Design Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana
Phase - 1 (Economic Corridor) in the state of Madhya Pradesh on HAM Mode
A
5 Theoretical Max.Specific Gravity of Mixture Gmm ---- 2.632
A+B-C
For EPC Rep. For Concessionaire Rep. For Independent Engineer Rep.
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design Ch. 30.000 (Length -
30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
MARSHALL TEST DATA
[As per ASTM D: 1559]
Source of Material : Dhanwada Crusher Date of Sampling :
Type of Material : Ashphalt Mix Date of Testing :
Chainage / Location : LAB Trail Sampled by : -------
Proposed Use : BC Gr-1 Tested by : -------
Grade of Bitumen : CRMB-60 Bulk Specific Gravity (Gsb) 2.796
Correction Factor of Proving Ring : 7.46 Specific Gravity of Bitumen (Gb) 1.03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 5.00 95.00 1254.2 759.1 1256.0 496.9 2.524 2.626 3.88 14.24 72.74 205 1529.3 1.04 1590.5 3.1
2 5.00 95.00 1258.1 760.0 1259.1 499.1 2.521 2.626 4.01 14.35 72.07 220 1641.2 1.04 1706.8 2.9
3 5.00 95.00 1255.5 759.5 1257.3 497.8 2.522 2.626 3.96 14.31 72.34 215 1603.9 1.04 1668.1 3.3
1 5.00 95.00 1255.9 760.1 1257.3 497.2 2.526 2.626 3.81 14.18 73.12 200 1492.0 1.04 1551.7 3.6
2 5.00 95.00 1260.0 761.1 1261.1 500.0 2.520 2.626 4.04 14.38 71.92 215 1603.9 1.04 1668.1 3.0
3 5.00 95.00 1253.8 758.0 1255.0 497.0 2.523 2.626 3.93 14.28 72.47 225 1678.5 1.04 1745.6 3.2
Average of Both set 2.523 2.626 3.94 14.29 72.44 1591.5 1655.1 3.2
Remarks :
For EPC Rep. For Concessionaire Rep. For Independent Engineer Rep.
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from
Design Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana
Phase - 1 (Economic Corridor) in the state of Madhya Pradesh on HAM Mode
A
5 Theoretical Max.Specific Gravity of Mixture Gmm ---- 2.6261
A+B-C
For EPC Rep. For Concessionaire Rep. For Independent Engineer Rep.
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design Ch. 30.000 (Length -
30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
MARSHALL TEST DATA
[As per ASTM D: 1559]
Source of Material : Dhanwada Crusher Date of Sampling :
Type of Material : Ashphalt Mix Date of Testing :
Chainage / Location : LAB Trail Sampled by : -------
Proposed Use : BC Gr-1 Tested by : -------
Grade of Bitumen : CRMB-60 Bulk Specific Gravity (Gsb) 2.796
Correction Factor of Proving Ring : 7.46 Specific Gravity of Bitumen (Gb) 1.03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 5.10 94.90 1255.9 758.1 1256.8 498.7 2.518 2.621 3.92 14.52 73.03 195 1454.7 1.04 1512.9 3.3
2 5.10 94.90 1253.1 759.5 1254.5 495.0 2.532 2.621 3.41 14.08 75.75 180 1342.8 1.04 1396.5 3.6
3 5.10 94.90 1255.6 758.9 1257.0 498.1 2.521 2.621 3.82 14.44 73.52 180 1342.8 1.04 1396.5 3.7
1 5.10 94.90 1255.7 759.5 1257.8 498.3 2.520 2.621 3.85 14.47 73.36 200 1492.0 1.04 1551.7 3.7
2 5.10 94.90 1256.6 759.9 1258.0 498.1 2.523 2.621 3.75 14.37 73.93 190 1417.4 1.04 1474.1 3.8
3 5.10 94.90 1253.9 760.1 1255.5 495.4 2.531 2.621 3.43 14.09 75.66 185 1380.1 1.04 1435.3 3.6
Average of Both set 2.524 2.621 3.70 14.33 74.21 1405.0 1461.2 3.6
Remarks :
For EPC Rep. For Concessionaire Rep. For Independent Engineer Rep.
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from
Design Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana
Phase - 1 (Economic Corridor) in the state of Madhya Pradesh on HAM Mode
A
5 Theoretical Max.Specific Gravity of Mixture Gmm ---- 2.6205
A+B-C
For EPC Rep. For Concessionaire Rep. For Independent Engineer Rep.
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-59A) from Design Ch. 0.000 To Design Ch. 30.000 (Length -
30.00 Km) under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of Madhya Pradesh on HAM Mode
Client : National Highway Authority of India
Independent Engineer : Lion Engineering Consultant Private Limited
Concessionaire : Harda Pathways Private Limited
EPC : Prakash Asphaltings & Toll Highways India Limited
MARSHALL TEST DATA
[As per ASTM D: 1559]
Source of Material : Dhanwada Crusher Date of Sampling :
Type of Material : Ashphalt Mix Date of Testing :
Chainage / Location : LAB Trail Sampled by : -------
Proposed Use : BC Gr-1 Tested by : -------
Grade of Bitumen : CRMB-60 Bulk Specific Gravity (Gsb) 2.796
Correction Factor of Proving Ring : 7.46 Specific Gravity of Bitumen (Gb) 1.03
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 5.20 94.80 1260.1 760.9 1261.0 500.1 2.520 2.615 3.64 14.57 74.98 175 1305.5 1.04 1357.7 3.9
2 5.20 94.80 1256.1 759.3 1258.0 498.7 2.519 2.615 3.68 14.60 74.79 180 1342.8 1.04 1396.5 4.1
3 5.20 94.80 1256.9 758.9 1257.9 499.0 2.519 2.615 3.68 14.60 74.81 180 1342.8 1.04 1396.5 4.0
1 5.20 94.80 1258.2 760.0 1259.3 499.3 2.520 2.615 3.64 14.56 75.03 200 1492.0 1.04 1551.7 4.3
2 5.20 94.80 1255.1 758.4 1256.6 498.2 2.519 2.615 3.66 14.58 74.90 180 1342.8 1.04 1396.5 3.7
3 5.20 94.80 1259.2 760.8 1260.5 499.7 2.520 2.615 3.64 14.56 75.03 195 1454.7 1.04 1512.9 4.5
Average of Both set 2.519 2.615 3.66 14.58 74.92 1380.1 1435.3 4.1
Remarks :
For EPC Rep. For Concessionaire Rep. For Independent Engineer Rep.
Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old NH-5
Design Ch. 30.000 (Length - 30.00 Km) under Bharatmala Pariyojana Phase - 1 (Ec
of Madhya Pradesh on HAM Mode
100
90
80
70
60
Ā% Passing
50
40
30
20
10
0
0.101 1.01
ĀSieve Size in mm 10.1
Remarks:
of DBM GR-1
35.0 61.16 59 79
35.0 57.19 52 72
34.9 42.61 35 55
29.4 30.94 28 44
22.4 23.14 20 34
15.0 15.30 15 27
12.6 12.59 10 20
7.7 7.66 5 13
3.9 3.85 2 8
10.1 101