency, 6) Rate: The rates stated in the BO shall be inclusive of all direct and indirect costs, statutory legal ‘and contractual complignces, overheads and profit margin for executing the piece rate Contract work comprising of, loading and unloading, handling and storage costs, re-handiing, Cost as required during the executicn of the item rate contracts work, all temporary works, mobilization & demobilization of manpower, plant & machinery, materials ete. at site Agency is deemed to |be aware that the work may require muttiple mobilization and emodiization of their manpower, materials, plan's & equipments including provision and maintenace of temporary camp, store, work shop, leaselrent of land for installation of plant ‘and material stock area ¢tc. The rates are dee,ed to be inclusive of all such contgencies, 7) Payment: ‘The approved work executed during the preceding month shall be measured along with signatures & as per drawing for preparation of monthly bill under relevant BOQ items of the work. The Project Marlager of BGCCPL shall approve the monthly bil covering the measurment of the work executed during the preceding month for the payment under the BOQ items, subject to detiuctions of retention, recoveries against issues by BGCCPL, penelty, ‘other deduction as applicable in terms of this work order and tax @s applicable. Payment Shall Be made in the following manner. |) 30% Payment ater compliting of tests il) 50% Payment after submitting of test reports ) 20% Payment after getting approval from Authority's Engineer/Authonty aN GCCPL/2020/NH-12, BPL/WO/010 Page 3 of 6 L BRU GOPAL CONSTRUCTION CO. PVT. LTD. c pee \ikash Surya Bhopping Complex, Ploy no. 18, 4° Floor, Mangalam)Palace, Sector-3, Rohini, Delhi-110085, Email jinfe@bgcc.in, bgccol@yahoo 8) Taxes & Duties: The rates are inclusive|of all taxes & duties as applicable and same will be deducted fromo Payments as applicable However with regard to liabiity of the GST, the same will be transferred to BGCCP}. to the extent of input credit avallbale wth the Agency against purchase of execution pf above said work under his scope without any additional cost. The differences of GST afte} deductiong input credit wll be provided by BGCCPL. 8) Retention: ‘An amount equivalent fo 8% of the gross value of work done shall be deducted from the ‘monthly bill payments. Buch withheld retention amount shail be released after three months ‘completion of work as slated in “Scope of Work’ 410) Safety: The Agency shall be aided by the instruction of the safety Engineer of BGCCPL to comply with the safety pian of BGCCPL. The Agency shall be responsible for safety of its empolyees and will provide safety jackets, helmets and shoes supplied from BGCCPL at free of cost and retumable basis. 11) Environment: The Agency shall be abjded by the instruction of the Environmental Engineer of BGCCPL to ‘comply with the Environmental Management Plant of BGCCPL. in complying with the instruction made out in aursuant to the work il be referred to the Project Manager of BGCCPL whose decision in and binding, order terms as above this regards shall be final uirments: to have, prior to the accepantance of this Work Order visited, to work location and the work requirments and to have taken into formation while agreeing to the rates, terms and conditions of this Werk Order and no clairis whatsoever shall be considered in this regards. The agency |s also deemed to have taken into consideration/account all benifits and other factors due to the labour and staff rules and regulation while quoting rates for the work 13) 1") , That the Agency will abjde by all laws govering employment and safety of labour ans in Particular with pravisions|of the Minimum Wages act 1856 and Workman Compensation Act 1923, Provident Fund Agt 1956 (ESI & PF) and the rules and regulations framed under the said Acts trom time to evidence. if any amount terms of provisions of from the Agency. The BGCCPL/2020/NH-12, BPL/WO/O10 Page 4 06 | BRIJ GOPAL CONSTRUCTION CO. PVT. LTD. L Gee Vikash Surya Shopping Complex, Ploy no. 18, 4" Floor, Mangalam Palace, Sector-3, Rohini, Delhi-110085 Email: info@bgcc.in, beccpl@yahoo.com 18) Accommodation for Labour; The Agency has to make necessary arrangements and facilites at his own cost for accommodating manpawer and transportation for manpower uptosite, this is deemed to be included in the item rates and amounts, 18) Local Conditions: That the Agency shall at all times during the currency of the contract, comply fully with all the ‘existing Acts, Rules, Regulation and Bye laws including all amendements to date regarding labour, traffic and Envitonment Laws. Any dispute in this connection with BGCCPL and or Govt. bodies shall be the sole liability of the Agency and BGCCPL shall not be reponsible for the same. In case of ary liabiliy arising to BGCCPL as the main contractor due to failure on Part of the Agency, the game shall br recoverable from the Agency. 17) Indemnfication: The Agency shall indemnify BGCCPL for inplications of any failure of the Agency to adhere to all statutory laws and regulations. The Agency shall indemnify BGCCPL from impications of any accident/injuries/casualty/dameges to resources due to to negligence or action of the Agency. 18) Responsibility for damages: In case the Agency dameges any BGCCPL property or resources while excuting the work, then the Agency shall be fully respincible for making good and compensate the losses. 19) Force Majeure: That neither BGCCPL nor the Agency shall be held responsible or considered to be default, if any the execution of work order is delayed or interrupted due to the cause absolutely beyond their control such as act of God, natural calamites, war, major civil commotion, fire stroms, floods, strikes, or lock outs and considered as beging causes of Force Majeure. In such event, ither party shall not compensate the other for the loss that might accure or might have ‘accured because of the effect of such event upon the execution of the contract. If Agancy ie tunable to perform as per the contrect beyond 7 days due to reasons attributable to force mejeure conditions, BGCCPL reserves the right to make immediate arrangement for engaginig other Agency for the same work without assiging any liability to the existinig Agency 20) All the machinery, manpqwer, tools and tackie shall be arranged by the Agene. 21) Termination of Work Order: This agreement can be terminated by either of the parties giving prior notice of 7 days with reasonable causes to the other party BGCCPL reserve the right to terminate the agreement following reasons:- Inadequate rate of porogress of work by the Agency; of Substandard quality and workmanship by Agency; or Fallure of the Agency to meet the requirments set forth in this work order; or Rescission of contract between the principle Employer and BGCCPL. Reasons beyond BCCPL contro BGCCPL/2020/NH-12, BPL/WO/010 Pages of BRIJ GOPAL CONSTRUCTION CO. PVT. LTD. bec ‘Vikash surya Shopping Complex, Ploy no. 18, 4" Floor, ‘Mangalam Palace, Sector-3, Rohin, Delhi-110085 Email: info @bgcc.in, bgecol@yahoo.com Deploy within 7 days @ new Agency for the same work. 22) Settle isputes: ‘Any dispute arisinig out of this Cortract work shall be seed amicably through the Project Manager of BGCOPL within the terms of this work order. In case of failure to settle amicably, the disputes shall be finally resolved in accordance by the Mangements and Managing Director of BGCCPL, New Delhi, which will be final and binding on all and there will be no further claims or dispute arisen on accounts of the same by the same. The said work order being issued from Bhopal as RO office of BSCCPL, the Court of Delhi shall have the exclusive jurisdiction in the tnatters under this Work Order. You are requested to confirm your unconditional acceptance of the conditions contained in this Letter by signing and returning back the duplicate copy within three days from the date of issue of this Work (Order (WO) and start the work in next seven days. For Brij Gopal Construction Co. Pvt. Lid. Agroad & Received by Agency ‘Approved By 7 Accapled By: . ooce. Ia Hitsch Cir Feats Bee S) y | is \ y Ay) ORE Fe Authorised Signatory ~ [Authorized Signatory ~ | SGCCPL/2020/NH-12, BPL/WO/0L0 Page 6 of 6 RE Infra Projects (P) Lid . 20, BAGH FARZANA AGRA- 28201 od Werk Order No. & Date i ARO eh Toet Lait PEAY \skSinhander2020-21,0/0010 0718/2009 ity Ofc : Agrawal Nursery Cenk Near D- erence (Poject Se Nae: Dabot-Boander NHS52 Ext ea naa reat GS No. SAADCHAOD?PIZR, [Conte Person: Me, Sanjay Sharma 9427328111 S.No tem Description oy vom Rate Asionnt oughnest Test (Test Conducted According w IRC-SP:16-2019) } ic bas vfreceo you quan ou had with ip. We plead o pave Machina Testing fortem a por flowing set | |] | sees [exten 2 fBedge oe rest | 1 Per Span Icore| Biunea & T 3 [Concrete Caine ~ | 1 Core resins) | 4 [Rebound Hames ' Per Point Ltraonic Fae | . wicleee | 1 Por Point 6 font satey Aust 1 Kilometer [environment ster A ‘ling Adres SKS atin Projects Pvt Lid Pale! Vata Sarai Road Bhonder Dats MP | suaancsuarzw Co, MP.GSE No. r LWA ENG Keltia House’, 193, Satyagat “Tele ax: 079-23681336 Kalthia WORK ORDER| ef: KECL/WO/THIIS Nt he Direat Hitech Civil Test Labs Pvt. Ltd ry. Genhukheda at Kolar Rol MP) Werk Onder for Mecitd gradation of Thik arly understood t quotation. W. fork. Tis 6 submitting vo Jbove subject hus been aced ‘sand other terms: | KAL-PHIA ENGINEERING AND ¢ NEERING AND CONSTRUE OF ‘Gthaveni, Opp ISCON Nal, Highway, Ahmedabad 380015 Gujarat ar koceagroup com Website wivnxetizrsu. 2 Jron MECHANICAL & NON DESTRUCTIVE TEST 478/2020/39 20% rewber, 2020 sur work “Rehabilitation and eof Madhya Pradesh ructive a pineal & Non De: Anjo Section of N |, iscussions subsexquent to your quotation of the above said iyou have visited and accessed the site cond Jrewsed to inform you that your offer Far work captioned in Ta Therelore, this work order is issued hereby on mutual rertioned ereinatt ‘ons prior ti est Labs Pvt. Lid. o foiittame | ject vi 1 2 us ona an = 4 i waadress() civ GT Test as Pt Ed Nice Rol oad Bho pte i O ~ {abr 1Nv00: - = 3 o SeawcHi0aaeTTR - 6 Caaicorineal feison (POAT) |: | Rahul Patel 2 | > ntact Nunber of Alahorced FetsaasT in Type of Work - Work (eder for Mecha neal & Non Seen pee att qf Quanttas (em Kates) DNSTRUCTION LIMETU HA ENGI alta House", 193, Satyagarh TelefFax’ 079-2686 1539, \althia | tem Description unio Mechanical RD im lraige aad Test, z frm Roughness Test (1) EERING AND CONSTR havan, Opp. SCON Mall. S.G Highway, Armedabad 380015 Cxjrat Aa keledal jaqoun.cem Website www kath arovp com Remarks E | Road Safauy Auait rest 1b Payment shall © Commencement of work shall {&Thesnavimum time period all Xi amount of Rs, 8000 shall bg {Test reports for furnished st 4g Taxes and duty according to a hia Engineering and Const (autharized Signatory) apausit | General terms and conditions, applicable from 20-10-2020 te bill submitted on finalization ofthe thereof work J done on oF before 5 days of prior informati otk 14 days Fora ved for eumpiete scope of yall ar transport p be provided within 7 vernient rules shall be exclusive of annewure-B rates stetion LU Laccept the above Terms and Conditions For Marg ‘Te e ‘TRG/Porsa-Ater-Bhind/2{ To, Tech Laboratory & Servi Bhopal (M.P.) Sub: Rehabilitation & Up with paved shoulders Flexi 295+200 to Km 343+800 | from 326+650 to 328+350) Bhind city aroundwhich byt existing Km 285/75 to 290/ newly deciared NH-552 Ext, Reg: Testing as per sched Dear Sir, With reference to your qu are placed the order for schedule-K of contract aa etc. And provide the results 1) Environmental Safety 2) Environmental Safety| 3) Road Safety Audit 4) NSV Report TRG INDUSTRIES PRIVATE LIMITED ENGINEERS & CONTRACTORS Greater | sh-ll, New Dethi - 110 048 29210167, 41638957, 40575191 Fax ; 29214429 trgindustry@yahoo in CIN : U45202JK1980PTCO00446 }-21/Qn/266 Date: 07.12.2020 radation of two lane flexible pavement to 2 lanes le Pavement on Porsa-Ater-Bhind Road from Km sngth of 46,90 Km ( excluding Realignment Section and Conventional White topping (inside Porsa and Jass has been proposed in length of 8.35 Km from. 5 & 340/20 to 344/25) on Porsa to Bhind section of in the State of Madhya Pradesh. lule-K of Contract Agreement. tation and discussion held with you we (the client) ynducting below mentioned audit and test as per jement please mobilize your team for take sample Reports ASAP for above mentioned project. lAudit Test. 5) Bump integrator Repprt ) NDT Test 7) Different test of Fiexit For TRG Industries Pvt. Lid + sare — (ai sFaniker Prasad Tiwari) Authorised Representative Encl: as above Copy tt ‘eam Leader, Artefact Pvt Ltd. D-06,7R Puram 476003, (M.P.) le and Rigid Pavement like Core test, Gradation etc. ‘ject Limited In association with AICONS Engineering {Colony C/o. Yashpal singh Jat, AB road Morena Regd. Office : GMC-29, Rail Head, Jam fnu- 180012 Tel. : 2471857, 2471606 Telefax : 0191-2471605 4 Agroh Infrastructure Developers Pvt.Ltd. 7 ‘Aqua Point, Old A.B. Rbad, Gram Umariya, Teh. Mhow. Dist. INDORE - (.P_) 453331 AIOPL Tal. No] 07324-268307, E-mail: aidpi@rediffmail.com CIN : U45203MP2001PTCO14590 Work Order No AIDPI/GUI/PKG-4/ OA/2029/390 DATE OF W.O. : 25 October 2020 To, HITECH CIVIL TEST LABS PVT. LTD. Agrawal Nursery, Genhukhesia, ‘Near D-Mart, Kotar Road, Bhopal, Madhya Pradesh-462042 mai 1D hte iiviestabgmailcon, PAN No. AADCH4002P STN ADCH4002P1ZR AIDPL GST No.: 24AAECA2754L1ZQ Bank Details Allahabad Bank | Areva Calony|hopal [ A/e No SUOSIOOR [TARE WORK ORDER Kind Attention: Shri Prashant Ndgrikar ‘Contact No: +91 89625 07951 Subject'~Four Laning of Kagavaglar to Una from km 139915 (Design ch.km 140.470) to km 180.478 (Design ch.km 181.450) off NH-8E (Package -IV) in the state of Gujarat through Public Pactnership (PPP) on Hybrid Annnhity Mode (HAM) under NPD Phase.IV Reference: As per mutual discussion as wpll as received quotation on dated 25 October 2020 we are issuing the Work Contract|for conducting Mechanical Testing (Schedule-I as per Concession Agreement for Prp-COD) at selective locations in-between the subject project for Package-IV. Location] and Test details will be decided by AIDPL. Dear Sir, With reference _to_ subsequent discussion with yourself, we Agroh infrastructure Developers Private Limited (herPinafter refer as" AIDPL”) are pleased to issue this Work Order to HITECH CIVIL. TEST|LABS PVT. LTD. (herein after called as "HCTLPL") for the aforesaid subject work based on the mutually accepted and finalized rates, terms and conditions. 1) Scape of work Scope of work for shall entail items including but not limited to the items mghbioneg in ‘ the BOQ Workssney be ace bt oc move fromthe mentioned ope, vay Gonnesing HA Sia ini tL Test to be conducted are includisg the following: Equipment and material:- All testing equipment including testing procedure under Agency’s Scope Manpower ‘Technical manpower and skilled labour required for conducting the aove test, Documentation : All type of documentation} including carrying out report/result, work method statement, test reports, etc. as Fequired by client in your scope. 2) Commencement of Work The work shall commence within 15 days after received of WO as per guideline by AIDPL & complete works will be carried out as per technical specification & MoRT&l1 and same has to be handed ovgr to the AIDPL in proper manne: 3) Bill of Quantity _ —HILL OF QUANT TES (BOQ) Sl Trem " Quantity | Unit | ~ Rate IN) to he Bag | a, Mee Deesiptionnay et (Ne) finalized by MD Sir | (1 | Rebound Tamer 609 | Per Poi To be fnahaed by aD | Se 2] Ultrasonic False Vetod 7 5 pers a 4 | Pavement Compotation Tey ¥ ado j 3__| Gross Section Test (Road) | Cy do « : 2 E Ee Bit. j | | | 4 | | | Monitoring | ETP Outled) | Le ality | i ring ee {3 ize Analy Per Camp ‘Attrelpg’s Limit —] MDD. a8 — CBR a Free Spell nde] “| _ [Speci Gavin] ds a Page 2 INR) to be do air oF omaNTTES OQ Item Description in brief Canty | ee finalized by MD Sir | comp | | | | “10. | Fine Aggregate | fer | | (sand Sond, come | Stone Dest | | os | | ~ |r ae comp | . | a | a = Mobilization of manpower § equipment’s ‘The agency shall mobilize hnd deploy at site adequate numbers of the manpower, tools/tackles and necessary] equipments for carrying out the allotted work smoothly and to our satisfaction, 5) Facilities To conduct the test requirfd machinery like JCB, Hydra/Crane, Excavator to be provided by AIDPL. Balance nstrument needs to be arranged by the Agency Page 3 of 5 6) Back to Back This is back to back work client are applicable for the fontract, wherein all terms and conditions from principal vorks done by you. This includes the technical as well as commerial terms and corttions All the tess to be eared out by prewrce. of ve representative of AIDPL a 7) Quantity Variation ‘The Quantity mentioned in per decision of AIDPL/MI basis. 8) Representation HCTLPL shall Agroh Infrastructures De ‘communication, attending, 9) Documentation Alll documentation related to] MD Sir, project in-charge ‘methodology, final reports, 10) Legal compliances HCTLPL eligible to work, e labour and employment Ia Agency. fhe BOQ is tentative and required test to be conducted as it. This may vary to any extent based on requirement jelopers Pvt. Ltc., including correspondence, verbal tings ete. with the client and/or project in-charge. tall times te executing the project work shall be representative of time to time including but not limited to program, ll be provided by HCTLPL. IHCTLPL scope of work that is required by the AIDPL and iploy and act as per laws of the land, including taxation, of the state and country. HCTLPL will have to provide Proof of registration with thx department, Provident Fund, GST, Income Tax etc Additionally, with each runni 11) Payment terms - 11.1. 50% Payment shall be ing bill. jrovided in Advance along with WO and rest to be 30% to. be provided after complete submission of all reports of all BOQ tests 11.2. All Quoted rate to be figalized by MD Sir. 13, ent shall be made! 114. GST will be paid SI Agency has to provid within 30 days after certifica n of the invoice FARATELY as per norms Government of Indiaand the GST details in forthwith. In case the sub-con unable to provide the GST details[that time case will be considered as URD. 12) Taxes ~ ‘TDS and any other statutory relevant statutory provisions wery will be deducted as per Government norms and Sub-Con work bills Page of 5 13) Accommodation & Food Arfangement: Accommodation, Food, Boafding and associated staff will be arranged by the AIDPL. No overtime to be paid to anyy staff by AIDPL. 14) Under Age Labour: The Sub-Contractor shall Jrot employ or engage any labour or other personnel whatsoever involved in the project in any capacity, either on site or at an offsite location, who is under the age of 18 years. 15) Technical Procedure Prepared report should megt as per MoRT&H specification and conforming to the all technical parameters. 16) Commercial Part Bill to be prepared upon corppletion of the work along with all supporting documents mentioned! in the condition of contract anc as required by the Project in-Charge. 17) Safety & Insurance Agency shall take all suitablp steps for security and safety of agency's workmen and equipment as per good industry practice. Agency shall have their workmen and equipment adequately coveted by insurance including accidental damages Cost of injuries in respect of agency’g workers shall be borne by agency only. AIDPL will not be liable for any such claim, 18) Disputes Any disputes regarding Corfract shall be resolved through otfice of Director, Indore (MP) only and the Legal JurisHiction of the agreement will be Indore, Madhya Pradesh, This work order is issued in tripficate. Agency shall return original and duplicate copy of the same after signing, on all pagds (and affixing seal) as a token of acceptance and triplicate will be treated as Sub-Con copyland at every occasions sub-con are requested to provide Photocopy of triplicate copy along with RA bill. ‘Authorized Signatory ‘Accepted By AGRO INFRASTRUCTURE DEVELO HITECH CIVIL TEST LARS PVT.LTD. | Page 5 of 5 WAGAD WORK ORDER Ref: WIPL/WO/TESTING/2020-21/137 Date: 20/06/2021 To, The Director, Hitech Civil Test Labs Pvt. Ltd. Agarwal Nursery, Gendhukheda, Near D-Mart, Kolar Road, Bhopal -462042 (M.P.) Email: deepak.htetl@gmail.com Kind attention: Mr Deepak Mishra mob: +91-8839707530 Subject: Work Order for Mechanical (Field Test) and Non Destructive Test Project: Rehabilitation and Up-gradation from Jabalpur to Hiran river Section of NH-12 (New NH no, 45) to four ~lanes with paved shoulder configuration from Km. 10.400 to Km, 666.000 (Design Length 55.600 Kms.) [Package-1] in the state of Madhya Pradesh on EPC mode. under NHDP-IV through Contract. With reference to your above proposal and subsequent discussions between M/S WAGAD INFRAPROJECTS PRIVET LIMITED (hereafter referred as “Employer “or “WIPL") and M/S HITECH CIVIL TEST LABS PRIVET LIMITED (herein after referred as Contractor”), the Employer is pleased to place this Work Order (“WO / Contract”) in favour of the Contractor for Conducting Mechanical (Field Test) and Non Destructive Test as per enclosed BoQ (collectively referred to as the “Works”), at our on-going project site “Rehal jon and Up-gradation from Jabalpur to Hiran river Section of NH-12 (New NH no. 45) to four lanes with paved shoulder configuration from Km. 10.400 to Km. 66.000 (Design Length 55.600 Kms.) [Package-1] in the state of Madhya Pradesh on EPC mode. under NHDP- Page of S WAGAD INFRAPROJECTS PVC. LTD. 414, TIME SQUARE ARCADE, NEAR BAGHBAN PARTY PLOT, THALTE-SILAJ ROAD, AHMEDABAD-260 059 admin@wagadiniracom —@Y wwrawagadinra.com —€ 1.079-3521 2802 ‘im vre2006 20130117128 & WAGAD IV through Contract (collectively referred to as “Project Site”), subject to the terms and Unit Rate (IN INR) Hard Shoulder Per Sample Bridge Load Test Per Span Cement Conerete Core (Cutting with Testing) Per Core Rebound Hammer Per Point Ultrasonic Pulse Velocity Per Point Roughness Test (B1) Per Lane Per KM executed by contractor. For, WAGAD INFRAPROJECTS Authorized Signatory & stam ‘Termsand Conditions: issued on unit quantity basis the billing will be as per actual certified quantity ‘Authorized Signatory Parent Contract Agreement to the satisfaction of the WIPL and the Independent Engineer. Also following has: report in triplicate, WAGAD INFRAPROJECTS PVC. LED. 414, TIME SQUARE ARCADE, NEAR BAGHBAN PARTY PLOT, THALTEDSHILAJ ROAD, AHMEDABAD-380 059, imin@wagadintacom G3 worwwagatinta com & rov9-as21 2802 Page 2 0f 5 ‘in UrozonGszo12eTC17129 dl ad 1 = [ 3 [4 5. 6. | Transportation (To and From Bhopal) ‘The Work order is PRIVET LIMITED. y= beeaTee 1, Scope: The Sub-Contractor shall carry out the works ("Works") as per BOQ and Provision of i. Submission of method statement ii, Conducting tests in presence and satisfaction of WIPL/IE/Client and submission of 9 = = : & ‘The Contractor shall carry out the Works in compliance with the prevailing Technical Specifications /IRC/Parent Contract Agreement/IS/MoRTH. 2 Commencement: The Commencement Date of Work shall be the date on which the Contractor commences work and the same shall not be later than 28/05/2021 3. Contract Period: =. 02 months from Contract Date. 4. The quantities indicated hereinabove/BOQ are approximate and actual execution shall vary 9 a than approximate as per requirement of WIPL. 5. Payment Terms: a. Payment will be made within 15 working days after submission of RA bill by the Contractor along with all relevant documents in support of the same as measurement sheet, reconciliation of issued material, duly certified from the Project Manager/Site In-charge of WIPL with quantities executed. Following deductions as applicable will be made from the bill (Deductions on account of any statutory non-compliances; (i) TDSasperlaw b, The work shall not be deemed to be completed until the Contractor has obtained satisfactory completion certificate from Project Manager / Site In-charge of WIPL. ©. The Contractor shall make arrangement to pay to its labour or staff. WIPL will not be liable to pay any amount to any labour/Party of the Contractor. 4. Contractor will be eligible for claiming 70% of the BOQ amount after completion of the test and 30% after approval of test report. 6. Taxes: ‘The rate mentioned is exclusive of all applicable taxes. GST will be payable extra as actual. Income tax shall be deducted/ applied as applicable. 7. ‘The Contractor should use materials of good quality which shall be approved by Site In- charge prior to incorporating them into the Works. 8. Following activities shall fall within WIPL Scope of Work: Site clearance and access to the test location. b. Co-ordination and approval ofall testing related activities from NHAI/Consultant, ©. Electricity connection (3 phase) for welding machine. Lighting arrangement at site during testing. Page 3 of 5 WAGAD INFRAPROJECTS PVT, LTD. 414 TIME SQUARE ARCADE, NEAR BAGHBAN PARTY PLC, THALTE SHAY ROAD, AMMEDABAD-360 059 sdrinowogainracom —@ wwnsmagadaiacom 1079. 35212802 ew-urozoogseonerenins % 4, Hydra / Crane for unloading, loading and for placing of girder. e. Water required for drinking will be supplied by WIPL free of cost. 9. Subcontractor/Contractor will arrange its own PPE for all staff without fail. 10. Housekeeping: Housekeeping of the site where the work are executed and labour/Staff ‘camp shall be carried out by the Contractor at its own cost. 11. The details of Contractor are as under: WAGAD Full Name :| Hitech Civil Test Labs Pvt. Ltd. Status Firm/Company/Propt ‘Company Full Address(*) 2] Hitech Civil Test Labs Pvt. Ltd. | | Agarwal Nursery, Gendhukheda, Near D- Mart, Kolar Road, Bhopal -462042 (M.P.) 4] PAN No. @) :| AADCH4002P 3| GST No.) 23AADCH4002P1ZR 6| Name of Authorized Person (POA®) ‘Deepak Mishra a - 7| Contact Number of Authorized Person | :| 8839707530/ 8435255856 8] Type of Work Work Onder for Mechanical (Field Test) and Non Destructive Test. 12, The Contractor will be required to perform the activities as per planning schedule given {ime to time and instructions given by our Project Manager/Site In-charge. a) Termination: The WO shall be terminated on the issuance of successful Completion of Works by the Project Manager / Site In-charge, until and unless the same is extended further by us. ) Incase of default on the part of the Contractor in carrying out any component of the Works in accordance with the provisions of this WO/ stipulations given in MoRTH Specifications within the time specified herein, we reserve the right to either terminate the WO by giving 1 (One) days’ notice or at our discretion, we may direct you to cure the default within specified time period. 13. Right to inspection: WiPL shall have the right to inspect all works under or in course of execution or executed in pursuance of this WO at all times. 14. Rules & Regulations: a, The Contractor shall abide by the rules and regulations as mentioned in this WO, Page 4of 5 414, TIME SQUARE ARCADE, NEAR BAGHBAN PARTY PLOT, THALTELSHILAJ ROAD, AHMEDABAD-380 059 aieingengndiieacom — @ wornwagndntincom 1079-3521 2002 emuromoc.zouprenn oe Cd WAGAD INFRAPROJECTS PVT. LCD. 9 = : & WAGAD # - b, The Contractor shall strictly follow the minimum wages rule & workman rules fixed by appropriate Govt. authorities & mo underage labour/Staff should be engaged as per prevailing labour rules issued by the Ministry of Labour, Govt. of India. ‘The Contractor is liable and responsible for complying with the provisions of the Employees Provident Funds and Miscellaneous Provision Act 1952 (latest revision) and schemes framed there under, in so far, they are applicable to this Project. 9 5S . The Contractor shall be responsible for complying with all statutory requirements as per applicable laws. Failure to comply with the requirements of the safety norms in carrying out the works can lead to levying of penalty to be decided by WIPL on case to case basis keeping in view the seriousness of the abrasion, or termination of Work Order. ©. ‘The Contractor will keep one qualified person for supervision of the Works including preparation &submission of measurement sheet as required. ‘The Contractor shall arrange meals and accommodation for his labour/Staff. The Contractor will be responsible for cleaning the work place after completion of daily work. h. ‘The Contractor shall obtain requisite insurances as may be required as per Good Industry Practice. 15, Amicable Settlement :In case of any dispute or difference with regard to the Work being executed, the Parties shall endeavor to a bly settle the same 16. Jurisdiction: The Courts of AHMEDABAD shall have exclusive jurisdiction in the matters arising under this Order. For, WAGAD INFRAPROJECTS For, MIS MITECH CIVIL TEST LABS PRIVET LIMITED. Authorized Signatory & WAGAD INFRAPROJECCS PVE. LCD. 418, TIME SQUARE ARCADE, NEAR BAGHEAN PARTY PLOT, THALTEsSHILAJ ROAD, AHMEDABAD-380 059 mimin@wagadistacom G3 wwnmagadatiacom —&1:079-3821 2802 cin uToanoe a0uTeaaTI29

You might also like