You are on page 1of 1

Site Core Testing

Date of Laying 23-12-2020 Bulk Specific Gravity (Gsb) 2.714


Date of Core Cutting 24-12-2020 Effective Specific Gravity (Gse) 2.75
Apparent Specific Gravity (Gsa) 2.786

Specific Gravity of Bitumen (Gb) 1.04

Sl. No.
1 2 3 4 5 6 7 8 9 10
Particulars

Chainage 42+150 42+120 42+090 42+060 42+035 42+005 41+970 41+930 41+870 41+800

Side RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

Offset 1 2 3 2.5 1.5 2 3 1 2.5 3.2

Core Thickness 36 50 46 42 35 39 60 30 60 40

% Bitumen Content of Total Mix (Pb) 1 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4

% Agg Content of Total Mix (Ps) 2 94.60 94.60 94.60 94.60 94.60 94.60 94.60 94.60 94.60 94.60

Wt of Sample in Air, gm 3 516.5 792.0 763.6 700.6 513 815.3 1050.7 495.2 1022 644.6

Wt of Sample in Water, gm 4 303.0 465.0 450.0 406 299.6 470 617 291 601 381.5

Wt of SSD Sample in Air, gm 5 516.7 793.0 764.0 701 513.6 816 1052 496 1025 645

Volume, cc 6 213.7 328.0 314.0 295.0 214.0 346.0 435.0 205.0 424.0 263.5

Bulk Density (Gmb), g/cc 7 2.417 2.415 2.432 2.375 2.397 2.356 2.415 2.416 2.410 2.446

Max. Theoretical Sp. Gr. (Gmm) 8 2.530 2.530 2.530 2.530 2.530 2.530 2.530 2.530 2.530 2.530

% Air Voids in Mix, Va = (8-7)/8)*100 9 4.47 4.56 3.88 6.13 5.25 6.86 4.53 4.52 4.73 3.31

% VMA = 100-(7*2/Gsb) 10 15.75 15.83 15.23 17.22 16.44 17.87 15.81 15.80 15.98 14.73

% VFB = (10-9/ 10)*100 11 71.63 71.20 74.53 64.40 68.08 61.58 71.35 71.39 70.42 77.54

Compaction % 95.5 95.4 96.1 93.9 94.8 93.1 95.5 95.5 95.3 96.7

You might also like